| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge 1: 3: 6 or richer mix. |
| 2 | Repair to damaged RCC slabs, beams and columns etc for strengthening with cement mortar 1 : 2 in following steps :- Choping losse and cracked concrete to required depth, cleaning the exposed surface of steel and concrete with wire brush and sand papering , cleaning of concrete surface with water as necessary and getting dried. Applying Epoxy primer on the exposed steel bars. Applying Epoxy hardener and resin mix (as per manufectured\"s specification) on concrete and steel bars with brush. Speading dry cement mortar 1 : 2 mix over epoxy treated wet surface and allow it to dry for one day. Plastering the surface with cement sand mortar 1 : 3 upto depth of 30mm complete. Cure the plastered surface for 15 days, All work including scaffolding etc. complete in all respect. |
| 3 | Plaster on new surface on walls in cement sand mortar 1:4 including rackingofjointsetc. complete fine finish 20mm thick . |
| 4 | Half brick masonry in Superstructure , above plinth level upto floor Vlevelusing bricks of designation 75 Cement mortar 1 : 4 (1 cement : 4 coarse sand) |
| 5 | Supplying and fixing machine cut fine dressedRed/Pink sand stone dasa orcoping,with full moulding if required laid on cement mortar 1:4 including pointing with admixture of pigment matching with the stone shade. 25mm thick |
| 6 | Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2coarse sand : 4 stone aggregate 10mm and down gauge) includingfinishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design : |
| 7 | Kota stone slab flooring 25 mm thick over 20 mm (average) thickbase laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing completewith base of cement mortar 1 : 4 (1 cement : 4 coarse sand) For area of each slab from 901 to 2000 Sq.Cm : |
| 8 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meter lead. |
| 9 | Providing and laying APP (Atactic Polypropylene Polymer) modified prefabricated five layer 3mm thick water proofing membrane, black finished reinforced with non-woven polyester mattconsisting of a coat of bitumen primer for bitumen membran @ 0.40 Itr/sq.mt. by the same membrane manufacture of density at 25°C, 0.87-0.89 kg/ltr and viscosity 70-160 cps. Over the primer coat the layer of membrane shall be laid using Butane Torch and sealing all joints etc., and preparing the surface complete. The vital physical and chemical parameters of the membrane shall be as under Joint strength in longitudinal and transverse direction at 23°C as 650/450N/5cm. Tear strength in longitudinal and transverse direction as 300/250N. Softening point of membrane not less than 150°C. Cold flexibility shall be upto -2°C when tested in accordance with ASTM, D-5147. The laying of membrane shall be got done through the authorized applicator of the manufacturer of membrane .3 mm thick |
| 10 | Providing & laying broken glazed titles on roof ( broken glazed tilesnot less than 9 Kg/Sqm) on top of hot bitumen @ 1.7 Kg/Sqm. (1.40 Kg ofVG-40 (30/40 )grade and 0.30 Kg/Sqm. OfVG-10 (80/100) grade) and joints filled with cement mortar 1 :2 (1 cement:2 marble dust mixed with water proofing compund all complete as per direction of Engineer-in-charge. |
| 11 | Painting top of roofs with bitumen of approved quality at 17kg per 10 sqm impregnated with a coat of coarse sand at 60 cudm per 10sqm including cleaning the slab surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil complete: With residual type petroleum bitumen of penetration 80/100 |
| 12 | Grading roof for water proofing treatment withwater proffing compound Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 13 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. |
| 14 | Providing and laying in position specified grade ofcement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcementfor Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc.M20 grade Nominal Mix / Design Mix |
| 15 | Providing and applying white cement based puttyover plastered surface to prepare the surface even and smooth completeNew Plastered Surface (three or more coats) |
| 16 | Painting exterior surface ofWallwith 100% acrylic exterior paint of approved brand and manufacture to give an even shade with two or more coats including prepartion of base with sand papering, primer, putty,etc complete in all respect including scaffolding and safety provisionNew Work |
| 17 | Carriage of Building Rubbish Stone metal (Grit and ballast etc.) including loading, unloading complete with all lead. |