Housing Urban and Rular Development Local Bodies Closing in 0 days TDR #35576682

Renovation Of Agamtlibararybuilding And New Toilet Atdevarkudiyiruppu In Alivalam Panchayatpart 2 Renovation Of Agamtlibararybuilding And New Toilet At Kuruchi Panchayat Part 3 Renovation Of Agamtlibararybuilding And New Toilet At Seruvaviduthi Southpanch

Issued by Local Bodies · peravurani, Tamil Nadu
Tender Value
12.30 Lakhs
Estimated cost
Bid Submission
12 Jan 2023
0 days left
EMD
12300
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
peravurani → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Renovation Of Agamtlibararybuilding And New Toilet Atdevarkudiyiruppu In Alivalam Panchayatpart 2 Renovation Of Agamtlibararybuilding And New Toilet At Kuruchi Panchayat Part 3 Renovation Of Agamtlibararybuilding And New Toilet At Seruvaviduthi Southpanchayatpart 4 Renovation Of Agamtlibararybuilding And New Toilet Atkalagampanchayat Part 5 Renovation Of Agamtlibararybuilding And New Toilet Atkalluranikkadu Panchayatpart 6 Renovation Of Agamtlibararybuilding Atvalapiramankadu Panchayatpart 7 Renovation Of Agamtlibararybuilding And New Toilet Atsornakkadupanchayat

BOQ

Name of Work:Part 1 Renovation of AGAMTlibararyBuilding and New Toilet atDevarkudiyiruppu in Alivalam PanchayatPart 2Renovation of AGAMTlibararyBuilding and New Toilet at Kuruchi Panchayat Part 3Renovation of AGAMTlibararyBuilding and New Toilet at Seruvaviduthi southPanchayatPart 4Renovation of AGAMTlibararyBuilding and New Toilet atKalagamPanchayat Part 5Renovation of AGAMTlibararyBuilding and New Toilet atKalluranikkadu PanchayatPart 6Renovation of AGAMTlibararyBuilding atValapiramankadu PanchayatPart 7Renovation of AGAMTlibararyBuilding and New Toilet atSornakkaduPanchayat
Sl. No. Item Description
1Part 1 Renovation of AGAMTlibararyBuilding and New Toilet atDevarkudiyiruppu in Alivalam Panchayat
2Chipping of wall cracks including all labour charges etc, complete
3Pressed tiles of size 20x20x20m with cm 1:3 mix all colours including all labour charges etc., complete
4Plastering with cement mortar 1:3 mixto 10mmthick including cost and conveyance of all materials to site and all labour charges etc
5Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc
6Distempering two coats over priming coat including cost andconveyance of all materials to site and all labour charges etc complete
7Exterior Emulsion two coats over priming coat including cost and conveyance of all materials to site and all labour charges etc complete
8Painting two coats over old iron works using ready mixed enamel paint including cost and conveyance of materials and all labour charges etc complete
9Provision for Electification
10Light / Fan Point (SD 23)
11Ceiling fan (SD 110)
12EB Metre board (SD 125)
13Service wire (SD 65)7/20
1425mm GI Pipe(SD 70)
15CFL (SD 80)
16Repair to doors and windows
17Provision for Name board
18Filter
19Drillig of borewells anywhere in tamilnadu including transportation from one place to anotherwith in tamilnadu in alluvial soil sedimentary strate of clay and sand stone shale pebbles boulders etc by first taking a pilot bore of 140mm/150mm dia and then enlarging to required dia direct or reverse rotary mud circulation method using rotary rigs, fuel, labour and drilling bentonite and water required for drillling at site
20Cost and supply of special blue slotted PVC pipe for borewell
21Cost and supply of PVC of End cap
22Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock required blasting but inclusive of shoring strutting and boiling out water whenever necessary etc complete complying with standard specification
23Supplying and filling in basement with filling river sand in layer of not more than 15 cm thick well rammed etc., complete
24Cement concrete 1:4:8mix using 40mm gauge hand broken granite granite tone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete
25Cement concrete 1:3:6mix using 20mm gauge hand broken granite granite tone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete
26Supplying and erecting centering for sides centering for soffits of RCC slabs of plane surface like lintels, beams etc below basement
27Filling the soak pit with 40mm metal as per specification
28Filling the soak pit with 20mm metal as per specification
29Construction of New toilet (Disabled friendly) to libarary building at Devarkudiyiruppu in Alivalam panchayat
30Earthwork excavation and depositing on bank with initial lift of 2.00m in hard stiff clay, Stiff Black cotton soil, hard red earth, shales, Murram etc., as per SS 20 B
31Supplying and filling in basement with filling river sand in layer of not more than 15 cm thick well rammed etc., complete
32Cement concrete 1:4:8mix using 40mm gauge hand broken granite granite tone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete
33Brickwork in CM 1:5 using secondclass bricks of size 23 x11.5x 7.5 cm for the following including mixing mortar and all other labour charges etc complete
34RCC 1:1:5:3 using 20mm metalincluding cost and conveyance of all materials to siteand labour charges etc., complete
35Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC Column footing column plinth beam, beams , roof slabs , staircase steps , bed blocks, critical pier etc
36Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length , bending toand tying in position and forming grill for all RCC works
37Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc
38Plastering with cement mortar 1:3 mixto 10mmthick including cost and conveyance of all materials to site and all labour charges etc
39Paving the floor with scratch proof ceramic tile of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
40Dadooing of walls with glazed tiles of size 300mmx200mmx6mmcost and includingconveyance of all materials to site and all labour charges etc complete
41Oil bound Distember painting two coats with approved distember including cost and conveyance of all materials to and all labour charges etc complete
42Exterior Emulsion two coats over priming coat including cost and conveyance of all materials to site and all labour charges etc complete
43Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
44Supply offixing of RCC jolly 0.4x0.45 etc complete
45Supply & fixing in position of European type water closet 580 x 440 mm of approved quality including cost and conveyance of all materials to site etc complete
46Filling the soak pit with 40mm metal as per specification
47Filling the soak pit with 20mm metal as per specification
48Filling the soak pit with sand as per specification
49Supplying and fixing of RCC rings 900mm for leach pit etc complete
50Supplying and fixing of RCC coverslab 900mm for leach pit etc complete
51Part 2Renovation of AGAMTlibararyBuilding and New Toilet at Kuruchi Panchayat
52Chipping of wall cracks including all labour charges etc., complete
53Plastering with cement mortar 1:3 mixto 10mmthick including cost and conveyance of all materials to site and all labour charges etc
54Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc
55weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over RCC roof slab in the proportion of 32.12.5 and finished with one course of pressed mortar 1:3 mix and pointed with the same oiled mortar including cost and tiles ofsize 20 x20x2cm with cement conveyance of all materials to site and all labour charges etc complete
56Scratch proof ceramic tiles of size 305 x305 x6 including cost and conveyance of all materials to site and all labour charges etc complete
57Distempering two coats over priming coat including cost andconveyance of all materials to site and all labour charges etc complete
58Exterior Emulsion two coats over priming coat including cost and conveyance of all materials to site and all labour charges etc complete
59Painting two coats over old iron works using ready mixed enamel paint including cost and conveyance of materials and all labour charges etc complete
60Provision for Name board
61Construction of New toilet (Disabled friendly) to libarary building in Kuruchi panchayat
62Earthwork excavation and depositing on bank with initial lift of 2.00m in hard stiff clay, Stiff Black cotton soil, hard red earth, shales, Murram etc., as per SS 20 B
63Supplying and filling in basement with filling river sand in layer of not more than 15 cm thick well rammed etc., complete
64Cement concrete 1:4:8mix using 40mm gauge hand broken granite granite tone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete
65Brickwork in CM 1:5 using secondclass bricks of size 23 x11.5x 7.5 cm for the following including mixing mortar and all other labour charges etc complete
66RCC 1:1:5:3 using 20mm metalincluding cost and conveyance of all materials to siteand labour charges etc., complete
67Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC Column footing column plinth beam, beams , roof slabs , staircase steps , bed blocks, critical pier etc
68Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length , bending toand tying in position and forming grill for all RCC works
69Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc
70Plastering with cement mortar 1:3 mixto 10mmthick including cost and conveyance of all materials to site and all labour charges etc
71Paving the floor with scratch proof ceramic tile of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
72Dadooing of walls with glazed tiles of size 300mmx200mmx6mmcost and includingconveyance of all materials to site and all labour charges etc complete
73Oil bound Distember painting two coats with approved distember including cost and conveyance of all materials to and all labour charges etc complete
74Exterior Emulsion two coats over priming coat including cost and conveyance of all materials to site and all labour charges etc complete
75Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
76Supply offixing of RCC jolly 0.4x0.45 etc complete
77Supply & fixing in position of European type water closet 580 x 440 mm of approved quality including cost and conveyance of all materials to site etc complete
78Filling the soak pit with 40mm metal as per specification
79Filling the soak pit with 20mm metal as per specification
80Filling the soak pit with sand as per specification
81Supplying and fixing of RCC rings 900mm for leach pit etc complete
82Supplying and fixing of RCC coverslab 900mm for leach pit etc complete
83Part 3 Renovation of AGAMTlibararyBuilding and New Toilet at Seruvaviduthi southPanchayat
84Chipping of wall cracks including all labour charges etc., complete
85Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10sqn
86Plastering with cement mortar 1:3 mixto 10mmthick including cost and conveyance of all materials to site and all labour charges etc
87Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc
88Distempering two coats over priming coat including cost andconveyance of all materials to site and all labour charges etc complete
89Exterior Emulsion two coats over priming coat including cost and conveyance of all materials to site and all labour charges etc complete
90Painting two coats over old iron works using ready mixed enamel paint including cost and conveyance of materials and all labour charges etc complete
91Provision for Electification
92Light /fan point(SD 25)
93Ceiling fan (SD 110)
94Service wire (SD 65)7/20
95LED 4\"40W light
96plug point
97Repair to doors and windows
98Provision for Name board
99Providing platform in libarary building
100Earthwork excavation and depositing on bank with initial lift of 2.00m in hard stiff clay, Stiff Black cotton soil, hard red earth, shales, Murram etc., as per SS 20 B
101Supplying and filling in basement with filling river sand in layer of not more than 15 cm thick well rammed etc., complete
102Cement concrete 1:4:8mix using 40mm gauge hand broken granite granite tone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete
103Brickwork in CM 1:5 using secondclass bricks of size 23 x11.5x 7.5 cm for the following including mixing mortar and all other labour charges etc complete
104Providing granolithic flooring with CC 1:2:4, using 10-12mm chips ,25mm including cost and conveyance of all materials to site and alll labour charges for mixing , laying and curring etc complete
105Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc
106Construction of New toilet (Disabled friendly) to libarary building in Seruvaviduthisouth panchayat
107Earthwork excavation and depositing on bank with initial lift of 2.00m in hard stiff clay, Stiff Black cotton soil, hard red earth, shales, Murram etc., as per SS 20 B
108Supplying and filling in basement with filling river sand in layer of not more than 15 cm thick well rammed etc., complete
109Cement concrete 1:4:8mix using 40mm gauge hand broken granite granite tone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete
110Brickwork in CM 1:5 using secondclass bricks of size 23 x11.5x 7.5 cm for the following including mixing mortar and all other labour charges etc complete
111RCC 1:1:5:3 using 20mm metalincluding cost and conveyance of all materials to siteand labour charges etc., complete
112Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC Column footing column plinth beam, beams , roof slabs , staircase steps , bed blocks, critical pier etc
113Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length , bending toand tying in position and forming grill for all RCC works
114Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc
115Plastering with cement mortar 1:3 mixto 10mmthick including cost and conveyance of all materials to site and all labour charges etc
116Paving the floor with scratch proof ceramic tile of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
117Dadooing of walls with glazed tiles of size 300mmx200mmx6mmcost and includingconveyance of all materials to site and all labour charges etc complete
118Oil bound Distember painting two coats with approved distember including cost and conveyance of all materials to and all labour charges etc complete
119Exterior Emulsion two coats over priming coat including cost and conveyance of all materials to site and all labour charges etc complete
120Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
121Supply offixing of RCC jolly 0.4x0.45 etc complete
122Supply & fixing in position of European type water closet 580 x 440 mm of approved quality including cost and conveyance of all materials to site etc complete
123Filling the soak pit with 40mm metal as per specification
124Filling the soak pit with 20mm metal as per specification
125Filling the soak pit with sand as per specification
126Supplying and fixing of RCC rings 900mm for leach pit etc complete
127Supplying and fixing of RCC coverslab 900mm for leach pit etc complete
128Part 4 Renovation of AGAMTlibararyBuilding and NewToilet at Kalagam Panchayat
129Chipping of wall cracks including all labour charges etc., complete
130weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over RCC roof slab in the proportion of 32.12.5 and finished with one course of pressed mortar 1:3 mix and pointed with the same oiled mortar including cost and tiles ofsize 20 x20x2cm with cement conveyance of all materials to site and all labour charges etc complete
131Plastering with cement mortar 1:3 mixto 10mmthick including cost and conveyance of all materials to site and all labour charges etc
132Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc
133Distempering two coats over priming coat including cost andconveyance of all materials to site and all labour charges etc complete
134Exterior Emulsion two coats over priming coat including cost and conveyance of all materials to site and all labour charges etc complete
135Painting two coats over old iron works using ready mixed enamel paint including cost and conveyance of materials and all labour charges etc complete
136Provision for Electification
137Light / Fan Point (SD 23)
138Ceiling fan (SD 110)
139EB Metre board (SD 125)
140Service wire (SD 65)7/20
14125mm GI Pipe(SD 70)
142CFL (SD 80)
143Repair to doors and windows
144Provision for Name board
145Filter
146Drillig of borewells anywhere in tamilnadu including transportation from one place to anotherwith in tamilnadu in alluvial soil sedimentary strate of clay and sand stone shale pebbles boulders etc by first taking a pilot bore of 140mm/150mm dia and then enlarging to required dia direct or reverse rotary mud circulation method using rotary rigs, fuel, labour and drilling bentonite and water required for drillling at site
147Cost and supply of special blue slotted PVC pipe for borewell
148Cost and supply of PVC of End cap
149Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock required blasting but inclusive of shoring strutting and boiling out water whenever necessary etc complete complying with standard specification
150Supplying and filling in basement with filling river sand in layer of not more than 15 cm thick well rammed etc., complete
151Cement concrete 1:4:8mix using 40mm gauge hand broken granite granite tone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete
152Cement concrete 1:3:6mix using 20mm gauge hand broken granite granite tone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete
153Supplying and erecting centering for sides centering for soffits of RCC slabs of plane surface like lintels, beams etc below basement
154Filling the soak pit with 40mm metal as per specification
155Filling the soak pit with 20mm metal as per specification
156Construction of New toilet (Disabled friendly) to libarary building in Kalagam panchayat
157Earthwork excavation and depositing on bank with initial lift of 2.00m in hard stiff clay, Stiff Black cotton soil, hard red earth, shales, Murram etc., as per SS 20 B
158Supplying and filling in basement with filling river sand in layer of not more than 15 cm thick well rammed etc., complete
159Cement concrete 1:4:8mix using 40mm gauge hand broken granite granite tone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete
160Brickwork in CM 1:5 using secondclass bricks of size 23 x11.5x 7.5 cm for the following including mixing mortar and all other labour charges etc complete
161RCC 1:1:5:3 using 20mm metalincluding cost and conveyance of all materials to siteand labour charges etc., complete
162Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC Column footing column plinth beam, beams , roof slabs , staircase steps , bed blocks, critical pier etc
163Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length , bending toand tying in position and forming grill for all RCC works
164Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc
165Plastering with cement mortar 1:3 mixto 10mmthick including cost and conveyance of all materials to site and all labour charges etc
166Paving the floor with scratch proof ceramic tile of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
167Dadooing of walls with glazed tiles of size 300mmx200mmx6mmcost and includingconveyance of all materials to site and all labour charges etc complete
168Oil bound Distember painting two coats with approved distember including cost and conveyance of all materials to and all labour charges etc complete
169Exterior Emulsion two coats over priming coat including cost and conveyance of all materials to site and all labour charges etc complete
170Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
171Supply offixing of RCC jolly 0.4x0.45 etc complete
172Supply & fixing in position of European type water closet 580 x 440 mm of approved quality including cost and conveyance of all materials to site etc complete
173Filling the soak pit with 40mm metal as per specification
174Filling the soak pit with 20mm metal as per specification
175Filling the soak pit with sand as per specification
176Supplying and fixing of RCC rings 900mm for leach pit etc complete
177Supplying and fixing of RCC coverslab 900mm for leach pit etc complete
178Part 5 Renovation of AGAMTlibararyBuilding and New Toilet at Kalluranikkadu Panchayat
179Chipping of wall cracks including all labour charges etc., complete
180Scratch proof ceramic tiles of size 305 x305 x6 including cost and conveyance of all materials to site and all labour charges etc complete
181Plastering with cement mortar 1:3 mixto 10mmthick including cost and conveyance of all materials to site and all labour charges etc
182Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc
183weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over RCC roof slab in the proportion of 32.12.5 and finished with one course of pressed mortar 1:3 mix and pointed with the same oiled mortar including cost and tiles ofsize 20 x20x2cm with cement conveyance of all materials to site and all labour charges etc complete
184Distempering two coats over priming coat including cost andconveyance of all materials to site and all labour charges etc complete
185Exterior Emulsion two coats over priming coat including cost and conveyance of all materials to site and all labour charges etc complete
186Painting two coats over old iron works using ready mixed enamel paint including cost and conveyance of materials and all labour charges etc complete
187Provision for Electrification
188LightPoint (SD 25)
189LED 4\"40W Light
190Repair to doors and windows
191Provision for Name board
192Construction of New toilet (Disabled friendly) to libarary building in Kalluranikkadu panchayat
193Earthwork excavation and depositing on bank with initial lift of 2.00m in hard stiff clay, Stiff Black cotton soil, hard red earth, shales, Murram etc., as per SS 20 B
194Supplying and filling in basement with filling river sand in layer of not more than 15 cm thick well rammed etc., complete
195Cement concrete 1:4:8mix using 40mm gauge hand broken granite granite tone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete
196Brickwork in CM 1:5 using secondclass bricks of size 23 x11.5x 7.5 cm for the following including mixing mortar and all other labour charges etc complete
197RCC 1:1:5:3 using 20mm metalincluding cost and conveyance of all materials to siteand labour charges etc., complete
198Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC Column footing column plinth beam, beams , roof slabs , staircase steps , bed blocks, critical pier etc
199Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length , bending toand tying in position and forming grill for all RCC works
200Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc
201Plastering with cement mortar 1:3 mixto 10mmthick including cost and conveyance of all materials to site and all labour charges etc
202Paving the floor with scratch proof ceramic tile of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
203Dadooing of walls with glazed tiles of size 300mmx200mmx6mmcost and includingconveyance of all materials to site and all labour charges etc complete
204Oil bound Distember painting two coats with approved distember including cost and conveyance of all materials to and all labour charges etc complete
205Exterior Emulsion two coats over priming coat including cost and conveyance of all materials to site and all labour charges etc complete
206Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
207Supply offixing of RCC jolly 0.4x0.45 etc complete
208Supply & fixing in position of European type water closet 580 x 440 mm of approved quality including cost and conveyance of all materials to site etc complete
209Filling the soak pit with 40mm metal as per specification
210Filling the soak pit with 20mm metal as per specification
211Filling the soak pit with sand as per specification
212Supplying and fixing of RCC rings 900mm for leach pit etc complete
213Supplying and fixing of RCC coverslab 900mm for leach pit etc complete
214Part 6Renovation of AGAMTlibararyBuilding atValapiramankadu Panchayat
215Chipping of wall cracks including all labour charges etc., complete
216Providing granolithic flooring with CC 1:2:4, using 10-12mm chips ,25mm including cost and conveyance of all materials to site and alll labour charges for mixing , laying and curring etc complete
217Paving the floor with vetrified tiles CM 1:3 , 20mm thick including cost and conveyance of all materials to site and all labour charges etc complete
218scratch proof ceramic tile of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
219Dadooing of walls with glazed tiles of size 300mmx200mmx6mm CM 1:2,10mm thick and pointing with white cement using 0.4kg/cm2 -10sqm
220Plastering with cement mortar 1:3 mixto 10mmthick including cost and conveyance of all materials to site and all labour charges etc
221Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc
222Distempering two coats over priming coat including cost andconveyance of all materials to site and all labour charges etc complete
223Exterior Emulsion two coats over priming coat including cost and conveyance of all materials to site and all labour charges etc complete
224Painting two coats over old iron works using ready mixed enamel paint including cost and conveyance of materials and all labour charges etc complete
225Provision for Electification
226Fan Point (SD 25)
227LightPoint (SD 25)
228Ceiling fan (SD 110)
229Service wire (SD 65)7/20
230LED 4\"40W light
231Repair to doors and windows
232Provision for Name board
233Filter
234Drillig of borewells anywhere in tamilnadu including transportation from one place to anotherwith in tamilnadu in alluvial soil sedimentary strate of clay and sand stone shale pebbles boulders etc by first taking a pilot bore of 140mm/150mm dia and then enlarging to required dia direct or reverse rotary mud circulation method using rotary rigs, fuel, labour and drilling bentonite and water required for drillling at site
235Cost and supply of special blue slotted PVC pipe for borewell
236Cost and supply of PVC of End cap
237Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock required blasting but inclusive of shoring strutting and boiling out water whenever necessary etc complete complying with standard specification
238Supplying and filling in basement with filling river sand in layer of not more than 15 cm thick well rammed etc., complete
239Cement concrete 1:4:8mix using 40mm gauge hand broken granite granite tone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete
240Cement concrete 1:3:6mix using 20mm gauge hand broken granite granite tone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete
241Supplying and erecting centering for sides centering for soffits of RCC slabs of plane surface like lintels, beams etc below basement
242Filling the soak pit with 40mm metal as per specification
243Filling the soak pit with 20mm metal as per specification
244Part 7 Renovation of AGAMTlibararyBuilding and New Toilet at Sornakkadu Panchayat
245Chipping of wall cracks including all labour charges etc., complete
246Plastering with cement mortar 1:3 mixto 10mmthick including cost and conveyance of all materials to site and all labour charges etc
247Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc
248Distempering two coats over priming coat including cost andconveyance of all materials to site and all labour charges etc complete
249Exterior Emulsion two coats over priming coat including cost and conveyance of all materials to site and all labour charges etc complete
250Painting two coats over old iron works using ready mixed enamel paint including cost and conveyance of materials and all labour charges etc complete
251Provision for Electification
252Light / Fan Point (SD 23)
253Fan Point (SD 110)
254Ceiling fan (SD 110)
255Service wire (SD 65)7/20
256LED 4\"20W light
257Repair to doors and windows
258Doors
259windows
260Provision for Name board
261Provision for plinth protection platform
262Earthwork excavation and depositing on bank with initial lift of 2.00m in hard stiff clay, Stiff Black cotton soil, hard red earth, shales, Murram etc., as per SS 20 B
263Cement concrete 1:4:8mix using 40mm gauge hand broken granite granite tone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete
264Brickwork in CM 1:5 using secondclass bricks of size 23 x11.5x 7.5 cm for the following including mixing mortar and all other labour charges etc complete
265Providing granolithic flooring with CC 1:2:4, using 10-12mm chips ,25mm including cost and conveyance of all materials to site and alll labour charges for mixing , laying and curring etc complete
266Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc
267Construction of New toilet (Disabled friendly) to libarary building in sornakkadu panchayat
268Earthwork excavation and depositing on bank with initial lift of 2.00m in hard stiff clay, Stiff Black cotton soil, hard red earth, shales, Murram etc., as per SS 20 B
269Supplying and filling in basement with filling river sand in layer of not more than 15 cm thick well rammed etc., complete
270Cement concrete 1:4:8mix using 40mm gauge hand broken granite granite tone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete
271Brickwork in CM 1:5 using secondclass bricks of size 23 x11.5x 7.5 cm for the following including mixing mortar and all other labour charges etc complete
272RCC 1:1:5:3 using 20mm metalincluding cost and conveyance of all materials to siteand labour charges etc., complete
273Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC Column footing column plinth beam, beams , roof slabs , staircase steps , bed blocks, critical pier etc
274Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length , bending toand tying in position and forming grill for all RCC works
275Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc
276Plastering with cement mortar 1:3 mixto 10mmthick including cost and conveyance of all materials to site and all labour charges etc
277Paving the floor with scratch proof ceramic tile of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
278Dadooing of walls with glazed tiles of size 300mmx200mmx6mmcost and includingconveyance of all materials to site and all labour charges etc complete
279Oil bound Distember painting two coats with approved distember including cost and conveyance of all materials to and all labour charges etc complete
280Exterior Emulsion two coats over priming coat including cost and conveyance of all materials to site and all labour charges etc complete
281Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
282Supply offixing of RCC jolly 0.4x0.45 etc complete
283Supply & fixing in position of European type water closet 580 x 440 mm of approved quality including cost and conveyance of all materials to site etc complete
284Filling the soak pit with 40mm metal as per specification
285Filling the soak pit with 20mm metal as per specification
286Filling the soak pit with sand as per specification
287Supplying and fixing of RCC rings 900mm for leach pit etc complete
288Supplying and fixing of RCC coverslab 900mm for leach pit etc complete
289GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}

AI Tender Summary

OUR REF NO 35576682
AUTHORITY Local Bodies
TENDER VALUE 12.30 Lakhs
LAST DATE 12-01-2023
Authority
Authority Name Rural Development And Panchayats Department
Work Description Renovation Of Agamtlibararybuilding And New Toilet Atdevarkudiyiruppu In Alivalam Panchayatpart 2 Renovation Of Agamtlibararybuilding And New Toilet At Kuruchi Panchayat Part 3 Renovation Of Agamtlibararybuilding And New Toilet At Seruvaviduthi Southpanchayatpart 4 Renovation Of Agamtlibararybuilding And New Toilet Atkalagampanchayat Part 5 Renovation Of Agamtlibararybuilding And New Toilet Atkalluranikkadu Panchayatpart 6 Renovation Of Agamtlibararybuilding Atvalapiramankadu Panchayatpart 7 Renovation Of Agamtlibararybuilding And New Toilet Atsornakkadupanchayat
Basic Detail
Tender No RC No.8010 2022/B3 Dated.03.01.2023
Bidding Type Tender
Location
City peravurani
State Tamil Nadu
Key Dates
Publish Date 03 Jan 2023
Submission Date 12 Jan 2023
Open Date 13 Jan 2023
Finance
Tender Value 12.30 Lakhs
Tender Fee Ref. Documents
EMD 12300
Exemption Not Available
Document List
8ae051a4-8212-4c76-9873-ccf8ceb7640c.html
BOQ_330771.xls
Pricebit.pdf
Technicalbit.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jan 03, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Jan 12, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jan 13, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

8ae051a4-8212-4c76-9873-ccf8ceb7640c.html

xls

BOQ_330771.xls

pdf

Pricebit.pdf

pdf

Technicalbit.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders