Power Government Departments Closing in 0 days TDR #35358190

Tender For Deposit Work Village Imaliya Phase-2 Under Edd Mauranipur

Issued by Government Departments · mauranipur, Uttar Pradesh
Tender Value
5.34 Lakhs
Estimated cost
Bid Submission
27 Dec 2022
0 days left
EMD
5345
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
mauranipur → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Deposit Work Village Imaliya Phase-2 Under Edd Mauranipur-2 Carriage Of Line Material From Store Centre Hansari To Work Site To Errection And Commissioning Of 11 Kv Line On Single Pole, Ab Cable Work Includes Fixing, Earthing, Grouting, Laying, Sagging, Strengthing, Binding Of Conductor Andall Work Required To Errect The Line As Per Cost Data Book. 3 Pcc Pole 8.5 Mtr Long 4 Complete Stay Set ( Material Will Be Provided By Department ) . 5 Complete Earthing Rod ( Material Will Be Provided By Department ) . 6 Weasel Conductor ( Material Will Be Provided By Department ) . 7 Abc 3X95 ( Material Will Be Provided By Department ) . 8 Lt Pvc Cable ( 3*150 / 75Sqmm ) 9 Lt Abc ( 1*16+1*25Sqmm ) ( Material Will Be Provided By Department ) . 10 Errection And Commissioning Ofdouble / Tri Suport Pcc Pole 8.5 Mtr. Long, Ab Cable Work Includes Fixing, Earthing, Grouting, Laying, Sagging, Strengthing, Binding Of Conductor Andall Work Required To Errect The Lineand Work Includes Carriage Of All Centralized Required Material And Material Will Be Provided By The Department 11 Double Pole Structure For Pcc Pole 12 Concreating Of Support 13 Concreating Of Stay 14 Extra Pit Digging As Per Site Requirement 15 Fixing Of Distrubution Box On Pole As Per Direction Of Engineer Incharge. 16 Guarding Of 11 Kv Line At Road Crossing & Ht Line Inside Of Village By Laying 02 Nos. G.I. Wire Parallel & Fixing Of Lacing Till At A Distance At 2-3 Meter. As Per Dirction Of Engineer Incharge. 17 Making Of Plinth For Pcc Pole 18 Tree Branch Promming / Cutting 19 Errection And Commissioning Of11 / 0.4 Kva Sub-Station And Material Required For Ht / Lt Metering System On Pcc Pole / Meter Room Incuding All Work Required For Energising The Line And Work Includes Carriage Of All Centralized Required Material And Material Will Be Provided By The Department. 20 100 Kva Transformer. 21 Danger Board ( Provided & Fixing By The Contractor ) 22 Barbed Wire ( Provided & Fixing By The Contractor ) 23 Number Plate ( Provided & Fixing By The Contractor )

AI Tender Summary

OUR REF NO 35358190
AUTHORITY Government Departments
TENDER VALUE 5.34 Lakhs
LAST DATE 27-12-2022
Authority
Authority Name Dakshinanchal Vidyut Vitran Nigam Limited
Work Description Deposit Work Village Imaliya Phase-2 Under Edd Mauranipur-2 Carriage Of Line Material From Store Centre Hansari To Work Site To Errection And Commissioning Of 11 Kv Line On Single Pole, Ab Cable Work Includes Fixing, Earthing, Grouting, Laying, Sagging, Strengthing, Binding Of Conductor Andall Work Required To Errect The Line As Per Cost Data Book. 3 Pcc Pole 8.5 Mtr Long 4 Complete Stay Set ( Material Will Be Provided By Department ) . 5 Complete Earthing Rod ( Material Will Be Provided By Department ) . 6 Weasel Conductor ( Material Will Be Provided By Department ) . 7 Abc 3X95 ( Material Will Be Provided By Department ) . 8 Lt Pvc Cable ( 3*150 / 75Sqmm ) 9 Lt Abc ( 1*16+1*25Sqmm ) ( Material Will Be Provided By Department ) . 10 Errection And Commissioning Ofdouble / Tri Suport Pcc Pole 8.5 Mtr. Long, Ab Cable Work Includes Fixing, Earthing, Grouting, Laying, Sagging, Strengthing, Binding Of Conductor Andall Work Required To Errect The Lineand Work Includes Carriage Of All Centralized Required Material And Material Will Be Provided By The Department 11 Double Pole Structure For Pcc Pole 12 Concreating Of Support 13 Concreating Of Stay 14 Extra Pit Digging As Per Site Requirement 15 Fixing Of Distrubution Box On Pole As Per Direction Of Engineer Incharge. 16 Guarding Of 11 Kv Line At Road Crossing & Ht Line Inside Of Village By Laying 02 Nos. G.I. Wire Parallel & Fixing Of Lacing Till At A Distance At 2-3 Meter. As Per Dirction Of Engineer Incharge. 17 Making Of Plinth For Pcc Pole 18 Tree Branch Promming / Cutting 19 Errection And Commissioning Of11 / 0.4 Kva Sub-Station And Material Required For Ht / Lt Metering System On Pcc Pole / Meter Room Incuding All Work Required For Energising The Line And Work Includes Carriage Of All Centralized Required Material And Material Will Be Provided By The Department. 20 100 Kva Transformer. 21 Danger Board ( Provided & Fixing By The Contractor ) 22 Barbed Wire ( Provided & Fixing By The Contractor ) 23 Number Plate ( Provided & Fixing By The Contractor )
Basic Detail
Tender No 70/EDC/JHS/2022-23
Bidding Type Tender
Location
City mauranipur
State Uttar Pradesh
Key Dates
Publish Date 19 Dec 2022
Submission Date 27 Dec 2022
Open Date 27 Dec 2022
Finance
Tender Value 5.34 Lakhs
Tender Fee 1180
EMD 5345
Exemption Not Available
Document List
f1b01c7f-5849-4f5c-9159-550e2b4236c4.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Dec 19, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 27, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Dec 27, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

f1b01c7f-5849-4f5c-9159-550e2b4236c4.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders