Tender For Rejuvenation Of Water Bodies Project (Rejuvenation Of Podumoni Pond) At Bihpuria Under Atal Mission For Rejuvenation And Urban Transformation (Amrut) 2.0
Tender Value
58.23 Lakhs
Estimated cost
Bid Submission
13 Jan 2023
0 days left
EMD
1.16 Lakhs
Bank guarantee accepted
Document Fee
1200
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
bihpuria → Assam
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Rejuvenation Of Water Bodies Project ( Rejuvenation Of Podumoni Pond ) At Bihpuria Under Atal Mission For Rejuvenation And Urban Transformation ( Amrut ) 2.0
BOQ
| Sl. No. | Item Description |
| 1 | Renovation Pond |
| 2 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.Marshy soil |
| 3 | Providing and Laying bolder apron laid in wire creates with 4mm dia GI wire conforming to IS:4826 in 100mmx100mm mesh (woven diagonally) including 10% extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications clause 1301 |
| 4 | Providing and laying filoter media underneath pitching in slopes complete as per drawing and technical specification clause 1302 |
| 5 | Providing and laying pitching in slopes laid over prepared filter media as per drawing and technical specifications clause 1302 |
| 6 | Earth work in Excavation |
| 7 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width aswell as 10 sqm on plan) including getting out and disposal of excavatedearth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.2.6.1 All kinds of soil |
| 8 | Excavating, supplying and filling of local earth (including royalty) bymechanical transport upto a lead of 5km also including ramming andwatering of the earth in layers not exceeding 20 cm in trenches, plinth,sides of foundation etc. complete. |
| 9 | Construction of side drain |
| 10 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width aswell as 10 sqm on plan) including getting out and disposal of excavatedearth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.2.6.1 All kinds of soil |
| 11 | Dry brick on edge flooring in required pattern with bricks of classdesignation 7.5 on a bed of 12 mm mud mortar, including filling jointswith Jamuna sand, with common burnt clay non modular bricks. |
| 12 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinthlevel :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from naturalsources : 6 graded stone aggregate 20 mm nominal sizederived from natural sources) |
| 13 | Brick work 7 cm thick with common burnt clay F.P.S. (non modular)brick of class designation 7.5 in cement mortar 1:3 (1 cement : 3coarse sand) in superstructure above plinth level and upto floor fivelevel. |
| 14 | 15 mm cement plaster 1:3 (1 cement: 3 coarse sand) finished with afloating coat of neat cement on the rough side of single or half brickwall. |
| 15 | Providing and laying in position specified grade of reinforced cementconcrete, excluding the cost of centering, shuttering, finishing andreinforcement - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from naturalsources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 16 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 17 | Renovation of Community Hall |
| 18 | 52 mm thick cement concrete flooring with concrete hardener topping,under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarsesand : 4 graded stone aggregate 20 mm nominal size) and top layer 12mm thick cement hardener consisting of mix 1:2 (1 cement hardenermix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufacturer\"s specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete. |
| 19 | Providing and fixing precoated galvanised iron profile sheets (size,shape and pitch of corrugation as approved by Engineer-in-charge)0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 micronsepoxy primer on both side of the sheet and polyester top coat 15-18microns. Sheet should have protective guard film of 25 micronsminimum to avoid scratches during transportation and should besupplied in single length upto 12 metre or as desired by Engineerin-charge. The sheet shall be fixed using self drilling /self tappingscrews of size (5.5x 55 mm) with EPDM seal, complete upto anypitch in horizontal/ vertical or curved surfaces, excluding the cost ofpurlins, rafters and trusses and including cutting to size and shapewherever required. |
| 20 | Extra for circular cutting in C.G.S. sheet roofing for making openingof area exceeding 40 sq. decimeter:0.80 mm thick |
| 21 | Brick work 7 cm thick with common burnt clay F.P.S. (non modular)brick of class designation 7.5 in cement mortar 1:3 (1 cement : 3coarse sand) in superstructure above plinth level and upto floor fivelevel. |
| 22 | 15 mm cement plaster on rough side of single or half brick wall ofmix:1:4 (1 cement: 4 coarse sand) |
| 23 | Distempering with oil bound washable distemper of approved brandand manufacture to give an even shade :13.41.1 New work (two or more coats) over and including waterthinnable priming coat with cement primer |
| 24 | Finishing with Deluxe Multi surface paint system for interiors andexteriors using Primer as per manufacturers specifications :13.48.1 Two or more coats applied on walls @ 1.25 ltr/10 sqmover and including one coat of Special primer applied @0.75 ltr /10 sqm |
| 25 | Boundary wall |
| 26 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width aswell as 10 sqm on plan) including getting out and disposal of excavatedearth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.2.6.1 All kinds of soil |
| 27 | Dry brick on edge flooring in required pattern with bricks of classdesignation 7.5 on a bed of 12 mm mud mortar, including filling jointswith Jamuna sand, with common burnt clay non modular bricks. |
| 28 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinthlevel :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from naturalsources : 6 graded stone aggregate 20 mm nominal sizederived from natural sources) |
| 29 | Providing and laying in position specified grade of reinforced cementconcrete, excluding the cost of centering, shuttering, finishing andreinforcement - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from naturalsources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 30 | Reinforced cement concrete work in walls (any thickness), includingattached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from naturalsources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources) |
| 31 | Centering and shuttering including strutting, propping etc. and removalof form for5.9.1 Foundations, footings, bases of columns, etc. for massconcrete |
| 32 | Centering and shuttering including strutting, propping etc. and removalof form forColumns, Pillars, Piers, Abutments, Posts and Struts |
| 33 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. Kg |
| 34 | Brick work 7 cm thick with common burnt clay F.P.S. (non modular)brick of class designation 7.5 in cement mortar 1:3 (1 cement : 3coarse sand) in superstructure above plinth level and upto floor fivelevel. |
| 35 | 15 mm cement plaster on rough side of single or half brick wall ofmix:13.5.1 1:4 (1 cement: 4 coarse sand) |
| 36 | Distempering with oil bound washable distemper of approved brandand manufacture to give an even shade :13.41.1 New work (two or more coats) over and including waterthinnable priming coat with cement primer |
| 37 | Finishing with Deluxe Multi surface paint system for interiors andexteriors using Primer as per manufacturers specifications :13.48.1 Two or more coats applied on walls @ 1.25 ltr/10 sqmover and including one coat of Special primer applied @0.75 ltr /10 sqm |
| 38 | Steel work welded in built up sections/ framed work, including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets,gates and similar works |
| 39 | Construction of granular sub-base by providing close graded Materialconforming to specifications, mixing in a mechanical mix plant atOMC, carriage of mixed material by tippers to work site, for all leads& lifts, spreading in uniform layers of specified thickness with motorgrader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications anddirections of Engineer-in-Charge.With material conforming to Grade-III (size range 26.5 mmto 0.075 mm ) having CBR Value-20 |
| 40 | Providing, laying, spreading and compacting graded stone aggregate(size range 53 mm to 0.075 mm ) to wet mix macadam (WMM)specification including premixing the material with water at OMC infor all leads & lifts, laying in uniform layers with mechanicalpaverfinisher in sub- base / base course on well prepared surfaceand compacting with vibratory roller of 8 to 10 tonne capacity toachievethe desired density, complete as per specifications anddirections of Engineer-in-Charge. |
| 41 | Providing and laying factory made chamfered edge Cement Concretepaver blocks in footpath, parks, lawns, drive ways or light trafficparking etc, of required strength, thickness & size/ shape, made bytable vibratory method using PU mould, laid in required colour &pattern over 50mm thick compacted bed of sand, compacting andproper embedding/laying of inter locking paver blocks into the sandbedding layer through vibratory compaction by using plate vibrator,filling the joints with sand and cutting of paver blocks as per requiredsize and pattern, finishing and sweeping extra sand. complete all asper direction of Engineer-in-Charge. |
| 42 | Supplying, installation, testing and commissioning of the solar street light 20 watt LED luminaries complete with all accessories as required complete with necessary support with 2.5sqmm PVC insulated S.C copper conductor as required and as directed by the department.a.SPJ Solar Light 20 watt LED Luminaries for flood light |
| 43 | Supplying and installation, garden bench with capacity 3 seater as required and as directed by the department |
| 44 | Supplying and installation, garden swing with seat without roof 2 seater as required and as directed by the department |
| 45 | Providing and displaying of Areca Plam having ht.2.40m to 2.70m with 12 to 14 suckers well developed, fresh and healthy with lush green foliage in 35 cm size of Bucket type cement pols & as per direction of the officer in charge. |
| 46 | O & M (Cleaning, Water purification by chemical means, gardening for 1 year) |
AI Tender Summary
Tender Timeline
Dec 31, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedJan 13, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJan 16, 2023
Bid Opening Date
Technical bids will be opened and evaluated.