Haryana Urban Development Authority-HUDA has published Annual Maintenance Ofephs In Sector-14, U/E, Karnal. “Earthwork Embankment, Providing And Laying Of Wmm, Gsb, 50Mm Thick Dbm, 30Mm Thick Bc And 0.25 Kg P/Sqm Tack Coat Complete In All Respect And All Other Works Contingent Thereto”.. Submission Date for this Tender is 02-01-2023. Embankment Tenders in karnal Haryana. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Construction of Embankment with Material obtained from Borrow pits Construction of Embankment with approved material obtained from borrow pits, including compensation of earth, with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications |
2 | Water Bound Macadam Gr I 17.22.2 Water Bound Macadam Grading I with screening Type "A" Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-1 0 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications |
3 | Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per technical clause 406 of MORT&H specifications |
4 | Tack coat 17.26.1Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications |
5 | Dense Graded Bituminous Macadam with Batch Type HMP 17.30.2 Dense Graded Bituminous Macadam 50 mm to 75 mm thickness (Grading II) 17.31 Providing and laying 50mm - 75 mm dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG 30 @ 4.5% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete, as per technical clause No. 505 of MORT&H specifications |
6 | Bituminous Concrete with Batch type HMP 17.31.2 Bituminous Concrete 30 mm to 45 mm thickness (grading II) with 100-120 TPH batch type HMP Providing and laying 30mm - 45 mm bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG - 30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy