Improvement To Jhulenbar Mip In Patnagarh Block Of Bolangir District Under Rr And R Scheme - 2022-23.
Tender Value
19.53 Lakhs
Estimated cost
Bid Submission
10 Jan 2023
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
6000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
patnagarh → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Improvement To Jhulenbar Mip In Patnagarh Block Of Bolangir District Under Rr And R Scheme - 2022-23.
BOQ
| Sl. No. | Item Description |
| 1 | IMPROVEMENT TO JHULENBAR MIP IN PATNAGARH BLOCK OF BALANGIR DISTRICT UNDER RR&R SCHEME 2022-23 |
| 2 | Clearing and grubbing jungles including uprooting tank vegetation, grass bushes, shrubs, saplings and trees of girth up to 300mm, removal of stumps of trees cut earlier and disposal of unserviciable material and stacking of useful materials with supply of all labour T & P and all taxes as per prevailing norm etc. complete as directed by the Engineer-in-charge. |
| 3 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil including stony earth, gravel and moorum etc. interspread with boulders up to 1/2 cum size with alllifts and delifts including dressing of slopes and bed to design level & section ( benching& stripping of Dam )and depositing the excavated materials away from the work site as per the specificationfrom the place of excavation including supply of all labour, all taxes as per norm, construction & maintaining haul roads required for the work etc. complete as directed by the Engineer-in-charge. |
| 4 | Earth work in excavation desilting of ordinary soilin canal with all leads and lifts to proper slope and profile as per the requirement including the rough dressing and disposing off the soil at designated place marked for the purpose (Filling of low lying areas only to avoid all types of environment hazards) alongwith supply of all labour and tools & plants, all materials, labourincluding all taxes as per prevailing norm & supervision charges to complete the item of workand as per the direction of the Engineer-in-charge. (comparison of Measurement will be made both at excavated area & dump area for tallyng the quantity). |
AI Tender Summary
Tender Timeline
Dec 28, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedJan 10, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJan 11, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender