Tender For Construction Of Two Classroom Building At Pum School In Kaveripatty H/O Koneripatti In Work No.05 New School Building -2022-2023 At Salem District
Tender Value
27 Lakhs
Estimated cost
Bid Submission
12 Jan 2023
0 days left
EMD
27000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
sankari → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Construction Of Two Classroom Building At Pum School In Kaveripatty H / O Koneripatti In Work No.05 New School Building -2022-2023 At Salem District
BOQ
| Sl. No. | Item Description |
| 1 | 1.) Construction of Two Class room Building at KaveripattyP.U.M School H/O Koneripatti |
| 2 | Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement etc., |
| 3 | Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete |
| 4 | Refilling with excavated earthas per standard specifications etc complete |
| 5 | Brick work in cement Mortor 1:5 (One cement and five sand) using country Bricks of size 23 x 11.5 x 7.5 cms for the following including mixing mortar and all other labour charges etc complete. |
| 6 | Super structure |
| 7 | Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at about 90 cms center to center and supported causorina props of 10 cm to13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155) for column footing. (Footing) |
| 8 | Column and sunshade |
| 9 | Lintel and Roof |
| 10 | R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete |
| 11 | Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate.The binding wire shall be supplied by the Contractor. |
| 12 | Weathering course with brick jelly lime concrete in the proportion of 32:12.5 by volume including cost and conveyance of all and labour charges etc. complete. |
| 13 | Finishing the top of roof with one course of pressed tiles of size 20 X 20 X 2 mm laid in CM 1:3 12 mm thick mixes with W.P. compound laid 2 % weight of cement etc., complete. |
| 14 | Paving the floor with Paving the floor with kotta stone of size 610x610x 20mmin Cement mortar 1:3etc., complete complying with standard specifications and as directed by the departmental officers. |
| 15 | Paving the floor Anti skid tiles of any colour and any size laid in CM 1:3, 20mm thick. And pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complying with the sta |
| 16 | Supply of steel doors including cost and convyance and all charges etc complete.etc complete(1.20x2..40m) |
| 17 | Supply of steelwindows including cost and convyance and all charges etc complete.etc complete. (1.20x1.60m) |
| 18 | Plastering with C. M 1:5 mix, 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete. |
| 19 | Plastering with cement mortar 1:3 mixto 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete. |
| 20 | Painting two coats over new iron work using synthetic enamal paint including cost and conveyance of all materials to site etc complete |
| 21 | Oil Distempering Two Coats overPlastering Surface including cost and conveyance of materials and labour chargesetc complete |
| 22 | Painting two coats with approved Plastic Emulsion over one coat of Priming coat of Cement Paint over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B) ( NEW SURFACE) |
| 23 | Supply and fixing of Cuddapah slab of 20/30mm thick including cost and conveyance and all charges etc complete. |
| 24 | Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wallwith3 mm thick Hylum sheet cover withTW boxAnd 5 A FT switch with continuous earth connection of 14 SWG TC wire for making good ofthe concealed portion with suitable colour for PVC concealed Light point / fan point (For electronic Regulator) SD26 |
| 25 | Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutorof 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wallwith150 mm X 100 mm X 113 mm TW switch boxwith3 mm thick Hylum sheet cover for 5 A 3 pin non interlocking CS plugwith continuous earth wire connection of 14 SWG TC wire for making good ofthe concealed portion with suitable colour forconcealed PVCplugpointSD 38 |
| 26 | Supply and run of 2 of 4.00 sq.mm (22/0.30) PVC insulated SC unsheathed copper Conductor of1100 V grade on 7/20GI bearer wire for service connection mains SD 65 |
| 27 | Supply and run of 2 of4 Sqmm (56/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100 v grade in 25mm dia GI Pipe (Class\"B\") Suitably bent at both ends with necessary angle iron upright and end supports for maints (SD.70) |
| 28 | Supply and fixing ofWT bulk head fitting with guard ( Philips / Bajaj / Crompton / K Lite ) suitable for incandescent lamp with 60 W bulb.SD 83 |
| 29 | Supply and fixing of single box type 4\"-40Wflourescent tube fitting with copper choke and condenser with TWround block on wall or ceiling with flourescent tube with PVC unsheathedcopper leads from terminals to the fitting ofTube Light [SD88] |
| 30 | Supply and fixing of 1200 mm ( 48\") AC ceiling fan complete with stepped electronic 300 W regulator with 300 mmdown rod on the existing clamp. SD 106 |
| 31 | Supply and fixing of 8 way single pole and neutral MCB sheet steel enclosure distribution board with double door (metal) 1 No. 32A DP MCB as incoming and 6 Nos. 6A to 32A SPMCB outgoing in flush with wall and making good of the concealed portion with earth connection only. The MCB DB and MCB\"s should be with ISI mark (like standardmake) SD. No.167 |
| 32 | Supply and fixing of 16 Amps DPIC Switch of 500 V with fuse and neutral (Side Handle) on suitable TW box PWD EarthingSD 141 |
| 33 | Supply and fixing of TNEB meter Board suitable for 32A Three phase service connection with 32 A Fuse unit (500V) 32 A neutral link and earth ling (1\"x1/8\" Copper flat) on TW plank of size 600mm x 450mm x 19mm with supporting TW reepers of 1\" thick an either side with painting with suitable bolt and nuts for fixing the TW plank on wall with earth connection and inter connection with 7/20 PVC insulated copper wire from EBV Meter to fues unit(SD.127) |
| 34 | Provisions for drawing Bala painting including all cost and conveyance of men and materials etc.,(the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer |
| 35 | Provisions forCubboardarrangements for(Students) No:1 |
| 36 | Brick Workin CM 1:5 mix using II Class Bricksincluding cost and conveyance of materials and labour chargesetc complete. - 100.00 Cft |
| 37 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc |
| 38 | Supplying & fixingwith cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm |
| 39 | Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers |
| 40 | Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124) |
| 41 | Provisions for Lock & Key arrangements |
| 42 | Provisions forCubboardarrangements for(Students) No:2 |
| 43 | Brick Workin CM 1:5 mix using II Class Bricksincluding cost and conveyance of materials and labour chargesetc complete. - 100.00 Cft |
| 44 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc |
| 45 | Supplying & fixingwith cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm |
| 46 | Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers |
| 47 | Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124) |
| 48 | Provisions for Lock & Key arrangements |
| 49 | Provisions forCubboardarrangements for(Teachers) No:1 |
| 50 | Brick Workin CM 1:5 mix using II Class Bricksincluding cost and conveyance of materials and labour chargesetc complete. - 100.00 Cft |
| 51 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc |
| 52 | Supplying & fixingwith cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm |
| 53 | Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers |
| 54 | Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124) |
| 55 | Provisions for Lock & Key arrangements |
| 56 | Provisions forCubboardarrangements for(Teachers) No:2 |
| 57 | Brick Workin CM 1:5 mix using II Class Bricksincluding cost and conveyance of materials and labour chargesetc complete. - 100.00 Cft |
| 58 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc |
| 59 | Supplying & fixingwith cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm |
| 60 | Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers |
| 61 | Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124) |
| 62 | Provisions for Lock & Key arrangements |
| 63 | Provisions forLunch Cupboard |
| 64 | Provisions forMagneticGreen Fibre Board |
| 65 | Provisions forDisplay Notice board |
| 66 | Provisions forChappal rack ( As per sub estimate) No:1 |
| 67 | Brick Workin CM 1:5 mix using II Class Bricksincluding cost and conveyance of materials and labour chargesetc complete. - 100.00 Cft |
| 68 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc |
| 69 | Supplying & fixingwith cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm |
| 70 | Exterior Emulsion two coats to the outside of the Building using best approved best quality ofCcement Paint including cost of Cement Paint,brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for Out side of the Building (New Wall) |
| 71 | Provisions forChappal rack ( As per sub estimate) No:2 |
| 72 | Brick Workin CM 1:5 mix using II Class Bricksincluding cost and conveyance of materials and labour chargesetc complete. - 100.00 Cft |
| 73 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc |
| 74 | Supplying & fixingwith cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm |
| 75 | Exterior Emulsion two coats to the outside of the Building using best approved best quality ofCcement Paint including cost of Cement Paint,brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for Out side of the Building (New Wall) |
| 76 | Provisions forPedestal for water tank No:1 |
| 77 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundationincluding dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification |
| 78 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. |
| 79 | Cost and Supply ofSand filling from approved quarry including cost and conveyance of all material etc completed |
| 80 | Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 81 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 82 | Provisions forPedestal for water tankNo:2 |
| 83 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundationincluding dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification |
| 84 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. |
| 85 | Cost and Supply ofSand filling from approved quarry including cost and conveyance of all material etc completed |
| 86 | Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 87 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 88 | Provisions forStainless steel handrail |
| 89 | Provisions forRain water harvesting structure |
| 90 | Earth work Excavation for Foundation in all soils and Sub Soilas per SS20B for foundation etc. complete.SS 20B |
| 91 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum. |
| 92 | Brick Workin CM 1:5 mix using II Class Bricksincluding cost and conveyance of materials and labour chargesetc complete. - 100.00 Cft |
| 93 | Cost and Supply ofSand filling from approved quarry including cost and conveyance of all material etc completed |
| 94 | Cost and Supply of40mm HBG Metal from approved quarry including cost and conveyance of all material etc completed |
| 95 | Cost and Supply of20mm HBG Metal from approved quarry including cost and conveyance of all material etc completed |
| 96 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc |
| 97 | Exterior Emulsion two coats to the outside of the Building using best approved best quality ofCcement Paint including cost of Cement Paint,brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for Out side of the Building (New Wall) |
| 98 | Supplying and fixingP.V.C rainwater down fall pipe of 110mm diawith necessary shoes, bends,& clamps etc., |
| 99 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
AI Tender Summary
Tender Timeline
Jan 03, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedJan 12, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJan 12, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender