| 1 | SUPPLY OF ECTROMAGNETIC FLOWMETERS FOR MSB UNIT FOR NREP PROJECT |
| 2 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P22- FT-870001)as specified in Material Requisition. |
| 3 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P22- FT -880001)as specified in Material Requisition. |
| 4 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P23- FT -460101)as specified in Material Requisition. |
| 5 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P23- FT -460102)as specified in Material Requisition. |
| 6 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P23- FT -633102)as specified in Material Requisition. |
| 7 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P23- FT -870101)as specified in Material Requisition. |
| 8 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P23- FT -878101)as specified in Material Requisition. |
| 9 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P24- FT -410003)as specified in Material Requisition. |
| 10 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P24- FT -410004)as specified in Material Requisition. |
| 11 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P24- FT -870002)as specified in Material Requisition. |
| 12 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P24- FT -870201)as specified in Material Requisition. |
| 13 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P24- FT -872601)as specified in Material Requisition. |
| 14 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P24- FT --875601)as specified in Material Requisition. |
| 15 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P24- FT -875602)as specified in Material Requisition. |
| 16 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P24- FT -880002)as specified in Material Requisition. |
| 17 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P24- FT -880003)as specified in Material Requisition. |
| 18 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P22- FT -450001)as specified in Material Requisition. |
| 19 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P22- FT -490001)as specified in Material Requisition. |
| 20 | Charges for SITE Supervision of Erection / Installation andTesting for scope as defined in MR for ELECTROMAGNETIC FLOWMETERS |
| 21 | Per diem charges for upto 8 hours work on normal working days. |
| 22 | Overtime rate / hour beyond normal 8 hours work on normal working days. |
| 23 | Overtime rate / hour for work on weekly off days / holidays (as applicable to Refinery site). |