Name of Work: ADSS Over head work TURNKEY PROJECT For 4g Saturation sites in Sikkim Telecom circle
Sl. No.
Item Description
1
Material Supply At Site
2
Galvanized steel poles of tubularin designand swaged of the length 7 meters, with top cap welded and lightning spike and including MUFF @ 20 per KM average
3
Galvanized steel poles of tubularin designand swaged of the length 8 meters, with top cap welded and lightning spike and including MUFF @ 5 per KM
4
Stay arrangement for 7M/8M Staeel poles @15% of Total poles in Nos.
5
Suspension set @ 20 Nos/KM (in Nos)
6
Tension set (Dend end termination fittings @ 5 Nos/KM in Nos.
7
Adjustable Cable storate Bracket @1Nos.KM (In Nos.)
8
Joint Closure 48 F ADSS (SJC/BJC @ 2 Nos/KM) +10% extra (In Nos.)
9
Services inclusive of all of the following :
10
Erection of 7 m / 8m poles including excavation, fixing of MUFF, concreting, curing, Backfilling, Reinstatement, Compaction of earth, Stay arrangements etc. including obtaining Right-of-Way (RoW) permission and sign writing on poles with paint
11
Slinging / Laying and splicing of ADSS / AOF including fixing of installation accessories and fixtures etc. Splicing & Jointing of Optical Fibre Cable, Link Testing & Acceptance Testing and makeover of route with As Built Diagram (ABD) of installed Cable routes. This also includes cost towards collection of ADSS Cable / AOF Cable and accessories from BSNL’s Store Depot.
12
Optional Requirements
13
Laying of underground OF cable inside PLB Pipe / DWC Pipe, Concreting work on PLB Pipe / DWC Pipesincluding supply of cement, concrete and curing etc., laying and splicing underground OF cable along bridges, culverts etc.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.