| 1 | Withdrawal & lowering of KSB 38 KW submersible pump motor set installed in semi underground reservoir at WT-10 pumping station including own arrangement of all required special type tools & tackles etc. with transportation charges from pumping station to work shop and after repairing transportation from work shop to pump house as per direction of EIC. |
| 2 | Taking out the pump from motor and worn out the pump part by part for repairing & replacing the old damaged spares including necessary machining works as special type leath machining with setting of Ring, bearing housing etc. |
| 3 | Dismantling the shrink fitted motor from the motor housing assembly by heating and subsequent cooling process and varnishing, cleaning then heating arrangement of existing core and fitting-fixing the same inproper position including all labour charges & other instrument. |
| 4 | Carriage for KSB pump motor set (38 KW) with required special type tools & tackles, necessary labour charges as per direction of EIC. |
| 5 | Supply and fixing of the following materials, spare as per sample:-a) SKF Ball Bearing designation 6316-2RS1. |
| 6 | b) SKF Cylindrical Roller Bearing designation NU-211 ECJ. |
| 7 | c) Bearing Sleeve, Washer. |
| 8 | d) ‘O’ Ring and gasket Set. |
| 9 | e) Circlip set for Bore |
| 10 | f) Circlip set for shaft |
| 11 | g) Oil Seal |
| 12 | h)Moisture Sensor |
| 13 | i)Cable Retainer set |
| 14 | j)Making Tape |
| 15 | k)Lubricating Oil (SAE – 20 W/40) |
| 16 | l)Upper Mechanical Seal |
| 17 | m) Lower Mechanical Seal |
| 18 | n) Thermostat PTC |
| 19 | Repairing of shaft & Housing, hard chrome, lathejob etc. |
| 20 | Refitting the same after replacing the damage spares and other repairing works in original condition as per direction of EIC. |
| 21 | Re – working of cable Gland. |
| 22 | Labour charges for repairing of control panel with requisite spares including dismantling of panel from pump house carrying charge from pump house to workshop, reinstallation, testing, commissioning complete. |
| 23 | Repairing of control panel of WT – 10 pump house by supplying of the following materials, spares as per sample including less for unserviceable materials. a) Power contractor 85 Amp. of Siemens make type 3TF4922-0A-ZA01. |
| 24 | b) MPCB rated current 100 Amp. Siemens make type 3RV2041-4MA10. |
| 25 | c) Indicating Lamp of Red (3SB5201-6BC00), Green (3SB5201-6BE00), Yellow (3SB5201-6BD00) colour. |
| 26 | d) Sicop main contact kits for 3 TF 46 contractor 70 AMP ( set of 6 fixed & 3 moving contacts. Siemens make) |
| 27 | e). Single phasing preventer cum over load unit MPR D2 240 VA. C ( Minilac make) |
| 28 | f). Supply, delivery, fitting-fixing ofphase failure & overload protecting relay type MPR-D2, Minilac make. |
| 29 | g). Supply, fitting & fixing of current sensor’s Din-Rail mounted, type CTS-40A of Minilac make. |
| 30 | h). Supply, fitting & fixing of Power connector. |
| 31 | Dismantling & worn out the non – clock submersible pipe line than lifting the KSB pump motor set, for testing & checking the burn motor & lowering the non – clock submersible pump motor set, at under ground water reservoir, for emergency water supply including necessary testing, flange short pice pipe & bend etc. including packing bolt, nut, washer with all labour charges & all required tools & tackles etc. at WT: 10 pumping station. |
| 32 | Supply and fitting fixing of 100 Amps. Main switch 415 N/100 Amps. In iron angle frame at WT-1. |