New Mangalore Port Trust-NMPT has published Tender For Upgradation Of Local Area Network At New Mangalore Port Authority Campus. Submission Date for this Tender is 15-02-2023. LAN Tenders in Dakshina Kannada Karnataka. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 25-Jan-2023 | Corrigendum_01 | Date | 31-01-2023 |
2 | 31-Jan-2023 | Corrigendum No-2 | Date | 15-02-2023 |
3 | 08-Feb-2023 | Corrigendum No 3 | Technical Bid | 15-02-2023 |
Sl. No. | Item Description |
1 | Core Switch 40 G Back bone( Specification:Refer Technical Sheet) |
2 | Hardware & Interface Requirements |
3 | Internal Redundant Power Supplies and Fans |
4 | Power Cables |
5 | Modules(12p 40G/100G QSFP28 Module) |
6 | Modules(48p 10G/25G SFP28 Module) |
7 | Cable(40G QSFP+ to QSFP+ 3m DAC Cable) |
8 | Cable( 10G SFP+ to SFP+ 3m DAC Cable) |
9 | Warranty - 24X7 WITH 6 CTR( witch should be provided with hardware replacement warranty and ongoing software upgrades for all major and minor releases for a period of Total 3 years.).Quote for 1st Year only |
10 | Additional 4 years warranty / AMC support pack . Quote for 1st Year only |
11 | Distribution Switch 40G & 10 G Support( Specification:Refer Technical Sheet)) |
12 | Hardware & Interface Requirements |
13 | 40G QSFP+ to QSFP+ 3m DAC Cable |
14 | 10G SFP+ to SFP+ 3m DAC Cable |
15 | Warranty - 24X7 WITH 6 CTR. Quote for 1st Year only |
16 | Additional 4 years warranty / AMC support pack . Quote for 1st Year only |
17 | 24 Port Edge Switch( 10 G Support)(Specification Refer Technical Sheet) |
18 | Hardware & Interface Requirements |
19 | Additional 4 years warranty / AMC support pack . Quote for 1st Year only |
20 | Warranty - 24X7 . Quote for 1st Year only |
21 | 48 Port Edge Switch( 10 G Support) (Specification Refer Technical Sheet) |
22 | Hardware & Interface Requirements |
23 | Warranty - 24X7. Quote for 1st Year only |
24 | Additional 4 years warranty / AMC support pack . Quote for 1st Year only |
25 | Transceivers |
26 | 10G SFP+ transceiver, LC LR 10km SMF |
27 | 40G QSFP+ LC LR4 SM Transceiver |
28 | NAC License(On-Prem NAC with minimum 100 user perpetual license from day 1) |
29 | Secure Network Access Control Hardware/VM |
30 | Warranty - 24x7 for NAC (applicable to all clauses of NAC server and licenses). Quote for 1st Year only |
31 | Additional 4 years warranty / AMC support pack . Quote for 1st Year only |
32 | NAC VM License |
33 | Subscription license |
34 | Warranty -24X7. Quote for 1st Year only |
35 | Additional 4 years warranty / AMC support pack . Quote for 1st Year only |
36 | NMS |
37 | Multivendor, on-premises campus network management Systemfor wired Network |
38 | Warranty - NBD(NMS should be provided with software upgrades for all major and minor releases for a period of Total 3 years.). Quote for 1st Year only |
39 | Warranty-24X7( Day One Device License which has to be proposed ). Quote for 1st Year only |
40 | Additional 4 years warranty / AMC support pack . Quote for 1st Year only |
41 | Point to Point Wi-FI Connection |
42 | P2P ( Wi-Fi 6 P2P Access Point - Bridge Mode) |
43 | POE Adapter |
44 | Moutning Pole and Bracket |
45 | Spare Stock |
46 | 48 port Edge Switch |
47 | 24 port Edge Switch |
48 | SFP Module(10G SFP+ transceiver, LC LR 10km SMF) |
49 | Supply, Installation, Testing and Commissioning(ActiveNetwork) |
50 | Supply, Transaporation, Shipment, etc… |
51 | Installation, Testing & Comission |
52 | Training with 3 months onsite support post go-live |
53 | 36months DLP. Quote for 1st Year only |
54 | Passive Network |
55 | Fiber Optic Cable, 12cores-fiber, OS2, loose tube, dry - Outdoor, armoured OFC with LSZH. Single mode, FRP, single drum and Single OEM |
56 | LIU(12F, 1U, LC SM OS2 , Loaded with Pigtails, Splice tray, adapter & splice protectors) |
57 | LIU(24F, 1U, LC SM OS2 , Loaded with Pigtails, Splice tray, adapter & splice protectors) |
58 | Fiber Patch Cord - Single mode 3mtr length |
59 | Patch Panel - Cat 6, 24-port Loaded Modular Straight Jack Panel with labels, clear label covers and rear cable support bar, Height, 1U |
60 | Category 6 U/UTP Cable, low smoke zero halogen, gray jacket, 4 pair count, 1000 ft (305 m) length |
61 | PVC Conduit 30mm |
62 | HDP Conduit 1" |
63 | Case & Capping Patti 1.5" |
64 | Case & Capping Patti 1" |
65 | GI Pipe |
66 | 27U Network Rack |
67 | CAT6 Single I/O Face Plate |
68 | CAT6 Single I/O Face Plate Back Box |
69 | 2Mtr CAT6 UTP Patch Cords |
70 | Supply, Installation, Testing and Commissioning(PassiveNetwork) |
71 | Supply, Transaporation, Shipment, etc… |
72 | Passive cable laying work |
73 | Passive cable termination |
74 | OTDR testing on full network |
75 | Penta testing on full network |
76 | Active Directory - AD |
77 | Windows Server 2022 or latest, down gradable to lower versions. |
78 | Windows Client Access License |
79 | Server - Primary Domain, Secondary Domain, DNS Server |
80 | Server (Warranty - 24X7 WITH 6 CTR). Quote for 1st Year only |
81 | Server -Additional Support / Warranty. Quote for 1st Year only |
82 | Data Storage |
83 | Storage - 25 TB raw, 16 TB useable, expandable to 31.5 TB useable,Gb Ethernet 4 ports standard, 10GbE SFP, 10GbE, |
84 | DLP and Antivirus for Storage Valut |
85 | UPS |
86 | 15 kVA / 15,000 Watt Power Conditioner, Voltage Regulator, & Battery Backup UPS With Built In Isolation Transformer with 3 hours power backup on Full Load - UPS With external Batteries Only,Battery:12V /42Ah or higher |
87 | 1 kVA / 900 Watt Power Conditioner, Voltage Regulator, & Battery Backup UPS |
88 | 2kVAWatt Power Conditioner, Voltage Regulator, & Battery Backup UPS |
89 | UPS -Additional 4 years warranty / AMC support pack (applicable for all clauses of RFP) . Quote for 1st Year only |
90 | Supply, Installation, Testing and Comission(AD &UPS) |
91 | Supply, Transaporation, Shipment, etc… |
92 | Installation, Testing & Comission |
93 | Training with 3 months onsite support post go-live |
94 | 36months DLP. Quote for 1st Year only |
95 | Civil Work By SI (Establishing the connectivity through OFC&UTP) |
96 | Road Cutting, Laying, Redoing Road etc… |
97 | Digging |
98 | Saddling |
99 | HDPE Laying |
100 | OFC Laying |
101 | OFC Termination |
102 | OFC Marking (Cancreate 1X3) |
103 | casing capping / PVC laying |
104 | UTP laying |
105 | I/O termination |
106 | On SiteSupport -7 Years |
107 | Network Administrator - 7 years. Quote for 1st Year only |
108 | Network Support Enginner (Stay in the port premise) - 7 years. Quote for 1st Year only |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail