Numaligarh Refinery Limited has published Tender For Supply Of Electro-Magnetic Flowmeter For Msb Unit As Per Technical Specifications For Numaligarh Refinery Limited. Submission Date for this Tender is 15-03-2023. EPC Work Tenders in numaligarh Assam. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 26-Jan-2023 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 02-02-2023 |
2 | 31-Jan-2023 | Addendum_2_ELMG_FM_CommClar1 | Other | 02-02-2023 |
3 | 02-Feb-2023 | Addendum_4_Ext2 | Date | 13-02-2023 |
4 | 14-Feb-2023 | Extension_5_Extn_3 | Date | 20-02-2023 |
5 | 21-Feb-2023 | Extension_6_Extn_4 | Date | 27-02-2023 |
6 | 28-Feb-2023 | Addendum_7_EMG_FM_Ext5 | Date | 06-03-2023 |
7 | 08-Mar-2023 | Addendum_8_EMG_FM_Ext6 | Date | 15-03-2023 |
Sl. No. | Item Description |
1 | SUPPLY OF ECTROMAGNETIC FLOWMETERS FOR MSB UNIT FOR NREP PROJECT |
2 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P22- FT-870001)as specified in Material Requisition. |
3 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P22- FT -880001)as specified in Material Requisition. |
4 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P23- FT -460101)as specified in Material Requisition. |
5 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P23- FT -460102)as specified in Material Requisition. |
6 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P23- FT -633102)as specified in Material Requisition. |
7 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P23- FT -870101)as specified in Material Requisition. |
8 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P23- FT -878101)as specified in Material Requisition. |
9 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P24- FT -410003)as specified in Material Requisition. |
10 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P24- FT -410004)as specified in Material Requisition. |
11 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P24- FT -870002)as specified in Material Requisition. |
12 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P24- FT -870201)as specified in Material Requisition. |
13 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P24- FT -872601)as specified in Material Requisition. |
14 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P24- FT --875601)as specified in Material Requisition. |
15 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P24- FT -875602)as specified in Material Requisition. |
16 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P24- FT -880002)as specified in Material Requisition. |
17 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P24- FT -880003)as specified in Material Requisition. |
18 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P22- FT -450001)as specified in Material Requisition. |
19 | Design, detail engineering, procurement, manufacturing, assembly, testing & inspection at manufacturer’s works, packing, forwarding, transportation, route survey (if required), and supply till site including Commissioning spares, Mandatory spares , Special Tools & Tackles ,Consumables, 2 Year Operational Spares & Third Part Inspection Charges for ELECTROMAGNETIC FLOWMETERS (TAG NO.1P22- FT -490001)as specified in Material Requisition. |
20 | Charges for SITE Supervision of Erection / Installation andTesting for scope as defined in MR for ELECTROMAGNETIC FLOWMETERS |
21 | Per diem charges for upto 8 hours work on normal working days. |
22 | Overtime rate / hour beyond normal 8 hours work on normal working days. |
23 | Overtime rate / hour for work on weekly off days / holidays (as applicable to Refinery site). |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail