| 1 | Excavating in trenches n.exe. 1.5 m width and n.exe. 1.5 m in depth for foundation in soft/loose soil & getting out. |
| 2 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm complete all as specified and as directed. |
| 3 | Removing excavated material n exc 50 m & depositing where directed at a level n exc 1.5 m complete all as specified and as directed. |
| 4 | M&L for PCC 1:3:6type C-2 (using 40mm graded stone aggregate) as in foundation filling / massconcrete,complete all as specified and directed. |
| 5 | M&L for PCC 1:4:8 type D2 (using 40mm graded stone aggregate) as in foundation, mass concrete, etc complete all as specified and as directed. |
| 6 | S&F for MS work for fencing post and struts made from angle iron and flat iron in any section including cutting tops to shape , drilling holes and notching for fixing of wires etc confirming to Fe -290 or Fe -330, with and incl necessary nut and bolts of 12mm diaof reqd length complete all as specifed and directed |
| 7 | S&F Mild steel Round bars bar Fe-410-W (Gde.E-250) 5 mm dia and over upto and including 10mm dia in strrups as inincluding cutting, bending and binding with mild steel not less than 0.9 mm dia (annealed)complete all as specified and directed. |
| 8 | Supply and fixing mild steel TMT bar 10mm dia and over, cut to length , bend to shape required, including cranking, bending, hooking end etc. including MS wire (annealed) not less than 0.9mm diacomplete all as specified and as directed. |
| 9 | Supply and fixing mild steel TMT bar 5mmdia and over upto and including 10mm dia in stirrups, binders, cut to length, bend to shape required, including cranking, bending, hooking end etc.including MS wire (annealed) not less than 0.9mm dia complete all as specified and as directed. |
| 10 | Fixing only chain link fencing including line wires, any mesh, size and type to any type of standards, rails, straining bolts, etc. including provission of binding wire complete all as specified and directed. |
| 11 | Supply only Chain link MS galvanised fencing, any size or type complete all as specified and as directed. |
| 12 | S&F Galvanised 2 strand, steel barbed wire 2.24mm dia barbed with 2mm dia barbs at 75mm spacings and straining and fixing to any type of standard rails strain- ing bolts, including, securing or tying at crossings with and provision of galvanised mild steel wire, staples or steel pins, etc. complete all as specified and directed. (each line wire to be measured) . |
| 13 | M&L for Painting two coats of synthetic enamel paint over a coat of red oxide primer to new steel Surfaces of any description, not otherwise described, over 10cm width or girth complete all as specified and directed. |
| 14 | M&L for Framed work as in doors or gates of angle or other section with gusset plates, rails, braces, etc., complete, drilled for fixing of steel sheeting or other covering. Doors, etc. to be prepared for hanging or sliding with and including either hooks and hinges or steel hanging door fittings (exclusive of steel sheeting or other covering, running rails and guides) and hanging; also fastening and fixing complete all as specified and directed. |
| 15 | Materials and labour for RCC M-25 (Design Mix) (using 20mm graded stone aggregate) as in foundation, footing of column, plinth beam, etc. complete all as specified and as directed. |
| 16 | Materials and labour for RCC M-25 (Design Mix) (using 20mm graded stone aggregate) as in column, pillars, piers, posts and strutscomplete all as specified and as directed. |
| 17 | Materials and labour for RCC M-25 (Design Mix) (using 20mm graded stone aggregate) as in beams, cantilevers, lintel over 1.5m span or bands complete all as specified and as directed. |
| 18 | Material & labour for formwork to sides of concrete of foundation, footings, plinth beam, etc. with rough finished square/rectangular surfaces of concrete complete all as specified and as directed. |
| 19 | Material & labour for formwork to sides of concrete of columns, pillars, posts with rough finished square/rectangular surfaces of concrete complete all as specified and as directed. |
| 20 | Material & labour for formwork to sides and soffits of concrete of beam, lintels, cantilevers etc. with rough finished square/rectangular surfaces of concrete complete all as specified and as directed. |
| 21 | M&L for burnt brick work with sub class `B\" bricks straight or curved on plan exc 6m mean radius built in cement mortar 1:6, complete all as specified and as directed.. |
| 22 | Material and labour for rendering 15mm thick in cement mortar 1:4 on fair faces of brick wall or concrete surfacescomplete all as specified and as directed. |
| 23 | M&L applying two coat of cement base paint over a coat of cement base primer on newly plastered surfaces of walls including preparation of surfaces complete all as specified and as directed. |
| 24 | Materials and labour for PCC 1:2:4 type B1 (using 20mm graded stone aggregate) as in cills,copings, kneelers, apex stones,bed plates etc complete all as specified and as directed. |
| 25 | S&F Concertina coil fencing with required dia 600mm(Having 50Nos round per 6m length) upto 3m height of wall with existing angle oron \"Y\" shaped placed 3.00m apart and with 9 horizontal RBT stud tied with GI staples and GI Clips to retain horizontal including necessary bolts or GI barbed wire tied to angle iron all complete all as specified and as directed with reinforced barbed tap(RBT)/Spring core(2.5mm thick) wire of high tensile strength of 165Kg/Sqm with tape(0.52mm thick) ant weight not less than 43.478gm/Mtr complete all as specified and as directed. |
| 26 | M&L for running welding in repairs (Thickness of metal to be welded n exc 6mm) complete all as specified as directed. |
| 27 | Demolition of reinforced cement concrete (reinforcement cut as required to facilitate demolition) of any description and in any position not otherwise specifically provided for complete all as specified and as directed. |
| 28 | Demolition of brick work built in cement mortar including all quoins, arches, pillars etc but excluding ashlars facing,dressed stone work and precast concrete articles complete all as specified and directed. |
| 29 | Demolition of cement concrete of any description and in any position not otherwise specifically provided for complete all as specified and as directed. |
| 30 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and directed. |