|
| 1 | Professional Staff |
| 2 | Team Leader Cum Senior Highway Engineer (1 No.) |
| 3 | ResidentcumHighway Engineer (2 Nos.), |
| 4 | Bridge/Structural Engineer (1 No.) |
| 5 | Senior Pavement Specialist (2 No.) |
| 6 | Senior Quality Cum Material Expert (3 No.) |
| 7 | Road Safety Expert (1 No.) |
| 8 | Sub-Professional Staff |
| 9 | Survey Engineer, 3 Nos. (One for each Package) & 1 No. for Maintenance of Package-1 & 2&3 |
| 10 | Assistant Highway Engineer, 1 Nos.& 1 interminttent input during maintenance |
| 11 | Lab Technician (3 nos duringConstruction Period and 1 during maintenance |
| 12 | Quantity Surveyor (3 nos duringConstruction Period) 1 No. for Maintenance of Package-1 & 2&3 |
| 13 | Support Staff (inclusive of per diem allowance) |
| 14 | Office Manager (2 No) |
| 15 | Accountant Cum Cashier (1 No) |
| 16 | Steno cumComputer operator (1 No) |
| 17 | Office Boy (1 No) |
| 18 | Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run |
| 19 | Bolero or equivalent 4x4 vehicle (not more than 3 years old)(4 nos during Construction Period and 3 nos during Maintenance Period.) |
| 20 | Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer\"s Site Offices/Regional Office. The quoted amount against remuneration should include travel fare for 30 round trip to Employer\"s Head Office and 30 round trip to Employer\"s regional office. (including Hotel Charges, travel costs etc. complete) |
| 21 | Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. |
| 22 | Two Office of Minimum 300 sqm area shall be rented at one location in midway of project during Construction Period |
| 23 | One Office of Minimum 50 sqm area shall be rented in midway of project during Maintenance Period |
| 24 | Office Supplies, Utilities and Communication (Fixed Costs): e.g. Office Supplies, Drafting Supplies, Computer Running Costs, Domestic and International Communication etc. |
| 25 | During Construction Period |
| 26 | During Maintenance Period |
| 27 | Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input), PCs (8 No., Intel Core i3, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows 8/10, pre-loaded anti-virus etc.), laser/colour printers (3 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc.), Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc. |
| 28 | During Construction Period |
| 29 | During Maintenance Period |
| 30 | Reports and Document Printing |
| 31 | Monthly reports |
| 32 | Half yearly Reports |
| 33 | Various other reports as provided in the Concession Agreement such as Completion Report |
| 34 | Cost towards Road Survey Equipment (Network Survey Vehicle/Falling Weight Deflectometer/Mobile Bridge Inspection Unit/Retro Reflectometer) including all required manpower, software & report processing etc. |
| 35 | Surface defects detection and roughness measurementusing Network Survey Vehicle (106 kms x 9 times) |
| 36 | Pavement strength measurement using FWD (106 kms x 4 times) |
| 37 | Bridge inspection using Mobile Bridge Inspection Unit (106 kms x 9 times) |
| 38 | Road signs inspection using Retro Reflectometer (106 kms x 9 times) |
| 39 | Contigencies A fixed amount of Indian Rupees Ten Lakh (Rs 10,00,000/-) shall be included in the Financial Proposal |