| 1 | Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the EIC. |
| 2 | Filling foundation and plinth with good coarse sandincluding watering& ramming as directed by the Engineer in charge. |
| 3 | Cement Concrete M10(1:3:6) with 4cm size hard granite metal including cost,conveyance, royality, taxes,watering and curing etc. complete. |
| 4 | Cement concrete ( 1 : 2: 4) using 12 mm size HG CB chipsincuding laying lowering concrete, warteringand curring & cost carriage royalty and taxes of all materials etc. |
| 5 | Supplying and laying of precast interlockfing concrete block of 80mm thickof approved design and filling the joints with sand on the prepared surface including cost of all chargesetc. complete.as per M.O.R.D. specification (6.7) |
| 6 | RCC wok of M-20 grade with 20mm downgraded size hard granite chips including hoisting and layingColumn Base |
| 7 | Column(Ground Floor) |
| 8 | Column(First Floor) |
| 9 | Plinth Beam |
| 10 | Lintel(Ground Floor) |
| 11 | Lintel(First Floor) |
| 12 | Chhaja(Ground Floor) |
| 13 | Chhaja(First Floor) |
| 14 | Shelve(Ground Floor) |
| 15 | Shelve(First Floor) |
| 16 | Roof Beam(Ground Floor) |
| 17 | Roof Beam(First Floor) |
| 18 | Roof Slab(Ground Floor) |
| 19 | Roof Slab(First Floor) |
| 20 | Stair Case(Ground Floor) |
| 21 | Stair Case(First Floor) |
| 22 | Supplying ,fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification.(Ground Floor) |
| 23 | Supplying ,fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification.(First Floor) |
| 24 | Fly Ash brick work with25cm x 12cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±2 percent in cement mortar(1:6) in foundation and plinth per cum.(In foundation) |
| 25 | Fly Ash brick work with25cm x 12cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±2 percent in cement mortar(1:6) in foundation and plinth per cum.(In Superstructure-Ground Floor) |
| 26 | Fly Ash brick work with25cm x 12cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±2 percent in cement mortar(1:6) in foundation and plinth per cum.(In Superstructure-First Floor) |
| 27 | 12 mm thick cement plaster in cement mortar (1:6) out side/face brick walls etc complete.(Ground Floor) |
| 28 | 12 mm thick cement plaster in cement mortar (1:6) out side/face brick walls etc complete.(First Floor) |
| 29 | 16 mm thick cement plaster in CM ( 1: 6) over brick workinside surface of the wall including cost carriage royalty taxes and watering& curring etc. complete(Ground Floor) |
| 30 | 16 mm thick cement plaster in CM ( 1: 6) over brick workinside surface of the wall including cost carriage royalty taxes and watering& curring etc. complete(First Floor) |
| 31 | Supplying, fitting and fixing of M.S. door, window and grill gate ... etc. completeas per direction of Engineer in charge.. (Ground Floor) |
| 32 | Supplying, fitting and fixing of M.S. door, window and grill gate ... etc. completeas per direction of Engineer in charge.. (First Floor) |
| 33 | Supplying, fitting and fixing of M.S.grill for window,ventilator ... etc. completeas per direction of Engineer in charge..(Ground Floor) |
| 34 | Supplying, fitting and fixing of M.S.grill for window,ventilator ... etc. completeas per direction of Engineer in charge.. (First Floor) |
| 35 | Supplying, fitting & fixing of window (siding type made up alminum section 151-154,151-155, as windows frame section No.151-155, 151-153 nad 151-167 as shutter framw with 5mm thcik black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes labour T & P etc complete as per direction of Enginner -in charge.(Ground Floor) |
| 36 | Supplying, fitting & fixing of window (siding type made up alminum section 151-154,151-155, as windows frame section No.151-155, 151-153 nad 151-167 as shutter framw with 5mm thcik black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes labour T & P etc complete as per direction of Enginner -in charge.(First Floor) |
| 37 | Supplying ,fitting ,fixing of stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32x32x2mm @0.90 mtr. C/C and stainless square pipe bracing of size 32x32x2mm in 3 rows in stair case as per approved design and specification, buffing , polishing etc with cost, conveyance, taxes of alll materials, labour, T&P etc required for the coplete in all respect.(Ground Floor) |
| 38 | Supplying ,fitting ,fixing of stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32x32x2mm @0.90 mtr. C/C and stainless square pipe bracing of size 32x32x2mm in 3 rows in stair case as per approved design and specification, buffing , polishing etc with cost, conveyance, taxes of alll materials, labour, T&P etc required for the coplete in all respect.(First Floor) |
| 39 | Fixing tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete excluding cost of precast tiles.( Ceramic Tiles,Ground Floor ) |
| 40 | Fixing tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete excluding cost of precast tiles.( Ceramic Tiles,First Floor ) |
| 41 | Providing and fixing vitrified tiles in floors, treads of steps and landing on 20mm th bed of cement mortar (1:4) (1 cement:4 sand) joined with neat cement slurry mixed with pigment to match the shade of tiles including rubbing, polishing including cost of tiles, conveyance, taxes & labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge(Ground Floor) |
| 42 | Providing and fixing vitrified tiles in floors, treads of steps and landing on 20mm th bed of cement mortar (1:4) (1 cement:4 sand) joined with neat cement slurry mixed with pigment to match the shade of tiles including rubbing, polishing including cost of tiles, conveyance, taxes & labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge (First Floor) |
| 43 | Providing and fixing vitrified tiles in floors, treads of steps and landing on 20mm th bed of cement mortar (1:4) (1 cement:4 sand) joined with neat cement slurry mixed with pigment to match the shade of tiles including rubbing, polishing including cost of tiles, conveyance, taxes & labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge (Ground Floor)300mm x 300mm Vitrified industril floor tiles of premium grade 8mm to 10mm thick |
| 44 | 20mm thick Cement plaster in C.M. (1:4)in grading plaster over roof slab including cost of all labour, materials etc. complete in all respectincluding 1% cess as perdirection of Engineer-in-charge.(Ground Floor) |
| 45 | 20mm thick Cement plaster in C.M. (1:4)in grading plaster over roof slab including cost of all labour, materials etc. complete in all respectincluding 1% cess as perdirection of Engineer-in-charge.(First Floor) |
| 46 | Priming one coat two wall surafce using water bound cement primer including cost, conveyance all materilas, labour and T & P etc complete. |
| 47 | Priming one coat two wall surafce using water bound cement primer including cost, conveyance all materilas, labour and T & P etc complete. |
| 48 | Finishing surface of walls with Acrylic putty (water based) of approved make & finished smooth & even surface to receive painting incluidng cost of materials taxes labour etc. |
| 49 | Finishing surface of walls with Acrylic putty (water based) of approved make & finished smooth & even surface to receive painting incluidng cost of materials taxes labour etc. |
| 50 | Distempering two coats to walls with distemper of approved shade on new work to give an even shade inculding cost of distemper. |
| 51 | Distempering two coats to walls with distemper of approved shade on new work to give an even shade inculding cost of distemper. |
| 52 | Finishing walls with water proofing Weather coat of approved shade on new work two coat over a coat of primer to give an even shade including cost of paint. |
| 53 | Finishing walls with water proofing Weather coat of approved shade on new work two coat over a coat of primer to give an even shade including cost of paint. |
| 54 | Painting two coats with good enamel paint over a coat of primer / red oxide on iron worksincluding cost, conveyance & taxes of all materials, T&P, labour charges etc complete. |
| 55 | Painting two coats with good enamel paint over a coat of primer / red oxide on iron worksincluding cost, conveyance & taxes of all materials, T&P, labour charges etc complete. |