Construction Of Spt Bridge No. 2 / 1 And 4 / 1 On 7Th Km Of Kd Road To Fauskarkuti Under Badp For The Year 2017-18.
Tender Value
65 Lakhs
Estimated cost
Bid Submission
17 Jan 2023
0 days left
EMD
1.30 Lakhs
Bank guarantee accepted
Document Fee
2000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
gauripur → Assam
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Spt Bridge No. 2 / 1 And 4 / 1 On 7Th Km Of Kd Road To Fauskarkuti Under Badp For The Year 2017-18.
BOQ
| Sl. No. | Item Description |
| 1 | Construction of SPT Br. 2/1 4/1 |
| 2 | Labour for dismantling all members of the timber bridge excluding piles with necessary scaffolding, jati bamboos, jumper ropes etc. complete and stacking them at suitable palces as directed all members will be under custody of the contractor till taken over by the department for SPT Br. No. 2/1 |
| 3 | Labour for dismantling all members of the timber bridge excluding piles with necessary scaffolding, jati bamboos, jumper ropes etc. complete and stacking them at suitable palces as directed all members will be under custody of the contractor till taken over by the department for SPT Br. No. 4/1 |
| 4 | Supply and driving sal wood pile 25 cm to 30 cm dia dressed to heart wood including marking length in every 30 cms intervals coaltering 2 two coats with best tar applied hot rate is inclusive of the cost of required quanity oftar a using sal timber for SPT Br. No. 2/1 |
| 5 | Supply and driving sal wood pile 25 cm to 30 cm dia dressed to heart wood including marking length in every 30 cms intervals coaltering 2 two coats with best tar applied hot rate is inclusive of the cost of required quanity oftar a using sal timber for SPT Br. No. 4/1 |
| 6 | Portion of pile remaining for 2/1 |
| 7 | Protion of Pile remaining for 4/1 |
| 8 | Scarfing and joining piles 25 cm to 30 cm diameter, dressed to heartwood of 90 km in length including supplying, fitting and fixing with 2 Nos. of 50 mm x 10 mm MS FI clamps and 16 mm dia MS bolts and nuts etc. complete as directed. Timber for piles and coal tarring shall be measured and paid separetely. For Br. No. 2/1 |
| 9 | Scarfing and joining piles 25 cm to 30 cm diameter, dressed to heartwood of 90 km in length including supplying, fitting and fixing with 2 Nos. of 50 mm x 10 mm MS FI clamps and 16 mm dia MS bolts and nuts etc. complete as directed. Timber for piles and coal tarring shall be measured and paid separetely. For Br. No. 4/1 |
| 10 | Supplying, fitting and fixing timber beam and bearing beam rectangular in size fitted with M.S. etc. suplying spikes etc. as necessary and coaltarring 2 (Two) coats with best tar applied hot as directed Rate inclusive of cost of the required quantity of tar, for SPT Br. No. 2/1 |
| 11 | Supplying, fitting and fixing timber beam and bearing beam rectangular in size fitted with M.S. etc. suplying spikes etc. as necessary and coaltarring 2 (Two) coats with best tar applied hot as directed Rate inclusive of cost of the required quantity of tar, for SPT Br. No. 4/1 |
| 12 | Labour for fitting and fixing RSJ beam, Old CI saddle etc. in position including necessary scaffolding and fixing necessary bolts nd nuts, painting two coats complete as directed Tar Steel paints to be supplied by the constractor at his own RS Joist 600 mm x210 mm size |
| 13 | Wood work including supplying, fitting and fixing complete with necessary M.S. Bolts, nuts, nails, screw etc. ad coal tarring two coats with best tar applied hot Rate is inclusive of the cost of the required quantity of tar a) Undressed in floor, planks, collar, bracing, standrds W.G. struts nad railling, runner belts, rail posts etc.for SPT Br. No. 2/1 |
| 14 | Wood work including supplying, fitting and fixing complete with necessary M.S. Bolts, nuts, nails, screw etc. ad coal tarring two coats with best tar applied hot Rate is inclusive of the cost of the required quantity of tar a) Undressed in floor, planks, collar, bracing, standrds W.G. struts nad railling, runner belts, rail posts etc.for SPT Br. No. 4/1 |
| 15 | In Track way planks alternate railling to be done wit decking in a straggered way for SPT Br. No. 2/1 |
| 16 | In Track way planks alternate railling to be done wit decking in a straggered way for SPT Br. No. 4/1 |
| 17 | Providing and errecting direction and place identification retro-reflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 fixed over aluminium sheeting 2 mm thick with area not exceedign 0.90 sqm supported on mild steel sungle angle iron post 75x75mmx6mm firmly fixed to the ground by means of properly desined foundation with M15 grade cement concrete 450x450, 600mm below ground level as per approved drawing and technical specification clause 1701 for SPT Br. No. 2/1 |
| 18 | Providing and errecting direction and place identification retro-reflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide clause 1701.2.3 fixed over aluminium sheeting 2 mm thick with area not exceedign 0.90 sqm supported on mild steel sungle angle iron post 75x75mmx6mm firmly fixed to the ground by means of properly desined foundation with M15 grade cement concrete 450x450, 600mm below ground level as per approved drawing and technical specification clause 1701 for SPT Br. No. 4/1 |
| 19 | Making 120 mm wide bamboo foot bridge with 100 mm Bholuka or Barua Bamboo posts driven 120 cm to 180 cm underground 3 nos. in each row and rows being 3 m apart Bhoulka or Barua Bamboo Dham placed over the po0sts and tied with cane or wire, Bholuka or Barua Bamboo struts in each row both up nad down streem Jati bamboo long gorhs closely packed and tied with Dham. Single layer of mat placed over 75 mm thick brush wood and tied with Bhoulka or Barua Bamboo rail stand fixied in one side of Bridge etc complete. For Br. No. 2/1 |
| 20 | Making 120 mm wide bamboo foot bridge with 100 mm Bholuka or Barua Bamboo posts driven 120 cm to 180 cm underground 3 nos. in each row and rows being 3 m apart Bhoulka or Barua Bamboo Dham placed over the po0sts and tied with cane or wire, Bholuka or Barua Bamboo struts in each row both up nad down streem Jati bamboo long gorhs closely packed and tied with Dham. Single layer of mat placed over 75 mm thick brush wood and tied with Bhoulka or Barua Bamboo rail stand fixied in one side of Bridge etc complete. For Br. No. 4/1 |
| 21 | Supply , fitting and fixing U shaped flat iron strap making 0.50mx0.30m size from 150mmx12mm size MS flat including providing 10 bolts holes nad fitting with 0.35 m long 20 mm dia MS bolts including fitting tightly with bearing beam, pile and RSJ beams etc compete as directed for SPT Br. No 2/1 |
| 22 | Supply , fitting and fixing U shaped flat iron strap making 0.50mx0.30m size from 150mmx12mm size MS flat including providing 10 bolts holes nad fitting with 0.35 m long 20 mm dia MS bolts including fitting tightly with bearing beam, pile and RSJ beams etc compete as directed for SPT Br. No 4/1 |
| 23 | Providing and laying of boulder appron laid in wire crates with 4 mm dia Gi wire conforming to IS:280 and IS:4826 m 100 mm x 100 mm mesh woven diagonally including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 Kg each as per drawing and technical specifications Clause 1301. for SPT Bro. No. 2/1 |
| 24 | Providing and laying of boulder appron laid in wire crates with 4 mm dia Gi wire conforming to IS:280 and IS:4826 m 100 mm x 100 mm mesh woven diagonally including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 Kg each as per drawing and technical specifications Clause 1301. for SPT Bro. No. 4/1 |
| 25 | Providing, .laying pitching on slopes laid over prepared filter media as per drawing and technical specification Clause 1302 for SPT Br. No. 2/1 |
| 26 | Providing, .laying pitching on slopes laid over prepared filter media as per drawing and technical specification Clause 1302 for SPT Br. No. 4/1 |
| 27 | Providing and laying filter meterial underneath pitcing in slopes complete as per drawing and Technical Speficiation Clause 1302 as per Item No. 14.6 for SPT Br. No. 2/1 |
| 28 | Providing and laying filter meterial underneath pitcing in slopes complete as per drawing and Technical Speficiation Clause 1302 as per Item No. 14.6 for SPT Br. No. 4/1 |
| 29 | Earthwork in filling in the guide hund by head load up to lead of 60 m with approved quality all leads and lifts ramining andcompacting with ranner weighing not less than 10 Kg and falling from height of not less than 90 cm and sprink ling with water if necessary, earth is to collected after removing the 1st 20 Km of lop soil and should be free from grass, shrubs nad other forejon matter nd rate will be including payment of land conection for SPT Br. No. 2/1 |
| 30 | Earthwork in filling in the guide hund by head load up to lead of 60 m with approved quality all leads and lifts ramining andcompacting with ranner weighing not less than 10 Kg and falling from height of not less than 90 cm and sprink ling with water if necessary, earth is to collected after removing the 1st 20 Km of lop soil and should be free from grass, shrubs nad other forejon matter nd rate will be including payment of land conection for SPT Br. No. 4/1 |
| 31 | Single Bamboo palsding, walling of whole 2nd class bamboo Jati or Bethuai 75 mm dia and closely packed & driven including fitting fixing with half bamboo kamis horizontally in those rows with cane or tying with wire complete and struts 1.5 m apart longthudinally nd providing brush wood as per drawing and technical specification Clause 1302.5. Dirven at least 900 mm below ground and 1200 mm above ground, SPT Br.No. 2/1 |
| 32 | Single Bamboo palsding, walling of whole 2nd class bamboo Jati or Bethuai 75 mm dia and closely packed & driven including fitting fixing with half bamboo kamis horizontally in those rows with cane or tying with wire complete and struts 1.5 m apart longthudinally nd providing brush wood as per drawing and technical specification Clause 1302.5. Dirven at least 900 mm below ground and 1200 mm above ground, SPT Br.No. 4/1 |
| 33 | Collection and supply Gravel, Quarry spall at site from Quarry free from dust and dirt and other organic and deleterious consitients including stacking in measurale stacks, for SPT Br. No. 2/1 |
| 34 | Collection and supply Gravel, Quarry spall at site from Quarry free from dust and dirt and other organic and deleterious consitients including stacking in measurale stacks, for SPT Br. No. 4/1 |
| 35 | Labour for sprading metal gravel, granular material on the road surface as directed including dressing and cambering the formation and utilizing the looser earth in filling the depression as directod including carriage of gavel within 30 m for SPT Br. No. 2/1 |
| 36 | Labour for sprading metal gravel, granular material on the road surface as directed including dressing and cambering the formation and utilizing the looser earth in filling the depression as directod including carriage of gavel within 30 m for SPT Br. No. 4/1 |
AI Tender Summary
Tender Timeline
Jan 05, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedJan 17, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJan 18, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer