|
| 1 | Inviting rates forsupplying of repairing and construction material/equipmentas given in the list |
| 2 | Boulder with spreading 0.75 to 20 C.M. |
| 3 | Fata with spreading Rubble Stone |
| 4 | Stone- Black / RedStone Masonary |
| 5 | steel bars 6,8,10,12,16mm dia hysd bars (as per isi specification) |
| 6 | Soft Murrom with spreading |
| 7 | Hard Murrom with spreading |
| 8 | Bajra with spreading |
| 9 | Course Sand as per specification |
| 10 | Fine SandShahgad sand |
| 11 | Crusher Stone Dust with spreading |
| 12 | 06 MM MetalB.B. Metal |
| 13 | 12 MM MetalB.B. Metal |
| 14 | 20 MM MetalB.B. Metal |
| 15 | 40 MM MetalB.B. Metal |
| 16 | 90 MM MetalB.B. Metal |
| 17 | CRM( mix in plant ) for 45 mm max size |
| 18 | CRM( mix in plant ) for 53 mm max size |
| 19 | Red sand stone (Flag Stone)fine dressed with rough backing 70 mm thick |
| 20 | Red sand stone (Flag Stone) fine dressed with rough backing 60 mm thick |
| 21 | Red sand stone (Flag Stone)fine dressed with rough backing 50 mm thick |
| 22 | Red sand stone (Flag Stone)fine dressed with rough backing 40 mm thick |
| 23 | Red sand stone (Flag Stone) fine dressed with rough backing 300mm thick |
| 24 | Flag Stone 150 MM to 200 MM Dasa |
| 25 | Kota Stone, Green & Black1\"\" to 1 1/4\"\" |
| 26 | Bricks (Gitta)8\"\" x 4\"\" x 4\"\"open bhatta |
| 27 | Bricks (local)9\"\" x 4\"\" x 3\"\"open bhatta |
| 28 | Lime Dust |
| 29 | LimeDingla |
| 30 | Yellow SoilPirotha |
| 31 | Red SoilGeyuri |
| 32 | Half Round R.C.C. Pipe150MM DiaN.P.-2 with laying complete |
| 33 | Half Round R.C.C. Pipe250 MM DiaN.P.-2 with laying complete |
| 34 | Half Round R.C.C. Pipe300 MM DiaN.P.-2 with laying complete |
| 35 | Half Round R.C.C. Pipe450 MM DiaN.P.-2 with laying complete |
| 36 | providing and placing in position R.C.C. hume Pipe200 MM DiaN.P.-2 |
| 37 | providing and placing in position R.C.C. hume Pipe300 MM DiaN.P.-2 |
| 38 | providing and placing in position R.C.C. hume Pipe450 MM DiaN.P.-2 |
| 39 | providing and placing in position R.C.C. hume Pipe600 MM DiaN.P.-2 |
| 40 | providing and placing in position R.C.C. hume Pipe1000 MM DiaN.P.-2 |
| 41 | providing and placing in position R.c.c. Hume Pipe N.P.3300 MM DiaN.P.-3 |
| 42 | providing and placing in position R.c.c. Hume Pipe N.P.3 450 MM DiaN.P.-3 |
| 43 | providing and placing in position R.c.c. Hume Pipe N.P.3 600 MM DiaN.P.-3 |
| 44 | providing and placing in position R.c.c. Hume Pipe N.P.3 1000 MM DiaN.P.-3 |
| 45 | R.c.c. Hume Pipe N.P.31200 MM DiaN.P.-3 with laying complete |
| 46 | providing and placing in position R.c.c. Hume Pipe N.P.4300 MM DiaN.P.-4 |
| 47 | providing and placing in position R.c.c. Hume Pipe N.P.4 450 MM DiaN.P.-4 |
| 48 | providing and placing in position R.c.c. Hume Pipe N.P.4600 MM DiaN.P.-4 |
| 49 | providing and placing in position R.c.c. Hume Pipe N.P.4 1000 MM DiaN.P.-4 |
| 50 | R.c.c. Hume Pipe 1200 MM DiaN.P.-4 with laying complete |
| 51 | R.C.C. Cement Pole2.20 M-H2.20 M-H |
| 52 | R.C.C. Cement Pole2.40 M-H2.40 M-H |
| 53 | Barbed wire Steel9.38 K.g. per 100R. M. |
| 54 | Wire Mesh (Steel)50x50 mm strengthing 4mm with nut bolt baser |
| 55 | Angle Iron All size Mild steel |
| 56 | Winding wirewire |
| 57 | Welding GasLabour Complete with accessories |
| 58 | Welding ElectricLabour Complete with accessories |
| 59 | Steel I sections All sizeI.S.I. mark |
| 60 | Steel Door & windows with all fittingsAngel Iron 30x30x5 mm Flat iron 25x5 mm sheet 18 gauge |
| 61 | Collapsible shutter with All fitting (steel) |
| 62 | Iron chamber/drain grill (complete with Labour and fixing) |
| 63 | Corrogated G.I. sheet0.63 MM |
| 64 | Corrogated G.I. sheet0.80 MM |
| 65 | Distemper AsianInterior I.S.I. |
| 66 | Emulson Asian companyInterior I.S.I. |
| 67 | Oil paints Asian Tractor All ColourI.S.I. marka |
| 68 | Brushes1\"\" 1\"\" I.S.I |
| 69 | Brushes2\"\"2\"\" I.S.I |
| 70 | Brushes3\"\"3\"\" I.S.I |
| 71 | Brushes4\"\"4\"\" I.S.I |
| 72 | Brushes5\"\"5\"\" I.S.I |
| 73 | Cement p.p.c. ISI markISI mark each bag of 50 kg |
| 74 | Cement o.p.c. ISI markISI mark each bag of 50 kg |
| 75 | Centring shutering with fitting and cartling Below Plinth Level |
| 76 | centring/shutring with fitting & cartingAbove Plinth Level |
| 77 | Lime washing Labour |
| 78 | Distemper washingLabour |
| 79 | Emulsion wasingLabour |
| 80 | Oil paints PaintingLabour |
| 81 | Putty double coat with finishingLabour |
| 82 | steel bindingLabour |
| 83 | Transportation of malma with loading & unloading0 to 1 km |
| 84 | Transportation of malma with loading & unloading1 to 2.5 km |
| 85 | Transportation of malma with loading & unloading2.5 to 5.00 km |
| 86 | Tiles all size I.S.I. |
| 87 | Vetrified Tiles60 x 60 cm 10mm thik 15:15622 |
| 88 | Glazed tiles300 x 300 MM 10 MM thik 15:15622 |
| 89 | Tiles Fitting Labour |
| 90 | W.C. 580 x 440 mm with footrest & P-Trap with fittingOdisa petarn |
| 91 | W.C. European Type with fittingISI marked white solid plastic seat and lidEuropean Type |
| 92 | W.C. European Type with fittingISI marked black solid plastic seat and lidEuropean Type |
| 93 | Chequr tiles with fitting18 to 20mm thick ordinary cement |
| 94 | Polished Red Stone 25mm thick |
| 95 | Steel chamber cover including all fitting & labour Mild steel |
| 96 | Steel frame including all fitting & labour M.S. Tube |
| 97 | Steel frame including all fitting & labour M.S. Angle |
| 98 | cement concrete work with requiredequipment as per specification |
| 99 | Mistri (Mason) |
| 100 | Labour |
| 101 | Pokhlene Machine |
| 102 | JCB machine |
| 103 | MUD PUMP |
| 104 | PROFILE SHEET |
| 105 | PVC Pipe 1\" |
| 106 | PVC Pipe 2\" |
| 107 | PVC Pipe 3\" |
| 108 | PVC Pipe 4\" |
| 109 | PVC Pipe 0.75\" |
| 110 | GI PIPE 1\" |
| 111 | GI PIPE 2\" |
| 112 | GI PIPE 3\" |
| 113 | GI PIPE 4\" |
| 114 | GI PIPE 0.75\" |
| 115 | Bib Cock PVC |
| 116 | Bib Cock |
| 117 | PLASTER LABOUR |
| 118 | BRICK MASONARY WORK LABOUR |
| 119 | STONE MASONARY LABOUR PER MM |
| 120 | KERB |
| 121 | WATER PALM TREE 10 feet |
| 122 | WATER PALM TREE 5 feet |
| 123 | WATER TANK |
| 124 | ALLUMINIUM WORK |
| 125 | PVC SHEET WORK |
| 126 | STEEL FE 500 |
| 127 | FLAX WITH FRAME |
| 128 | FLAX WITHOUT FRAME |
| 129 | EXCAVATON |
| 130 | KEEL |
| 131 | RASSI 40 mm |
| 132 | RASSI 20 mm |
| 133 | RASSI 10 mm |
| 134 | slab casting with centring suttering & binding steel with labor charge |
| 135 | LABOUR CHARGES M-10 |
| 136 | GRENITE CHARGE |
| 137 | GRENITE fitting LABOUR |
| 138 | PINK MARBLE |
| 139 | PINK MARBLE FITTING LABOUR |
| 140 | PLUMBER |
| 141 | MASON |
| 142 | UNSKILLEED |
| 143 | FALSE CEELING |
| 144 | FALSE CEELING PLY-WOOD |
| 145 | NORMAL PLY-WOOD 6 mm |
| 146 | NORMAL PLY-WOOD 10 mm |
| 147 | NORMAL PLY-WOOD 20 mm |
| 148 | CONSTRUCTION WORK MIXTURE with Disel |
| 149 | SUPPPLY OF BLACK SOIL |
| 150 | EXCAVATON hard rock |
| 151 | ACP SHEET WORK |