Tender For Construction Of Outgoing Feeder ,Seperate Phase For Street Light , Maintaining Proper Ground Clearance
Tender Overview
Project Description
Tender For Construction Of Outgoing Feeder , Seperate Phase For Street Light , Maintaining Proper Ground Clearance- 1 Supply Of P.P & Clamp For Sp-55With N / B. 2 Supply Of Stay Clamp For Sp-55With N&B Single Ended 3 Supply Of Stay Clamp For Sp-55With N&B Doubleended 4 Supply Of Bracing Top Clamp For Sp-55 With N / B 5 Supply Of Bracing Bottom Clamp For Sp-55 With N / B 6 Supply Of Earth Clamp For Sp-55 With N / B 7 Supply Of E-Braket Clamp 11 Kv 8 Supply Of Al Lug Dowel Make 240 Mm 9 Supply Of Al Lug Dowel Make 240 Mm 10 Supply Of 11 Kv Tpmo Jaw -Blade 11 Cartage Of Material By Private Truck From Store Centrehaldwani / Almora To Dump Store Including Loading-Unloading ( Avg. Distance 100Km. ) ( A ) Stp Sp-55Pole 12 Cartage Of Material By Private Truck From Store Centrehaldwani / Almora To Dump Store Including Loading-Unloading ( Avg. Distance 100Km. ) ( B ) Cartageof Small Material 13 Head Load Cartage Of Following Materials From Dump Store To Work Site ( Avg. Distance0.4. ) ( A ) Stp Sp-55 Pole 14 Head Load Cartage Of Following Materials From Dump Store To Work Site ( Avg. Distance0.4. ) ( B ) Cartageof Small Material 15 Febrication Oftop Channel / Bracing Angle As Per Specification 16 Dismantaling Of Existing Neutral Wire Of Acsr Weasel Conductor Of Street Light ( A ) Stp Sp-23 Pole D / P 17 Dismantaling Of Existing Neutral Wire Of Acsr Weasel Conductor Of Street Light ( B ) Acsrrabit Conductor 18 Excavation Of Earth For Pole Pit Of Size .9X6x1 / 6 Of Pole Length For Erection Of Pole In All Type Of Soil Including Proper Dressing Of Sides And Ramming Of Bottom Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed Complete Work 19 Erection Of Sp 55 Single Pole Support In Proper Level And Alignment Along With Fixing Of All Accessories Like Top Channel And Clamps As Per Respo Construction Manual 20 Erection Of Sp 55 Double Pole Support In Proper Level And Alignment Along With Fixing Of All Accessories Like Top Channel And Clamps As Per Respo Construction Manual 21 Grouting Of Pole In Size .45X.45.X1 / 9 Of The Support In Ratio 1:4:8 Block Including Cost Of Cement Sand And Stone Ballast, Back Filling Of Soil And Boulders In Pit And Ramming And Proper Alignment Levelling As Per Respo 22 Muffing Of Poles Size .45X.60 Cm Radius With Cc 1:3:6 Block Size 45 Cm Height From Ground Level Including Cost Of Cement Stone And Snd Etc 23 Excavation Of Earth For Stay Pit Of Size .6X.6X1.2 Mtr In All Type Of Soil Including Proper Dressing Of Sides And Ramming Of Bottom Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed Complete Work 24 Fixing, Tightening And Nozzling Of Stay With Pole And Stay Rod On Required Tension As Per Drawing 33 Kv Stay 25 Grouting Of Stay In Size .6X.6.X.3In Ratio 1:4:8 Block Including Cost Of Cement Sand And Stone Ballast, Back Filling Of Soil And Boulders In Pit And Ramming And Proper Alignment Levelling As Per Respo 26 Laying , Stringing And Sagging Of Additional Lt Nuetralal Alu Cond .Unarmoure Power Cable 1*35 Sqmm. 27 Installation Of 11 Kv Fuse Set Complete Including Supply Of Material And Provisions Of Mounting 28 Laying Of 11Kv Xlpe Cable Size Of 3*120 Sqmm In Cable Trench .75 Mtr Deep Trench Providing On Side & Top With Proper Filling Of Sand ( Including Cost Of Sand And Bricks ) 29 Laying, Spreading Stringing And Sagging Of 33 Kv Line Of Acsr Rabbit 3 Phase 4 W Complete 30 Termination Of Cable Kitsas Specification Up To Energisation 31 Chemical Earthing -Earthing Of Distribuition T / F Including Of Pits Of Size 2.5 Mtr Depth And Make A Hole Of Size 15 Mm, Placing Of Electrode To Be Supplied By Contractor As Per Drawing No ) As Drawing B, Connecting The Same With Gi Strip ( To Treatment Of Soil With Highly Conductor Substance As Per Spec In All Respect. 32 Dismantaling Of Old Damaged Ltdistribition Box 33 Fixing Ofnew Mccb Properly Including Cutting , Welding Complete As Reconection Of All Conection Properly 34 Repairing Of Non Working Tpmo Blade With Adjusting Jaw Blade As Working Properly . 35 Repairing Of Fencing Properly 36 Instalation Of New Fencing . 37 Repairing Of Plinth Of Substation Including Work And Including Cost Of Sand , Blast , Cement Etc. 38 Laying , Sagging And Fixing Of Lt Xlpe Cable Of Transformer -Mccb - Pole And Properly Fixing With Lt Distribution Box 39 Dismantaling Of 100 Kva T / F Of Low Clerence At Road Side. 40 Dismanting Of Substation Structure And Tpmo And Re Instalation Of Structure As Proper Hight And Opposite Side . 41 Mountingof 100 Kva T / F 42 Earthing Of Support 43 Lopping Of Trees 44 Providing Survey And Gps Details For Mapping Of New Infrastructure In Rapdrp 45 Fixing And Installation Of 11 Kv Outdoor Pole Mounted ( Ct Pt Combined ) With Meter Box
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 21-Jan-2023 | date extention of tender | Date | 02-Feb-2023 |
| 2 | 03-Feb-2023 | Date extension | Date | 02-Mar-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | Supply of P.P & Clamp for SP-55with N/B. |
| 2 | Supply of Stay Clamp for SP-55with N&B single ended |
| 3 | Supply of Stay Clamp for SP-55with N&B Doubleended |
| 4 | Supply of Bracing top clamp for SP-55 With N/B |
| 5 | Supply of Bracing bottom clamp for SP-55 With N/B |
| 6 | Supply of Earth clamp for SP-55 with N/B |
| 7 | Supply of E-braket clamp 11 KV |
| 8 | Supply of AL lug Dowel make 240 mm |
| 9 | Supply of AL lug Dowel make 240 mm |
| 10 | Supply of 11 KV TPMO Jaw -blade |
| 11 | Cartage of material by private truck from store centreHaldwani / Almora to dump store including loading-unloading (Avg. distance 100Km.) (a) STP SP-55Pole |
| 12 | Cartage of material by private truck from store centreHaldwani / Almora to dump store including loading-unloading (Avg. distance 100Km.) (b) Cartageof Small material |
| 13 | Head load cartage of following materials from dump store to work site (Avg. distance0.4.) (a) STP SP-55 Pole |
| 14 | Head load cartage of following materials from dump store to work site (Avg. distance0.4.) (b) Cartageof Small material |
| 15 | Febrication ofTop channel /Bracing angle as per specification |
| 16 | Dismantaling of existing neutral wire of ACSR Weasel conductor of Street light (a) STP SP-23 Pole D/P |
| 17 | Dismantaling of existing neutral wire of ACSR Weasel conductor of Street light (b) ACSRRabit conductor |
| 18 | Excavation of earth for pole pit of size .9X6X1/6 of pole length for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work |
| 19 | Erection of SP 55 Single Pole support in proper level and alignment along with fixing of all accessories like top channel and clamps as per RESPO Construction manual |
| 20 | Erection of SP 55 Double Pole support in proper level and alignment along with fixing of all accessories like top channel and clamps as per RESPO Construction manual |
| 21 | Grouting of pole in size .45x.45.x1/9 of the support in ratio 1:4:8 block including cost of cement sand and stone ballast, back filling of soil and boulders in pit and ramming and proper alignment levelling as per RESPO |
| 22 | Muffing of poles size .45x.60 cm radius with CC 1:3:6 block size 45 cm height from ground level including cost of cement stone and snd etc |
| 23 | Excavation of earth for stay pit of size .6x.6x1.2 mtr in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work |
| 24 | Fixing, tightening and nozzling of stay with pole and stay rod on required tension as per drawing 33 KV Stay |
| 25 | Grouting of stay in size .6x.6.x.3in ratio 1:4:8 block including cost of cement sand and stone ballast, back filling of soil and boulders in pit and ramming and proper alignment levelling as per RESPO |
| 26 | Laying ,Stringing and Sagging of Additional LT NuetralAl Alu cond .unarmoure power cable 1*35 Sqmm. |
| 27 | Installation of 11 KV Fuse set complete including supply of material and provisions of mounting |
| 28 | Laying of 11KV XLPE Cable size of 3*120 Sqmm in cable trench .75 mtr Deep trench providing on side & top with proper filling of sand (Including cost of sand and bricks) |
| 29 | Laying, spreading stringing and sagging of 33 KV line of ACSR Rabbit 3 Phase 4 W complete |
| 30 | Termination of cable kitsas specification up to energisation |
| 31 | Chemical earthing -Earthing of Distribuition T/F including of pits of size 2.5 mtr depth and make a hole of size 15 mm, placing of electrode to be supplied by contractor as per drawing no) as drawing B,connecting the same with GI Strip (to treatment of soil with highly conductor substance as per spec in all respect. |
| 32 | Dismantaling of old damaged LTDistribition box |
| 33 | Fixing ofnew MCCB properly including cutting ,welding complete as reconection of all conection properly |
| 34 | Repairing of non working TPMO Blade with adjusting jaw blade as working properly . |
| 35 | Repairing of Fencing properly |
| 36 | Instalation of new Fencing . |
| 37 | Repairing of Plinth of Substation including work and including cost of sand ,blast ,cement etc. |
| 38 | Laying ,sagging and fixing of LT XLPE Cable of Transformer -MCCB - Pole and properly fixing with LT Distribution Box |
| 39 | Dismantaling of 100 KVA T/F of low Clerence at road side. |
| 40 | Dismanting of Substation structure and TPMO and re instalation of structure as proper hight and opposite side . |
| 41 | Mountingof 100 KVA T/F |
| 42 | Earthing of support |
| 43 | Lopping of trees |
| 44 | Providing survey and GPS details for mapping of new infrastructure in RAPDRP |
| 45 | Fixing and installation of 11 KV Outdoor Pole mounted (CT PT Combined) with meter box |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed