Uttar Pradesh State Construction and Infrastructure Development Corporation Limited has published Tender For Job Work In Depot Workshop Bijnor. Submission Date for this Tender is 07-01-2023. Tanks and Cylinders Tenders in bijnor Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | MAINTENANCE JOB WORK |
2 | M-40 MAINTENANCE |
3 | GENERAL CHECKING |
4 | GREESING PER BUS |
5 | KING PIN WORK PER KING PIN |
6 | DIESEL TANK DISMANTLING, REPAIRING & MOUNTING/ CLEANING |
7 | ENGINE JOB WORK |
8 | CHANGE OF ENGINE OIL AND OIL FILTER |
9 | ENGINE HEAD DISMANTLING & MOUNTING |
10 | ENGINE CHANGE URO-2 |
11 | ENGINE CHANGE URO-3 |
12 | ENGINE CHANGE URO-4 |
13 | DIESEL FILTER CHANGE |
14 | AIR FILTER CHANGE |
15 | AIR FILTER ASSEMBLY CHANGE |
16 | PISTON RING JOB WORK |
17 | CHANGE OF RADIATOR ASSEMBLY |
18 | AIR FILTER ASSEMBLY |
19 | HEAD TIGHTING |
20 | TAPET MATCHING |
21 | CHANGE OF ACCELARATOR CABLE |
22 | CHANGE OF TURBO CHARGER |
23 | CHANGE OF ENGINE MAIN OIL SEAL |
24 | CHANGE OF TIMING COVER OIL SEAL |
25 | CHANGE OF FAN BELT |
26 | CHANGE OF ENGINE FLYWHEEL |
27 | CHANGE OF ENGINE FLYWHEELCAM SHAFT |
28 | CHANGE OF ENGINE FRONT MAUNTING PAD |
29 | CHANGE OF ENGINE REAR MAUNTING PAD |
30 | CROSS MEMBER DISMANTLING & FITTING |
31 | CHANGE OF FLYWHEEL BEARING |
32 | F.I.P. & INJECTOR JOB WORK |
33 | DISMANTLING & FITTING OF F.I.P. |
34 | AIR LOCK REMOVAL |
35 | DISMANTLING OF INJECTORS |
36 | FITTING OF INJECTORS |
37 | CHANGE OF F.I.P. LEVER & BUSH |
38 | TRANSMISSON JOB WORK |
39 | CLUTCH PLATE SETTING |
40 | GEAR LEVER SETTING |
41 | CLUTCH PLATE 352 DIA CHANGE |
42 | PRESSURE PLATE 352 DIA CHANGE |
43 | CLUTCH PLATE 330 DIA CHANGE |
44 | PRESSURE PLATE 330 DIA CHANGE |
45 | G.B. 40 CHANGE |
46 | G.B. 60 CHANGE |
47 | G.BOX G.B. 40 OVER HAULING |
48 | G.BOX G.B. 60 OVER HAULING |
49 | CLUTCH RELEASE BEARING CHANGE |
50 | CLUTCH SLEEVE CYLINDER CHANGE |
51 | CLUTCH MASTER CYLINDER CHANGE |
52 | CLUTCH MASTER CYLINDER CHANGE |
53 | P. SHAFTDISMANTLING & MOUNTING |
54 | RUBBER CUSHION WITH CENTER BEARING CHANGE |
55 | WITHDRAAWL PLATE DISMANTLING & FITTING |
56 | FRONT AXLE JOB WORK |
57 | CHANGE OF FRONT KAMANI PER NOS |
58 | CHANGE OF FRONT CHASIS BRACKET PER NOS |
59 | CHANGE OF FRONT BRAKE DRUM |
60 | CHANGE OF FRONT DIAPHRAM |
61 | CHANGE OF DIAPHRAM WASHER |
62 | FRONT AXLE DISMANTLING & FITTING |
63 | REPAIR OF TIEROD |
64 | REPAIR OF PUSH & PULL ROD |
65 | VIHEEL ALIGNMENT |
66 | REAR AXLE JOB WORK |
67 | CHANGE OF REAR KAMANI PER NOS |
68 | CHANGE OF REAR CHASIS BRACKET PER NOS |
69 | REPAIRING OF KAMANI |
70 | CHANGE OF CROWN CAGE |
71 | CHANGE OF REAR DIAPHRAM |
72 | CHANGE OF HUB SHAFT |
73 | CHANGE OF TAIL PINION OIL SEAL |
74 | CHANGE OF REAR BRAKE DRUM |
75 | CHANGE OF BRAKE RACHET PER WHEEL |
76 | STEERING JOB WORK |
77 | CHANGE OF STEERING BOX |
78 | CHANGE OF STEERING ROD & STEERING WHEEL |
79 | CHANGE OF POWER STEERING PUMP |
80 | STEERING BOX OVERHALL |
81 | CHANGE OF STEERING CROSS |
82 | BRAKE JOB WORK |
83 | REPAIRING OF AIR PRESSURE HEAD |
84 | CHANGE OF AIR PRESSURE HEAD |
85 | FITTING OF AIR GOVERNOR |
86 | CHANGE OF PRESSURE PIPE |
87 | REPAIR OF D.D. UNIT |
88 | CHANGE OF D.D. UNIT |
89 | BRAKE VALVE REPAIR & FITTING |
90 | ELECTRIC JOB WORK |
91 | SELF STARTER REPAIRING |
92 | ALTERNATOR REPAIRING |
93 | CHANGE OF SELF STARTER |
94 | CHANGE OF ALTERNATOR |
95 | CHANGE OF BATTERY |
96 | HEAD LIGHT FITTING |
97 | FITTING OF ROOF LIGHT |
98 | FITTING OF INDICATORLIGHT |
99 | FITTING OF BACKLIGHT |
100 | FITTING OF HEADLIGHT BULB / ALL WEATHER BULB |
101 | FITTING OF ROOFLIGHT BULB |
102 | FITTING OF BACKLIGHT BULB |
103 | HORN FITTING |
104 | COMPLETE REPAIRING OF WIRING |
105 | WIPER ARM & BLADE FITTING |
106 | CHANGE OF ELECTRIC SWITCH |
107 | CHANGE OF METER LIGHT BULB |
108 | HORN REPAIRING |
109 | BODY JOB WORK |
110 | FRONT WIND SCREEN GLASS FITTING PER GLASS |
111 | SIDE WINDOW GLASS FITTING PER GLASS |
112 | SEAT FITTING PER SEAT |
113 | UPHOLSTERY REPAIR PER INCH |
114 | ELECTRIC WELDING PER INCH |
115 | TUBULAR STRAIGHTEHING & FITTING |
116 | ANGLE STRAIGHTEHING & FITTING |
117 | REPAIRING & FITTING OF BATTERY BOX |
118 | STRAIGHTENING OF CHASIS PER INCH |
119 | CHANGE OF SEAT CUSHION & REXINE PER SEAT |
120 | CHANGE OF MAZDA RUBBER PER WINDOW |
121 | FITTING OF WINDOW CATCHER LOCK PER WINDOW |
122 | FITTING & TIGHTENING OF U BOLT |
123 | FITTING OF WIND SCREEN PER GLASS |
124 | FRONT SHOW REPAIR |
125 | FRONT SHOW GRILL REPAIR |
126 | FRONT WIND SCREEN FRAME REPAIR |
127 | SIDE WINDOW FRAME REPAIR |
128 | PANEL FITTING PER SQ. FEET |
129 | FLOOR REPAIR PER SQ. FEET |
130 | FRIST AID BOX FITTING |
131 | COMPLAINT BOX FITTING |
132 | SEAT REPAIRING (WELDING OR BOLT) |
133 | MUD GUARD REPAIRING |
134 | PASSENGER GATE REPAIRING |
135 | FLOOR REPAIRING |
136 | PAINTING JOB WORK |
137 | PAINTING PER SQ. FIT PLAIN |
138 | LETTER WRITING (1" X 1") |
139 | LETTER WRITING (2" X 1") |
140 | LETTER WRITING (3" X 1") |
141 | LETTER WRITING (4" X 1") |
142 | LETTER WRITING (5" X 1") |
143 | FULL BODY PAINT |
144 | SHOW PAINTING |
145 | NUMBER PLATE WRITING PER PLATE |
146 | DESTINATION BOARD WRITING |
147 | MISCLLANEOUS JOB WORK |
148 | TYRE DISMANTLING & MOUNTING PER TYRE |
149 | PER TYRE PUNCTURE REPAIR |
150 | AIR PRESSURE CHECKING & FILLING PER BUS |
151 | WHEEL ALIGNMENT PER BUS |
152 | TURBO PACKING CHANGE |
153 | EXHAUST MANIFOLD PACKING CHANGE |
154 | DIESEL P.V.C. PIPE CHANGE |
155 | SCILENCER DISMANTLING & FITTING |
156 | FLY WHEEL DISMANTLING & FITTING |
157 | DISMANTLING & FITTING OF BS-4 INJECTORS |
158 | DISMANTLING & FITTING OF COMMON RAIL |
159 | B/D PER PERSON ( FOR MORE THEN 40 K.M.) |
160 | SKILLED LABOUR ( PER PERSON PER DAY) |
161 | LETTER WRITING PER FIT |
162 | ENGINE & PUMP WORK OF BS-6 BUSES |
163 | INJECTOR FITTING AND OPENING |
164 | COMMAN RAIL FITTING AND OPENING |
165 | GST (%) |
166 | Construction of chamber for 100mm sluices valve |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail