Public Administrative Department Local Bodies Closing in 0 days TDR #35346542

Solid Waste Management System At S Xv Work Id 46896717 / 21 22

Issued by Local Bodies · kharia, West Bengal
Tender Value
42.58 Lakhs
Estimated cost
Bid Submission
17 Jan 2023
0 days left
EMD
85175
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
kharia → West Bengal
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Solid Waste Management System At S Xv Work Id 46896717 / 21 22

BOQ

Name of Work: SOILD WAST MANAGEMENT SYSTEM AT S XVNIT NO :WB/JAL/SADAR/02/KGP/22-23
Sl. No. Item Description
1Description of work/ supply materials
2CONSTRUCTION OF OFFICE ROOM , STORE ROOM , TOILET AND TRYCYCLE STANDFOR SOILID WASTE MANAGEMENT PROJECT Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required completeDepth of excavation not exceeding 1,500 mm.
3Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of workWith earth obtained from excavation of foundation
4Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity
5Cement concrete with 30 mm down graded shingles excluding shuttering. N.B. Variety
6Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
7Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) 25 mm to 30 mm shuttering without staging in foundation
825 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
9Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
10Brick work with 1st class bricks in cement mortar (1:6)
11125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor
12Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor
13Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]20 mm thick plaster
1415mm thick plaster
1510 mm thick plaster
16Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.
17Supplying fitting and fixing in position approved P.V.C. door frame (Matt finish) made of extruded P.V.C. multichamber hollow section having dimensions 60mm x 50mm x 2mm (+/-0.2mm), horizontal section will be joined with vertical section by galvanised steel screws after inserting two number steel brackets as reinforcement making suitable space for placing hinges, one steel tube 40mm x 20mm x 1.20 mm will be inserted on one full vertical side of the frame (hinge side) as reinforcement, the frame will then be fixed in the opening with the help of P.V.C. expandable fastner/wooden gutties and galvanised steel screws including cost of all materials and labour, hire charges of tools and appliances, carriage of all materials, taxes and all other incidental charges complete
18Supplying, Fitting & Fixing 30 mm thick Factory made solid Panel PVC Door Shutter consisting of outer frame made out of M.S. tubes of 19 gauge thickness and size 19 mmx19 mm for styles, top and bottom rails, M.S. frame shall have cost of steel primers of approved make and manufacture, M.S. frame covered with 5 mm th. heat moulded PVC “C” channel of size 30 mm th, 70 mm width out of which 50 mm shall be flat and 20 mm shall be tapered in 45 degree angle on either sides forming styles; and 5 mm th. 95 mm wide PVC sheet out of which 75 mm shall be flat and 20 mm tapered in 45 degree on the inner side to form top & bottom rail and 115 mm wide PVC sheet out of which 75mm shall be flat and 20 mm shall be tapered on both sides to form lock rail. Top, bottom and lock rails shall be provided either side of the panel with 10 mm (5 mmx2) th.,20 mm wide cross PVC sheet as gap insert for top rail and bottom rail. Paneling of 5 mm th. both side PVC sheet to be fitted in the M.S. frame welded/sealed to the styles &rails with 7 mm (5 mm+2 mm) th.x15 mm wide PVC sheet beading on inner side and joined together with solvent cement adhesive. An additional 5 mm th. PVC strip of 20 mm which is to be stuck on the interior side of the “C” channel using PVC solvent adhesive etc. complete excluding all necessary hardwares as per direction of Engineer-in-Charge. In ground floor.
19Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer\"s specification and as per direction of the EIC. (In Ground Floor)
20Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer\"s specification and as per direction of the EIC
21Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer\"s specification.
22Construction of septic tank of different capacities as per approved drawing with 1st class brick work in cement mortar (1:4) including two 560 mm dia. R.C.C. manhole cover(heavy type)of approved make supplied, fitted and fixed in the 100mm thick R.C.C (1:1.5:3) top slab with necessary fittings, 20mm thick cement plaster (4 : 1) with neat cement finish to the internal surfaces and 15 mm thick cement plaster (4 : 1) to outside wall upto 200 mm below G.L floor finished with 25 mm thick grey artificial stone over 100 mm thick R.C.C(1:1.5:3) bottom slab including supplying, fitting and fixing all necessry specials, fittings, S.W. tees, C.I. foot rest etc. including excavation earth in all sorts of soil, shoring, bailing out and pumping out water as necessary, ramming, dressing the bed and fefilling the sides of the tanks with earth, removing spoils, filling up the chamber with clear water, removing foreign materials from the chamber and including constructing attached inspection pit as per approved drawing and connecting all necessary pipes, joints etc. with internal plaster work and artificial stone flooring is to be done with admixture of water proofing compound @ 0.5% by weight of cement with all costs of labour and materials. Note:- (i) Finished level of Septic Tank should be 400 mm. from Ground Level. (ii) Height of 50 mm. Ventilation pipe &Mosquito proof mesh, should be follwed as per IS:2470,Part I.Payment will be made separetly on the basis of actual height based on relevant I.S.Code.
23Construction of circular soak well 2.5 metre deep in all types of sandy soils with dry brick work upto 1.6 metre from the bottom having 150 mm intermediate cement brick work (1:4) band all round and cement brick work (1:4) upto 0.90 metre from top with 20mm thick cement plastering (1:4) to inside face upto the depth of cement brick work, 15mm thick cement plaster (1:4) on outer face from top of the well upto G.L. and 6 mm thick cement plaster (1:4) on top of the R.C.C. cover slab including filling bottom 1.00 metre of inside of the well with brick metal (50 mm to 63 mm size) including R.C.C. cover slab of 100 mm thick with cement conc (1:1.5:3) with stone chips with necessary reinforcement and shuttering including one 560 mm dia. R.C.C. manhole cover (heavy type)of approved make supplied, fitted and fixed in the cover slab with necessary fittings, making nacessary arrangements for pipe connections, excavation of well including shoring, dewatering and removing the exess earth from the premises as per direction complete in all respect with all costs of labour and materials. With 250 mm thick dry brick work and 250 mm thick cement brick work (1:6) and 1.00m inside dia.
24M.S. gate of Jail type as per approved design made of strong M.S.frame work, intermediate stiffeners and round / square bars or angles.M.S. sheet (not less than 14 gauge) gussets, cleats etc.including necessary riveting, bolting, welding, locking and hanging arrangements, fitting and fixing complete as per direction of theEngineer-in -charge.
25Supplying 1.5mm thick M.S. sheet fitted and fixed on one or both faces of M.S./ W.I. gate etc. with point welding at not more than 150mm apart complete in all respect as per design including cost of all labour and materials.
26M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-in charge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc.Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereo
27M.S. structural works with hollow sections (square or rectangular shape) conforming to IS: 806-1968 & IS:1161-1998) connected to one another with bracket, gusset, cleat as per design, drawing & direction of Engineer-in-Charge complete including cutting to requisite shape & size, fabrication including metal arc welding conforming to IS: 816-1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of all M.S. Hollow section, all consumables such as electrodes, gas and hire charges of all tools and plants and labour reqired for execution and all incidental chages (such as electricity, labour insurance) etc. complete. Payment to be made on the basis of calculated weight of structural memebrs of MS Holow Section as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finished structural members. The rates are considered for a hight of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereo
28Galvanised corrugated iron sheet work (excluding the supporting frame work) fitted and fixed with 10 mm. dia J or L hook-bolts, limpet and bitumen washers and putty complete with 150 mm. end lap and one corrugation minimum side lap. (Payment to be made on area of finished work)(GCI sheet to be supplied by contractor)
29Supplying, fitting and fixing E.W.C. in white glazed vitreous chinaware of approved make complete in position with necessary bolts, nuts etc.
30Supplying, fitting and fixing bib cock or stop cock
31Supplying, fitting and fixing Flat back urinal (half stall urinal) in white vitreous chinaware of approved make in position with brass screws on 75 mm X 75 mm X 75 mm wooden blocks complete.
32Supplying, fitting and fixing urinal flush pipe fittings of approved brand.
33Supplying, fitting and fixing soap holder
34Supplying, fitting and fixing best quality Indian make mirror 5.5 mm thick with silvering as per I.S.I. specifications supported on fibre glass frame of any colour, frame size 550 mm X 400 mm
35Supplying, fitting and fixing 10 litre P.V.C. low-down cistern conforming to I.S. specification with P.V.C. fittings complete,C.I. brackets including two coats of painting to bracket etc
36Supplying, fitting and fixing CPVC (Chlorinated Polyvinyl Chloride) pipes of approved make conforming to IS-15778: 2007 . with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials 15 mm
3720 mm
38Supplying, fitting and fixing white vitreous china best quality approved make wash basin with C.I. brackets on 75 mm X 75 mm wooden blocks, C.P. waste fittings of 32 mm dia., one approved quality brass C.P. pillar cock of 15 mm dia., C.P. chain with rubber plug of 30 mm dia., approved quality P.V.C. waste pipe with C.P. nut 32 mm dia., 900 mm long approved quality P.V.C. connection pipe with heavy brass C.P. nut including mending good all damages and painting the brackets with two coats of approved pain
39Supplying P.V.C. water storage tank of approved quality with closed top with lid (Black) - Multilayer
40CONSTRUCTION OF FLOOR BASE FOR COMPOSTING AREA- 10m x 10m 100 sqmFilling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
41Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches
42Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes
43Brick work with 1st class bricks in cement mortar (1:6)
44CONSTRUCTION OF BOUNDARY WALL OF SOLID WASTE MANAGEMENT PROJECT AT ,AT INDONG TG VACANT LAND UNDER Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
45Cement concrete with 30mm graded shingles excluding shuttering in ground floor (a) 1:3:6 proportion (B) with NB varity
46Ordinary cement concrete mix (1:1.5:3) with graded stone chips (20mm minimum size) excluding shuttering and reinforcement if any in ground floor as per relevant IS Code (a) River Bazree
47125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor
48Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface], 1:4, 10mm
49Hire charge of shuttering with centering and necessary staging up to 4m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs beams and columns lintels curved straight including fitting fixing and stricking out after complition of work (up to roof of ground floor) (a) 25mm to 30 mm thick hard wooden shuttering asdicision and direction of Eng-in Charge
50Hire charge of shuttering with centering and necessary staging up to 4m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs beams and columns lintels curved straight including fitting fixing and stricking out after complition of work (up to roof of ground floor) (a) 25mm to 30 mm thick hard wooden shuttering asdicision and direction of Eng-in Charge
51Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawingand direction
52White washing including cleaning and somoothening the surface throughly
53Color washing with any shade with stainer including cleaning and somoothening the surface throughly (a) One coat (a) other than yellow pink
54Neat Cement Punning Providing 1.50mm thk neat cement finish
55Fitting Fixing Gate (MS Flat Bars)(a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor.(i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr
56Installation of MS Angle (75mm x 75mm x 6mm
57Installation of Barbet WireSupplying fitting and fixing 600 mm ( ±30 mm) diametre R.B.T(Reinforced Barbed Tape) Concertina fencing on wall top using concertina coils stretched to approx.6 meters length at site clippedwith two nos. of horizontal R.B.T strands which will be tensioned and fixed with the vertical M.S angle iron posts by means ofsecurity fasteners (such as \"C\" clips, R.B.T clips etc
58Earth in filling in foundation trenches and at the back of abutments with good earth (sandy soil) in layers not exceeding 15 cm. including watering and ramming layer by layer complete with earth obtained by fresh excavation from land arranged by Department beyond 150 m. but within 300 m. including all lifts. Earth to be approved by theEngineer-in-charge
59CONSTRUCTION OF COVERED CC DRAIN FOR SWM PROJECTEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as perdirection of the Engineer-in-Charge
60Cement concrete with 30mm graded shingles excluding shuttering in ground floor (a) 1:3:6 proportion (B) with NB varity
61Ordinary cement concrete mix (1:2:4) with graded stone chips (20mm minimum size) excluding shuttering and reinforcement if any in ground floor as per relevant IS Code (a) River Bazree
62Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawingand direction
63Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as perspecification and direction. (a) Where staging is required
64Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface
65Providing 1.50mm thk neat cement finish
66Providing weep hole
67Earth in filling in foundation trenches and at the back of abutments with good earth (sandy soil) in layers not exceeding 15 cm. including watering and ramming layer by layer complete with earth obtained by fresh excavation from land arranged by Department beyond 150 m. but within 300 m. including all lifts. Earth to be approved by theEngineer-in-charge
68Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer IRC febric (75 x 75 mm. mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 metre above GL & 0.75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-in-Charge. (The rate is inclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete
69CONSTRUCTION OF APPROACH ROAD FOR SWM PROJECTEathwork in excavation in borrow pit (land owned/arranged by the deoartment ) 250mm including breaking the clods in embankment work and fillup the back of abutment, deprations, ruts win and 1.5 m making bund. (Land arenge by Dept
70For construction of sub base by compacting RBM (2:1:1) ad cost site of 1.28 m3 of material arrieved at the copmlete rate
71Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts ofminor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. Where staging is not required
72Cement concrete with 30 mm down graded shingles excluding shuttering. N.B. Varietya) 1:3:6 proportion
73Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground flooras per relevant IS codes (ii ) River Bazree
74Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer IRC febric (75 x 75 mm. mesh) and fixed with necessary nuts & bolts on two RC precast posts 100 mm. x 150 mm. of height 2.65 m. of which top 750 mm. is of section 100 x 13 mm. and 1.90 metre above GL & 0.75 metre below GL including digging hole, repacking the same with cement concrete 1:3:6 with jhama khoa or with local stone chips etc. complete including painting two coats on both faces lettering sign marks etc. as per direction of the Engineer-in-Charge. (The rate is inclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete.) ------1 no
75CONSTRUCTION OF TWIN PIT COMPOSTER FOR DE-CENTRALAISED APPROACH AT DIFFERENT LOCATIONEarth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding
76Cement concrete with 30mm graded shingles excluding shuttering in ground floor (a) 1:3:6 proportion
77Hire charge of shuttering with centering and necessary staging up to 4m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs beams and columns lintels curved straight including fitting fixing and stricking out after complition of work (up to roof of ground floor) (a) 25mm to 30 mm thick hard wooden shuttering asdicision and direction of Eng-in Charge
78125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor
79Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface
80Supply of PVC pipes and fittings schedule 80 (medium duty) conforming to ASTM-1785 and treated to match with GI PIPE as per IS-1239
81Lumpsum
82Total pit equal to 1 plus 149 equal to 150 nos
83RIGBORE TUBEWELL WITH PLATFORM FOR SOLID WASTE MANAGEMENT PROJECT Labour for boring through any type of soil for sinking tube well of required dia. with top enlargement by rig boring system (either by reserve circulation or by direct rotary method) including hire charges and labour for rig machine, tools and plants, staging, force pumping set and making arrangement for water required for boring etc. complete and lowering of pipes, strainers, blind pipes etc. completeFor depth upto 250 metre for 150 mm dia. Tube well with top enlargement of 250 mm dia.upto 50 metre
84Next 50 metre
85Supplying, fibre glass reinforced Epoxy resin slotted of 1 mm slot width in 6.1m length of approved make and as per direction of the Engineer - in Charge
86Sypply of E.R.W.M.S.(Electrical Resistant Welded M.S.) black pipe of of TATA make (heavy quality) as per standard specification, 5 mm thick.
87Washing and developing tube well with air compressor pump and engine for 8 (eight) hours continuous pumping per day with necessary arrangements for testing the yield in gallons per hour with \"V\" notch including hire and labour charges for all tools and plants and scaffolding as required
88Labour for making arrangement for showing verticality test including the cost for hire charges of tools and plants, scafolding, labour etc. all complete.
89Collecting sample of water for bacteriological and chemical test from any depth at any time during execution of work including hire and labour charges for tools and plants and sterilising the equipments, paying all charges and fees, testing etc. complete in all respect as per direction.
90Packing the annular space between the outside of the tube well pipes & strainers and the bore with pea size washed gravel of approved quality having size from 2 mm to 5 mm or the size approved by the Engineer-incharge including cost of all materials labour and equipment complete.
91Providing 200 mm centre guide. i) With Clamp
92Supplying, fitting and fixing special hand pump no. 6 of approved make
93Supplying, fitting and fixing 65 mm dia. deep well brass cylinder with necessary fittings and accessories
94Supplying, fitting and fixing 15 mm dia. galv. M.S. connecting rod with sockets
95Supply of G. I. pipes of TATA make including necessary sockets
96Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete
97Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints withlocal sand
98Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor
99Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc
100Display Board and Photography
101CONSTRUCTION OF COMPOSTING UNIT SEGGREGATION UNIT PLACE FOR WATER TUB AND PUMP AND INCINARATOR OF SOLID WASTE MANAGEMENT PROJECTEarth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm
102Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity
103Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used)completes as per direction
104concrete with 30mm graded shingles excluding shuttering in ground floor (a) 1:3:6 proportion (B) with NB varity
105cement concrete mix (1:1.5:3) with graded stone chips (20mm minimum size) excluding shuttering and reinforcement if any in ground floor as per relevant IS Code (a) River Bazree
106thick brick work with 1st class bricks in cement mortar (1:4) in ground floor
107Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface
108Hire charge of shuttering with centering and necessary staging up to 4m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs beams and columns lintels curved straight including fitting fixing and stricking out after complition of work (up to roof of ground floor) (a) 25mm to 30 mm thick hard wooden shuttering asdicision and direction of Eng-in Charge
109Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawingand direction
110White washing including cleaning and somoothening the surface throughly (a) Two coat,
111washing with any shade with stainer including cleaning and somoothening the surface throughly (a) One coat (a) other than yellow pink.
112Artificial stone in floor, dado, staircase etc with cementconcrete (1:2:4)with stone chips, laid in panels as directedwith topping made with ordinary or white cement (asnecessary)and marble dust in proportion (1:2)includingsmooth finishing and rounding off corners including rakingout joints or roughening of concrete surface and applicationof cement slurry before flooring works using cement @ 1.75kg/sq.m all complete including all materials and labour.
113Cement Punning Providing 1.50mm thk neat cement finish
114Fitting Fixing Gate (MS Flat Bars)(a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor.(i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr.
115Square or hexagonal mesh netting made with 18 B.W.G. galvanised wire, fitted and fixed complete as per design (excluding the supporting framework but including local sal wood battens of size 37.5mmx25mm).In ground floor.(c) 37.5mm mesh
116works in framed gratings of window etc.made of round or square bars and frame work or M.S. flats (with the bars securely fixed to the flat bar frame) with or without intermediate flat barstiffener and fixed with necessary screws etc. complete, as directed. (in ground floor)
117structural works in roof trusses with tubular sectionsconforming to IS: 806-1968 & IS: 1161- 1998 cnnected to oneanother with bracket, gusset cleats as per design, direction of Engineer-in-charge complete including cutting to requisite size, fabrication with necessary metal arc welding conforming to IS: 816- 1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection allcomplete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour reqired for the work including all incidental chages such aselectricity charges, labour insurance charges etc.Payment to be made on the basis of calculated weight of structural tubular memebrs as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actualweight of such items with weight of finished structural members. The rates are considered for a height of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof.
118Supplying, fitting & fixing Zn-Al alloy (55% Al & 45% Zn) coating of 150 grams per sq. metre (followed by colour coated on both side) steel sheet work having minimum yield strength of 550 Mpa of trapizoidal profile of approved make(excluding the supporting frame work) fitted and fixed with 55 mm & 25 mm self tapping screw, EPDM Washer 16 mm dia & 3 mm th. washer etc. complete with 150 mm end lap and one corrugation minimum side lap. (Payment to be made on area of finished work
119Aluminium sheet ridging fitted with self tapping screws,EPDM washers etc complete.(Minimum 225mm end lapping).(A) 300 mm lapping each way(a) With 0.71 mm sheet
120Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sandpapering etc
121Construction of circular soak well 2.5 metre deep in all types of sandy soils with dry brick work upto 1.6 metre from the bottom having 150 mm intermediate cement brick work (1:4) band all round and cement brick work (1:4) upto 0.90 metre from top with 20mm thick cement plastering (1:4) to inside face upto the depth of cement brick work, 15mm thick cement plaster (1:4) on outer face from top of the well upto G.L. and 6 mm thick cement plaster (1:4) on top of the R.C.C. cover slab including filling bottom 1.00 metre of inside of the well with brick metal (50 mm to 63 mm size) including R.C.C. cover slab of 100 mm thick with cement conc (1:1.5:3) with stone chips with necessary reinforcement and shuttering including one 560 mm dia. R.C.C. manhole cover (heavy type)of approved make supplied, fitted and fixed in the cover slab with necessary fittings, making nacessary arrangements for pipe connections,excavation of well including shoring, dewatering and removing the exess earth from the premises as per direction complete in all respect with all costs of labour and materials. With 250 mm thick dry brick work and 250 mm thick cement brick work (1:6) and 1.00m inside dia
122ADD GST 18 %
123ADD CESS 1 %

AI Tender Summary

OUR REF NO 35346542
AUTHORITY Local Bodies
TENDER VALUE 42.58 Lakhs
LAST DATE 17-01-2023
Authority
Authority Name Zilla Parishad
Work Description Solid Waste Management System At S Xv Work Id 46896717 / 21 22
Basic Detail
Tender No WB/JAL/SADAR/ KGP/02/22-23
Bidding Type Tender
Location
City kharia
State West Bengal
Key Dates
Publish Date 19 Dec 2022
Submission Date 17 Jan 2023
Open Date 24 Jan 2023
Finance
Tender Value 42.58 Lakhs
Tender Fee Ref. Documents
EMD 85175
Exemption Not Available
Document List
51695762-96f0-492e-a825-022c1896d948.html
BOQ_863231.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Dec 19, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Jan 17, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jan 24, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

51695762-96f0-492e-a825-022c1896d948.html

xls

BOQ_863231.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders