| 1 | 150mm diameter DTH drilling work. Work related with 150mm diameter of borewell by DTH drilling 1) Drilling works (with transportation charges ) (soil / Murum strata burden 200/215 mm diatmeter drilling work in hard rock for 150 diameter drilling work. |
| 2 | After complition of borewell drilling work, by air flushing lift method taking yield test by using 90 degree V notch. |
| 3 | 115mm diameter DTH drilling work. Drilling works (with transportation charges ) (Soil / Murum strata burden 150mm diameter rimming drilling work in hard rock for115mm diameter drilling (wet drilling) work including all. |
| 4 | After complition of borewell drilling work, by air flushing lift method taking yield test by using 90 degree V notch. |
| 5 | Metal Casing Pipe rate. For 150mm diameter of borewell using 150mm diameter Threaded iron casing pipe ERW medium class (IS 1239 ) 4.8mm thick with socket . |
| 6 | For 150mm diameter of borewell using 150mm diameter Threaded iron casing pipe ERW medium class (IS 1239 ) 4.8mm thick with casing lowering, |
| 7 | For 150mm diameter threaded iron casing pipe Cap. |
| 8 | For 150mm diameter of borewell using 150mm diameter without Threaded iron casing pipe ERW medium class ( IS 1239 ) 4.8mm thick. |
| 9 | For 150mm diameter of borewell using 150mm diameter without Threaded iron casing pipe ERW medium class( IS 1239 ) 4.8mm thick with casing lowering, & welding. |
| 10 | For 150mm diameter of borewell using 150mm diameter Threaded iron casing pipe ERW medium class(perfolated) (IS 1239 ) 4.8mm thick with casing lowering, socket & welding as per casing policy. |
| 11 | For 125mm diameter of borewellThreaded iron casing pipe ERW medium class (IS 1239 ) 4.8mm thick withsocket. |
| 12 | For 125mm diameter of borewellThreaded iron casing pipe ERW medium class (IS 1239 ) 4.8mm thick with casing lowering& grouting . |
| 13 | For 125mm diameter threaded iron casing pipe Cap (IS:1239 ) |
| 14 | P.V.C. Casing Pipe rate. 180mm diameter PVC casing pipe (6 kg/cm square ) (IS:4985-1988 ). |
| 15 | 180mm diameter PVC casing pipe (8 kg/cm square ) (IS:4985-1988 ). |
| 16 | 180mm diameter PVC casing pipe (6 kg/cmsquare & 8 kg/cm squar ) (IS:4985-1988 ) with lowering , handling & grouting.(Upto 12 meter) |
| 17 | 180mm diameter PVC casing pipe (6 kg/cmsquare & 8 kg/cm squar ) (IS:4985-1988 ) with lowering , handling & grouting.(Above 12 meter) |
| 18 | For 180mm diameter PVC casing pipe Cap. |
| 19 | For 115mm diameter of borewell using 140mm diameter PVC casing pipe (4 Kg /cm square)As per IS:4985 - 1988. |
| 20 | For 115mm diameter of borewell using 140mm diameter PVC casing pipe (4 Kg /cm square)(with lowring & grouting.) |
| 21 | For 115mm diameter of borewell using 140mm diameter PVC casing pipe (6 Kg /cm square)As per IS:4985 - 1988. |
| 22 | For 115mm diameter of borewell using 140mm diameter PVC casing pipe (6 Kg /cm square)(with lowring & grouting.) |
| 23 | For 115mm diameter Borewell 140mm diameter PVCcasing pipe Cap. |
| 24 | Installation of Handpump and construction of platform work. Installation of India Mark-II /India mark -III / extra deep well / VLOM 50 pump with rising pipe and connecting rod lowering in the borewell. |
| 25 | Excavation of platform by actual measurement |
| 26 | Dry rubble stone filling by actual measurement. |
| 27 | 1:2:4 (M150) cement concret by actual measurement. |
| 28 | Transport (Max.40 KM ) per Handpump installation and platform construction |
| 29 | Providing and Installation ofName board (PWD DSR 2022-23 Sr.No.300 P.No.76) |
| 30 | Yield Testing of Borewell with Generator. Yield Testing of Borewell with Generator |
| 31 | Removing and Installation of handpump at the time of borewell Yield testing, hydrofacturing, Flushing, borewell repairs |
| 32 | 150 / 115 mm diameter Borewell Regenerating / Flushing / Redriling including transportation. 150 / 115 mm diameter Borewell Regenerating / Flushing / Redriling including transportation (Per Borewell ) |