Uttarakhand Power Corporation Limited-UPCL has published Estimate Of Overhauling Of Dtrs In Different Capacity In Didderent Area Of Edsd-Lalkuan Under Edd (Rural) Haldwani. Submission Date for this Tender is 12-01-2023. Distribution Transformer Tenders in haldwani Uttarakhand. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Supply Item |
2 | LT Bushing Complete rod (brass) for 25 and 63 KVA |
3 | LT Bushing Complete rod (brass) for 100 KVA |
4 | LT Bushing Complete rod (brass) for250KVA to 400 KVA |
5 | LT Bushing Complete rod (brass) for630 KVA |
6 | T/F Breather Assembly (0.5 Kg Complete) |
7 | T/F Breather Assembly (1 Kg Complete) |
8 | L- Conntect copper metal (500 AMP) |
9 | Cork Sheet 4"X4X6 mm |
10 | Arcing Horn |
11 | Labour Charge: Opening of HT/LT Connections Dismounting of T/F From S/S D/P/Plangth and shifting of T/Fs upto repairing site. |
12 | 25 KVA |
13 | 63 KVA |
14 | 100 KVA |
15 | Opening of with top plate cover and conserver tank of T/F 11 KV bushing complete by opening nut and bolts/or cutting welding &safe stacking at work site |
16 | 25 KVA |
17 | 63 KVA |
18 | 100 KVA |
19 | 250 KVA |
20 | 400 KVA |
21 | 630 KVA |
22 | Draining out of T/F Oil from the tank of T/F & collecting in drums including proper & safe stacking at work site including labour and T&P required |
23 | 25 KVA |
24 | 63 KVA |
25 | 100 KVA |
26 | 250 KVA |
27 | 400 KVA |
28 | 630 KVA |
29 | Opening of LT bushing from inside and outside of T/F opening of clamps of core assemblyand taking out the core /winding assembling out of T/F tank including proper and safe stacking at work site. |
30 | 25 KVA |
31 | 63 KVA |
32 | 100 KVA |
33 | 250 KVA |
34 | 400 KVA |
35 | 630 KVA |
36 | Preparation of LV LEG COILS - All LV leg coils of the T/F will be prrepared by new DPCLT strip |
37 | 25 KVA |
38 | 63 KVA |
39 | 100 KVA |
40 | 250 KVA |
41 | 400 KVA |
42 | 630 KVA |
43 | Makingof HV LEG COILS - All HVcoils of the T/F will be new DSC/SE winding wire of same size and same no to turns |
44 | 25 KVA |
45 | 63 KVA |
46 | 100 KVA |
47 | 250 KVA |
48 | 400 KVA |
49 | 630 KVA |
50 | Repaing of HT connection leads by jointing with soldering etc. with providiong empire sleeve and proper taping encluding replacements of carbonised bushing and replacement of old packing with new rubbersied cork sheet pakcing work complete in all respect. |
51 | 25 KVA |
52 | 63 KVA |
53 | 100 KVA |
54 | 250 KVA |
55 | 400 KVA |
56 | 630 KVA |
57 | Repairing of carbonised /burned LT side connecting strips by way of soldering /tightening with bolts and nut with providing empire sleeve and proper tappling of leads of all the three phase one Neutral of LT side alongwith replacement carbonised /damage bushing &replacement of old core winding assembling to remove mousture contents from core stamping including Labour and T&P required |
58 | 25 KVA |
59 | 63 KVA |
60 | 100 KVA |
61 | 250 KVA |
62 | 400 KVA |
63 | 630 KVA |
64 | Providing skilled labour for tesing alongwith welding of Top covers plate/tightening of nuts&bolts of T/F (Weilding rods shall be arranged by the contractor) |
65 | 25 KVA |
66 | 63 KVA |
67 | 100 KVA |
68 | 250 KVA |
69 | 400 KVA |
70 | 630 KVA |
71 | Repairng of T/F tank after removing sludege deposit from the bottom of the tank & cleaning of core/winding assembling with T/F oil complete work including labour & T&P required. |
72 | 25 KVA |
73 | 63 KVA |
74 | 100 KVA |
75 | 250 KVA |
76 | 400 KVA |
77 | 630 KVA |
78 | Housing of core/winding assembling inside the T/F tank fixing of tighting clamp with core assembling making LT connectionn with LT bushing & necessary taping of leads etc, complete work including labour & T&P required. |
79 | 25 KVA |
80 | 63 KVA |
81 | 100 KVA |
82 | 250 KVA |
83 | 400 KVA |
84 | 630 KVA |
85 | Providing of fixing on the top of the core channel, tape changer specification as per sample & connection with the coils. |
86 | 250 KVA |
87 | 400 KVA |
88 | 630 KVA |
89 | Placing of conservator tank with top plate cover of T/F KV bushing providing fresh rubberished core sheet packing & tighting with the help of nut & bolts & washer/ by way of weilding top plate with t/f tank encluding labour & T&P requried. |
90 | 25 KVA |
91 | 63 KVA |
92 | 100 KVA |
93 | 250 KVA |
94 | 400 KVA |
95 | 630 KVA |
96 | Fitting and tapping up T/F oil in T/F tank properly & complete tesing of T/F by meegar rresult & open & short circuit test result |
97 | 25 KVA |
98 | 63 KVA |
99 | 100 KVA |
100 | 250 KVA |
101 | 400 KVA |
102 | 630 KVA |
103 | Cleaning of breather assemply encluding replacement of old pacing & silica Zel with new silica zel encluding with albour & T&P required |
104 | 25 KVA |
105 | 63 KVA |
106 | 100 KVA |
107 | 250 KVA |
108 | 400 KVA |
109 | 630 KVA |
110 | Shifting of T/F from work to site to T/F double pole & Mounting of T/F on s/S double pole cleaning of terminal of LT cable removing of carbon by send pepring etc and providing new lugs of terminals fixing and making complete connection with the T/Fs |
111 | 25 KVA |
112 | 63 KVA |
113 | 100 KVA |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail