| 1 | Hiring Charges of Hydraulic Excavator (3D) with including the cost of operator and fuel and other expenses complete for a shift of 8 hours (Net) per day. |
| 2 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 3 | Providing & Sprinkling of water as per mitigation measure to control dust pollution as per CPCB guideline at Kaccha road, Kaccha ground by water tanker (capacity 10000 Ltr. ) with sprinkler including the post of driver water, fuel and other operation complete as per direction of Engineer-in-charge. Payment will be made on the basis of GPS photographs only(Note : The item is complete and nothing extra payable on this account) |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of classdesignation 7.5 in foundation and plinth in: a) Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 5 | 12 mm cement plaster of mix :a) 1:6 (1 cement: 6 coarse sand) |
| 6 | 15 mm cement plaster on the rough side of single or half brick wall ofmix :a) 1:6 (1 cement: 6 coarse sand) |
| 7 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinthlevel :a) 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived fromnatural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 8 | Centering and shuttering including strutting, propping etc. and removalof form for :a) Walls (any thickness) including attached pilasters, butteresses,plinth and string courses etc. |
| 9 | Finishing walls with water proofing cement paint of required shade :a) New work (Two or more coats applied @ 3.84 kg/10 sqm) |
| 10 | Steel work welded in built up sections/ framed work, including cutting,hoisting, fixing in position and applying a priming coat of approved steelprimer using structural steel etc. as required.a) In gratings, frames, guard bar, ladder, railings, brackets, gatesand similar works |
| 11 | Total After adding difference of GST factor multiply by @1.0633= 11,97,583.09 |
| 12 | Add: 7% Cost index=83,830.82 |