| 1 | Name of the Work : Repairs to AGAMT Library building atMettumahadhanapuram H/O Mahadhanapuram Panchayat under AGAMT-II 2022-23 |
| 2 | Distembering two coats of approved colour over old including ncost and conveyance of all materials and and all labour charges etc complete. |
| 3 | Painting two coats with ready Exterior Emulsion of approved quality and colour over a priming coat,including thorough scrap ping,clean removal of dirt including cost, conveyance and all labour charges etc complete |
| 4 | Painting with readymixed Enamel paint with Old Iron Work two coats including cost and conveyance of all materials to site and all labour charges etc., Compelete. |
| 5 | Construction of Ramp (Sub Estimate) |
| 6 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 7 | Cement Concrete 1:4:8 mix using 40mm ISS metal including cost and coveyance of all materials to site and all labour charges for mixing, aying and curing etc., Complete |
| 8 | Brick work in cement mortar 1:5 using country bricks of size 83/4\"x41/4\"X23/4\" etc., Complete |
| 9 | Plasteirng with cm 1:5 mix using 12mm thick for walls including cost |
| 10 | Providing granolithic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum |
| 11 | Construction of New Toilet |
| 12 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 13 | Cement Concrete 1:4:8 mix using 40mm ISS metal including cost and coveyance of all materials to site and all labour charges for mixing, aying and curing etc., Complete |
| 14 | Random Rubble Masonary in CM 1:5 mix using rough stone with simultanious pointing with same mortor including cost, conveyance of materials and all labour charges etc., complete |
| 15 | Brick Work in cm 1:5 mix for foundation and basement using rough stone and bond stones with simultaneous pointing with same morter etc., completed |
| 16 | Plastering with coment mortar 1:5 12mm thick in all floors including curing etc., |
| 17 | Paving the floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc., complete |
| 18 | Distember two coats of approved colour over including cost and conveyance of all materials and all labour charges etc., complete |
| 19 | Painting two coats of approved emulsion paint over one priming over one priming coat of old wall surface including cleaning preparing the surface and curring etc complete |
| 20 | Painting two coats of new iron works such as steeldoors, Window, ventilators, window bars, balustrdes etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coat etc., |
| 21 | Provision for Roof Slab arrangement |
| 22 | European Water closet with all fittings and 10lit capacity flusing tank |
| 23 | Provision for water supply arrangement |
| 24 | Supply & Cost of 500 lit Capacity HDPE Tank |
| 25 | GST Amount for providing Service to Government Contract Works for the above ConstructionWorks.GST Amount is the Total GST Amount for overall quoted amount above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |