Design, Construction, Erection, Testing & Commissioning Of 2.50 Mld Sewage Treatment Plant Based On Sequential Batch Reactor (Sbr) Technology Complete In All Respect Including Mps With Peak Factor 3,Land Scapping, All Civil, Electrical, Mechanical Work, P, panipat-Haryana

Public Health Engineering Department-PHED has published Design, Construction, Erection, Testing & Commissioning Of 2.50 Mld Sewage Treatment Plant Based On Sequential Batch Reactor (Sbr) Technology Complete In All Respect Including Mps With Peak Factor 3,Land Scapping, All Civil, Electrical, Mechanical Work, P. Submission Date for this Tender is 18-01-2023. Reactor Tenders in panipat Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

35512169
Design, Construction, Erection, Testing & Commissioning Of 2.50 Mld Sewage Treatment Plant Based On Sequential Batch Reactor (Sbr) Technology Complete In All Respect Including Mps With Peak Factor 3,Land Scapping, All Civil, Electrical, Mechanical Work, P
Open Tender
Indian
Haryana
panipat
18-01-2023

Tender Details

Design, Construction, Erection, Testing & Commissioning Of 2.50 Mld Sewage Treatment Plant Based On Sequential Batch Reactor ( Sbr ) Technology Complete In All Respect Including Mps With Peak Factor 3, Land Scapping, All Civil, Electrical, Mechanical Work, Piping & Instrumentation Work With Plc & Scada Arrangement For Sbr Unit Of Stp & Mps As Described In Scope Of Work Of Dnit Including O &M For 12 Months During Defect Liability Period After Trial Run Of 3 Months And 5 Years Thereafter At Village Rana Majra Distt. Panipat.

Key Value

Document Fees
INR 15000 /-
EMD
INR 1084800.0 /-
Tender Value
INR 5.42 Crore /-

BOQ Items

“Design, construction, erection, testing & commissioning of 2.50 MLD Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including MPS with peak factor 3,land scapping, all civil, Electrical, Mechanical work, Piping & Instrumentation work With PLC & SCADA Arrangement for SBR unit of STP & MPS as described in scope of work of DNIT including O &M for 12 Months during defect liability period after trial run of 3 months and 5 years thereafter at Village Rana Majra Distt. Panipat.
Sl. No. Item Description
1MAIN PUMPING STATION a) Design, construction, erection, testing & commissioning of MPS and following components: b) RCC Inlet chamber, screening chamber, collecting tank, , wet well sump suitable for 2.50 MLD average flow with peak factor 3 including Providing and installing 5 no. non clog sewage submersible pump sets ie. 1 No. of 5300 LPM, 2 no. of 1800 LPM & 2 no. 900 LPM having minimum head of 20 m, equipped with suitable LT panel boards, all safety devices, automatic capacitor bank & suitable size submersible cable from LT panel to pumps complete in all respect including O&M for during Defect liability period of 12 months after trial run period of 3 months & 5 years thereafter. c) K9 DI pipe of suitable dia at MPS including welding and screwing of flanges, ISI marked D.I. fittings, sluice valves, non returning valves as per requirements even for bye-pass arrangements complete in all respect including O&M for during Defect liability period of 12 months after trial run period of 3 months & 5 years thereafter d) 3 Nos. CI Gear Operated Sluice Gate with SS Spindle (SS 410) and seats (SS 304) (2 nos. for screen and 1 no. for partition of collecting tank) as per design including O&M for during Defect liability period of 12 months after trial run period of 3 months & 5 years thereafter. e) Supply and installation of 2 mechanical coarse screens suitable for2.50 MLD average flow with peak factor of 3.0 complete in all respect including O&M for during Defect liability period of 12 months after trial run period of 3 months & 5 years thereafter. f) All other infrastructure except construction of staff quarter, Boundary wall, path ways / roads and work covered under Schedule -1A (HSR - Items) required to be executed at site to make the MPS functional is included in the scope of work for lump-sum job. g) All the pumping machinery, panel board, Level sensor etc shall be controlled by PLC & SCADA and shall be synchronized with PLC panels at MPS & STP site through broadband internet facility. h) The connectingsewerofsamedia meterandmaterialofconstructed laid at equate depthbetween existing sewer to newly constructed structure is included in this scope of work i) The size and quantities of all the above components will be as per approved structural/ Hydraulic / Mechanical/ Electrical design to be approved by Departmental before actual execution of work
2SEWERAGE TREATMENT PLANT a) Design, construction, erection, testing & commissioning of 2.50 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including Landscaping, MCC Panel Room, all other contingent ie. Electrical, Mechanical, Piping & Instrumentation work with PLC & SCADA arrangement for STP integrated with MPS including furniture & laboratory equipments as per detail given in the bid document and following components including O&M for during Defect liability period of 12 months after trial run period of 3 months & 5 years thereafter. b) Supply and installation 2 Nos. fine Screens of suitable size for 2.50 MLD average flow with peak factor of 3 including O&M for during Defect liability period of 12 months after trial run period of 3 months & 5 years thereafter. c) 2 No. High Mast of 9 mtr GI Octagonal pole of 4 mm thickness (T=100 mm, B=200mm, Base Plate = 320 x 320 x 20 mm), Window at 500 mm from Base Plate with 6 No. LED suitable size, outdoor type energy efficient lamps on each pole, 20 no. LED outdoor light with 7 m. high GI pole along road / path including all accessories complete in all respect including O&M for during Defect liability period of 12 months after trial run period of 3 months & 5 years thereafter. d) Supply and installation of 1 No. 3.65 m wide Main Gate of MS and 1.25 m. wide wicket gate at STP to the entire satisfaction of Engineer-in-charge. (Total weight not less than 500 kg) including O&M for during Defect liability period of 12 months after trial run period of 3 months & 5 years thereafter. e) Providing and installing 2 No. centrifuges (1 Working + 1 Stand bye) including centrifuge feed pump, all fittings, instrumentations, electric panel board etc. as per design complete in all respect including packing dry sludge in 20 Kg. bag and supplying the same in market Kisan Sewa Kendra or as directed by Engineer-in-charge within the lead as pointed at clause 4.4.4 of the DNIT including O&M for during Defect liability period of 12 months after trial run period of 3 months & 5 years thereafter
3ONLINE OUTLET EFFLUENT WATER QUALITY MONITORING SYSTEM Supply, Installation, Testing, Commissioning, Operation and Comprehensive Annual Maintenance of effluent quality monitoring system at 2.50 MLD capacity STP at Rana Majrafor online (continuous) measurement of PH, Total Suspended Solids (TSS), Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD) by single analyzer with various sensors (spectral measurement in the UV-VIS range 200-720mm) performing reagent and chemical free analysis with automatic cleaning of censor, signal cables and power cables, local data acquisition and display of data on continuous basis for up linking the data to CPCB, HSPCB & PHED,TUV approved complete in all respect as per Central Pollution Control Board (CPCB) guidelines for online continuous monitoring system for effluents and as contained in scope of work in the DNIT including O&M for during Defect liability period of 12 months after trial run period of 3 months & 5 years thereafter. a) Multi-parameter measuring converter, for connecting up to 18 intelligent sensors Scope including 8 analog inputs / outputs (4 inputs & 4 outputs) (0/4-20Ma), wide- range power supply Optical COD/BOD and TSS probe with spectral processing of the UV-VIS range, for measurement in the outlet / effluent of2.50 MLD capacity STPat village Rana Majra with integrated with automatic cleaning including O&M for during Defect liability period of 12 months after trial run period of 3 months & 5 years thereafter. b) Robust digital pH/ORP sensor for pH/ORP electrodes, with built-in pre-amplifier & temperature sensor with Automatic Temperature Compensation (ATC) Cable length 100 Meter (minimum) including O&M for during Defect liability period of 12 months after trial run period of 3 months & 5 years thereafter. c) Sensor adapter cable for all intelligent sensors, with IP68 water proof connection to the intelligent Sensor Net system. Cable length 100 meter (minimum) including O&M for during Defect liability period of 12 months after trial run period of 3 months & 5 years thereafter. d) Data transfer to CPCB, HSPCB & PHED servers during O&M period of 6 years (Including defect liability period of 1 year) after completion of trail run of 3 month including O&M for during Defect liability period of 12 months after trial run period of 3 months & 5 years thereafter. e) Providing GSM 3G, 4G modem with mobile network connectivity including network including O&M for during Defect liability period of 12 months after trial run period of 3 months & 5 years thereafter.
4CCTV CAMERAS Providing and Installing 6 CCTV Cameras (4 Cameras for STP and 2 Cameras for MPS) complete as per satisfaction of the Engineer– in- Charge, within 96 hours of signing the Agreement along with 90 days recording (DVR), 32 inch LED Screen, 16 Channel DVR at STP Site and 8 Channel DVR at MPS Site with connectors, cables, poles and power supply with online real-time output facility. The cameras at both the sites i.e. MPS and STP shall be synchronized at STP site including O&M for during Defect liability period of 12 months after trial run period of 3 months & 5 years thereafter. i) At STP & MPS Site- 1 No. PTZ speed dome 360 degree 50X zoom camera, 3 No. 12 mm lens size, 1 Nos. 3.6mm lens size. Make: - CP Plus Internet Protocol minimum 5 MP WDR, Night vision color mode 2.4.2 12 mm very focal with extra IR. CCTV Cameras should be installed and commissioned before starting of the work.
5ANNEXE BUILDING Construction of HT / LT Panel room, PLC room, Centrifuge house, blower room and Lab cum office building including doors, windows & fittings with toilet block including all Sanitary fittings etc. as per drawings approved by SE at MPS & STP.250 Sqm covered area built up with RCC framed structure & brick work finished with vitrified glazed tiles flooring, powder coated aluminum frame made with 10 guage sheet having size 100mm x 45mm for chowkhat, 75mm x 45mm for door frame & 45mm x 45mm for window frame with 5mm thick glass AIS/Saint Gobain/ Modi Float including O&M for during Defect liability period of 12 months after trial run period of 3 months & 5 years thereafter.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail