Tender For Improvement To Main Pond, Baby Pond, Bhathing Ghat, Steps, Inlet In Thamarai Kulam, Dhamaneri Panchayat In Rk Pet Block
Tender Value
9.17 Lakhs
Estimated cost
Bid Submission
03 Jan 2023
0 days left
EMD
9500
Bank guarantee accepted
Document Fee
9500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Thiruvallur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Improvement To Main Pond, Baby Pond, Bhathing Ghat, Steps, Inlet In Thamarai Kulam, Dhamaneri Panchayat In Rk Pet Block
BOQ
| Sl. No. | Item Description |
| 1 | Improvement to main pond, Baby pond, Bhathing ghat, Steps, Inlet in Thamarai Kulam, Dhamaneri Panchayat in RK Pet Block. |
| 2 | Clearing the scrub jungle, Julliflora Jungle and disposing of the same as dirctedby theEngineer incharge of works and as per technical specification (specification) |
| 3 | Earth work in all soils except hard rock requiring blasting and conveying and formation of bund with 0 to 100m deploying earth moving macchineries and tippers including benching, formation of bunds breaking clods, sectioning, labourand higher charges for closing breaches for extra watering and consolidation by power roller including hire charges etc complete. |
| 4 | Channel Earthwork Quantity |
| 5 | Supplying and fixing of RCC Boundary stone of size of 0.15x0.15x1.60 |
| 6 | Construction of Retaining wall for baby pond |
| 7 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth , shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation. |
| 8 | Cement concrete 1:4:8 mix use 40mm matal including cost and conveyance of all materials to site and all labour charges etc |
| 9 | Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc… |
| 10 | CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.. |
| 11 | Plasterering with CM 1:4 20mm Thickness including cost and conveyance and all labour charges etc.. |
| 12 | Construction of Bathing Ghat, Steps, Outer Platform |
| 13 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth , shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation. |
| 14 | Cement concrete 1:4:8 mix use 40mm matal including cost and conveyance of all materials to site and all labour charges etc |
| 15 | Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc… |
| 16 | CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.. |
| 17 | CC 1:3:6 mix using 20mm metal including cost and conveyance and all labour charges etc.. |
| 18 | CC 1:2:4 mix using 20mm metal including cost and conveyance and all labour charges etc.. |
| 19 | Plasterering with CM 1:4 20mm Thickness including cost and conveyance and all labour charges etc.. |
| 20 | Construction of Steps Over Bund |
| 21 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth , shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation. |
| 22 | Cement concrete 1:4:8 mix use 40mm matal including cost and conveyance of all materials to site and all labour charges etc |
| 23 | Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc… |
| 24 | CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.. |
| 25 | CC 1:2:4 mix using 20mm metal including cost and conveyance and all labour charges etc.. |
| 26 | Plasterering with CM 1:4 20mm Thickness including cost and conveyance and all labour charges etc.. |
| 27 | Inlet Arrangement |
| 28 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth , shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation. |
| 29 | Cement concrete 1:4:8 mix use 40mm matal including cost and conveyance of all materials to site and all labour charges etc |
| 30 | Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc… |
| 31 | CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.. |
| 32 | Supplying suitable gravel and providing gravel packing 15cm thick for revetment including machin the same for premeasurement spreading and woaring with water to plastic waste complete as directed by the engineer in charge of work |
| 33 | Rough stone dry packing for revetment and apron using new stones obtained by approved sources including the cost of new wedges for filling the gaps etc., and complete on the work as directed by the Engineer un charge |
| 34 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |
AI Tender Summary
Tender Timeline
Dec 26, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedJan 03, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJan 03, 2023
Bid Opening Date
Technical bids will be opened and evaluated.