Petroleum and Natural Gas Boards / Undertakings / PSU Closing in 0 days TDR #35422677

Tender For Eia And Ra Study For Group B Extension Of Asanur-Sankari Section Of Ctmpl Upto Irugur

Issued by Boards / Undertakings / PSU · Irugur, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
12 Jan 2023
0 days left
EMD
6000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Irugur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Eia And Ra Study For Group B Extension Of Asanur-Sankari Section Of Ctmpl Upto Irugur

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 06-Jan-2023 Addendum No.1 Date 12-Jan-2023

BOQ

Name of Work:EIA and RA Study forGroup B: Extension of Asanur-Sankari section of CTMPL upto Irugur
Sl. No. Item Description
1GST % for the tender Please select the rate of GST in cell AY13. Rate selected shall be applicable for the entire BoQ.
2Group B: Station (Sankari Irugur Sectio)
3Carrying out Environment Impact Assessment (EIA) & Risk Analysis (RA) study to assess probable impact on environment/risk due to the project & suggest required mitigation measures, If any, for obtaining the required clearances from State Pollution Control Board/ MoEF&CC, GoI for Stations under project of \"Extension of Asanur-Sankari section of CTMPL upto Irugur\" in adherence to the EIA Notification, 2006 & subsequent amendments (Draft EIA notification 2020) made by MoEF&CC, Govt. of India. Details of stations are: 1.,,Sankari Originating Station 2.,,Irugur delivery Station Carrying out Environment Impact Assessment (EIA) study to establish present environmental parameters in & around the pipeline station facilities in 15 km radius and 1 km along pipeline route (500 meters on either side of the pipeline from centre-line) under stations of project of \"Extension of Asanur-Sankari section of CTMPL upto Irugur\". Identifying & evaluating potential environmental impacts that are consequent to the project facilities, carrying out consequence analysis of release of hydro-carbon to water-bodies etc. and recommend necessary mitigation measures, prepare EIA report covering all the relevant data on air, water, noise, land-use, temperature, available facilities, surrounding industries, place of historical importance, marine life, flora & fauna, water bodies, coastal areas, occupation, health, etc. of neighboring people etc. in accordance with the regulations of the concerned State PCB\"s, Notification of MoEF&CC, GoI as mentioned above and prepare an Environment Management Plan(EMP). Identification of Eco-sensitive area falling under the project, if any, shall also be included under this study. Carrying out Risk Analysis (RA) study for the proposed facilities envisaged under station of project of \"Extension of Asanur-Sankari section of CTMPL upto Irugur\" taking into account the proposed facilities and existing facilities in its surroundings, study done should identify the potential hazards, assess the impact of all probable accidental hazards and mitigation measures to reduce hazards of all the facilities, prepare RA report with mitigation measures & Disaster Management Plan(DMP). Risk analysis study shall comprise of, but not limited to: -Identification of risks by HAZOP/FETI approaches -Hazard analysis/damage model studies for the facilities, radiation effects etc. -Maximum Credible Accident Analysis bringing out type of fire hazards from the facilities, past accident analysis, risk factors, societal risk, Domino effects etc. -Observation of risk assessment study / recommendations. -Preparation & submission of ON-SITE EMERGENCY PLAN / DISASTER MANAGEMENT PLAN (DMP) for the subject pipeline, based on Risk Analysis and assessment. Note: The above also includes all expenses related to rendering assistance towards providing technical explanation / clarification that may require to be made to any statutory authority, whenever asked for and for attending offices of State PCB\"s/MoEF&CC, GoI/Other statutory authority along with IOCL officials to give presentations on the study, whenever asked, to facilitate clearances from State Pollution Control Board/MoEF&CC,GoI.
4Group B: Mainlin (Sankari Irugur Sectio)
5Carrying out Environment Impact Assessment (EIA) & Risk Analysis (RA) study to assess probable impact on environment/risk due to the project & suggest required mitigation measures, If any, for obtaining the required clearances from State Pollution Control Board/ MoEF&CC, GoI for Mainline of project of \"Extension of Asanur-Sankari section of CTMPL upto Irugur\" in adherence to the EIA Notification, 2006 & subsequent amendments (Draft EIA notification 2020) made by MoEF&CC, Govt. of India. Length of the Mainline is 122 km. Carrying out Environment Impact Assessment (EIA) study to establish present environmental parameters in & around the pipeline station facilities in 15 km radius and 1 km along pipeline route (500 meters on either side of the pipeline from centre-line) under mainline of project of \"Extension of Asanur-Sankari section of CTMPL upto Irugur\". Identifying & evaluating potential environmental impacts that are consequent to the project facilities, carrying out consequence analysis of release of hydro-carbon to water-bodies etc. and recommend necessary mitigation measures, prepare EIA report covering all the relevant data on air, water, noise, land-use, temperature, available facilities, surrounding industries, place of historical importance, marine life, flora & fauna, water bodies, coastal areas, occupation, health, etc. of neighboring people etc. in accordance with the regulations of the concerned State PCB\"s, Notification of MoEF&CC, GoI as mentioned above and prepare an Environment Management Plan(EMP). Identification of Eco-sensitive area falling under the project, if any, shall also be included under this study. Carrying out Risk Analysis (RA) study for the proposed facilities envisaged under mainline of project of \"Extension of Asanur-Sankari section of CTMPL upto Irugur\" taking into account the proposed facilities and existing facilities in its surroundings, study done should identify the potential hazards, assess the impact of all probable accidental hazards and mitigation measures to reduce hazards of all the facilities, prepare RA report with mitigation measures & Disaster Management Plan(DMP). Risk analysis study shall comprise of, but not limited to: -Identification of risks by HAZOP/FETI approaches -Hazard analysis/damage model studies for the facilities, radiation effects etc. -Maximum Credible Accident Analysis bringing out type of fire hazards from the facilities, past accident analysis, risk factors, societal risk, Domino effects etc. -Observation of risk assessment study / recommendations. -Preparation & submission of ON-SITE EMERGENCY PLAN / DISASTER MANAGEMENT PLAN (DMP) for the subject pipeline, based on Risk Analysis and assessment. Note: The above also includes all expenses related to rendering assistance towards providing technical explanation / clarification that may require to be made to any statutory authority, whenever asked for and for attending offices of State PCB\"s/MoEF&CC, GoI/Other statutory authority along with IOCL officials to give presentations on the study, whenever asked, to facilitate clearances from State Pollution Control Board/MoEF&CC,GoI.

AI Tender Summary

OUR REF NO 35422677
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 12-01-2023
Authority
Authority Name Indian Oil Corporation Limited
Work Description Eia And Ra Study For Group B Extension Of Asanur-Sankari Section Of Ctmpl Upto Irugur
Basic Detail
Tender No PLCC/CBR ASANUR-CTMPL-JNPT NMIA/MON/22119
Bidding Type Tender
Location
City Irugur
State Tamil Nadu
Key Dates
Publish Date 06 Jan 2023
Submission Date 12 Jan 2023
Open Date 13 Jan 2023
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 6000
Exemption Not Available
Document List
e54ec125-8bc4-470a-b907-00e8ea77993d.html
Bidders_help_Document_for.pdf
BOQ_170871.xls
Commercial_Annexure.rar
FAQs-IOCL-Online-EMD.pdf
Special_Instructions_to_t.pdf
Tender-Acceptance-Format.pdf
Tendernotice_1.pdf
Tender_document.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jan 06, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Jan 12, 2023
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 12, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jan 13, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

e54ec125-8bc4-470a-b907-00e8ea77993d.html

pdf

Bidders_help_Document_for.pdf

xls

BOQ_170871.xls

rar

Commercial_Annexure.rar

pdf

FAQs-IOCL-Online-EMD.pdf

pdf

Special_Instructions_to_t.pdf

pdf

Tender-Acceptance-Format.pdf

pdf

Tendernotice_1.pdf

pdf

Tender_document.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders