Tender For Work Of Repairing Of Different Size Pipeline And Removing Illegal Connection At Rural Water Supply Scheme Mahwa Under Sub Division Mahwa
Tender Value
Ref. Documents
Estimated cost
Bid Submission
23 Dec 2022
0 days left
EMD
8000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
mahwa → Rajasthan
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Work Of Repairing Of Different Size Pipeline And Removing Illegal Connection At Rural Water Supply Scheme Mahwa Under Sub Division Mahwa
BOQ
| Sl. No. | Item Description |
| 1 | Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe lineup to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) |
| 2 | In all type Soil AC/PVC/HDPE pipe |
| 3 | 50/63/75mm |
| 4 | 80/90mm |
| 5 | 100/110mm |
| 6 | 125/140mm |
| 7 | 150/160/180mm |
| 8 | 200/225mm |
| 9 | 250/280mm |
| 10 | 300/315mm |
| 11 | 350mm |
| 12 | 500mm |
| 13 | Add 5% on above item no. 1.1.1 for B.T. Road |
| 14 | Add 10% on above item no. 1.1.1 for C.C. Road |
| 15 | Add 20% on above no. 1.1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 16 | Add 30% on above no. 1.1.1 item if depth of pipeline is above3.0 mtr. |
| 17 | Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) |
| 18 | In all type Soil |
| 19 | 80mm |
| 20 | 100mm |
| 21 | 125mm |
| 22 | 150mm |
| 23 | 200mm |
| 24 | 250mm |
| 25 | 300mm |
| 26 | 350mm |
| 27 | 400mm |
| 28 | Add 5% on above item no. 1.2.1 for B.T. Road |
| 29 | Add 10% on above item no. 1.2.1 for C.C. Road |
| 30 | Add 20% on above no. 1.2.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 31 | Add 30% on above no. 1.2.1 item if depth of pipeline is above3.0 mtr. |
| 32 | Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) |
| 33 | In all type Soil |
| 34 | 50/63/75mm |
| 35 | 80/90mm |
| 36 | 100/110mm |
| 37 | 125/140mm |
| 38 | 150/160/180mm |
| 39 | 200/225mm |
| 40 | 250/280mm |
| 41 | 300/315mm |
| 42 | 350mm |
| 43 | 400mm |
| 44 | Add 5% on above item no. 1.3.1 for B.T. Road |
| 45 | Add 10% on above item no. 1.3.1 for C.C. Road |
| 46 | Add 20% on above no. 1.3.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 47 | Add 30% on above no. 1.3.1 item if depth of pipeline is above3.0 mtr. |
| 48 | Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) |
| 49 | In all type Soil |
| 50 | 80 mm |
| 51 | 100 mm |
| 52 | 125 mm |
| 53 | 150 mm |
| 54 | 200 mm |
| 55 | 250 mm |
| 56 | 300 mm |
| 57 | 350 mm |
| 58 | 400 mm |
| 59 | Add on above item no. 1.4.1 for B.T. Road |
| 60 | Add 10% on above item no. 1.4.1 for CC Road |
| 61 | Add 20% on above item no. 1.4.1 if depth of pipe line is above 1.5 mtr to 3.0 mtr |
| 62 | Deduct 20% on above item no. 1.4.1 if valve is fixed at plinth level / platform i.e. no excavation is required |
| 63 | Removal of Choking from pipe line, including tree roots, malba, sand and otherby manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. |
| 64 | In all type Soil |
| 65 | 75 mm |
| 66 | 90/80 mm |
| 67 | 110/100 mm |
| 68 | 140/125 mm |
| 69 | 180/160/150 mm |
| 70 | 225/200 mm |
| 71 | 250 mm |
| 72 | 300 mm |
| 73 | Add 5% on above item no. 1.5.1 for B.T. Road |
| 74 | Add 10% on above item no. 1.5.1 for CC Road |
| 75 | Add 20% on above item no. 1.5.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 76 | Add 30% on above item no. 1.5.1 if depth of pipe line is above3.0 mtr. |
| 77 | Removal of Choking from pipe line, including tree roots, malba, sand and otherby manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. |
| 78 | In all type Soil |
| 79 | 80 mm |
| 80 | 100 mm |
| 81 | 125 mm |
| 82 | 150 mm |
| 83 | 225/200 mm |
| 84 | 250 mm |
| 85 | 300 mm |
| 86 | Add 5% on above item no. 1.6.1 for B.T. Road |
| 87 | Add 10% on above item no. 1.6.1 for CC Road |
| 88 | Add 20% on above item no. 1.6.1 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. |
| 89 | Add 30% on above item no. 1.6.1 if depth of pipe line is above 3.0 mtr |
| 90 | Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour. |
| 91 | Add 5% on above item no. 1.7 for B.T. Road |
| 92 | Add 10% on above item no. 1.7 for CC Road |
| 93 | Add 20% on above item no. 1.7 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 94 | Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost) |
| 95 | In all type Soil |
| 96 | 80 mm dia pipe to 100mm |
| 97 | 125 mm dia pipe to 150mm |
| 98 | 200 mm dia pipe to 250mm |
| 99 | 300 mm dia pipe to 350mm |
| 100 | 400 mm |
| 101 | Add 5% on above item no. 1.8.1 for B.T. Road |
| 102 | Add 10% on above item no. 1.8.1 for CC Road |
| 103 | Add 20% on above item no. 1.8.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 104 | Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). |
| 105 | In all type Soil |
| 106 | 80 mm to 110 mm |
| 107 | 125 mm to 165 mm |
| 108 | 200 mm to 300 mm |
| 109 | Add 5% on above item no. 1.9.1 for B.T. Road |
| 110 | Add 10% on above item no 1.9.1 for CC Road |
| 111 | Add 20% on above item no. 1.9.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 112 | Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). |
| 113 | In all type Soil |
| 114 | 80 mm to 100 mm |
| 115 | 125 mm to 150 mm |
| 116 | 200 mm to 300 mm |
| 117 | 350 mm to 450 mm |
| 118 | 500 mm to 600 mm |
| 119 | Add 5% on above item no. 1.10.1 for B.T. Road |
| 120 | Add 10% on above item no.1.10.1 for CC Road |
| 121 | Add 20% on above item no.1.10.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 122 | Labour charges for removal of complaint of polluted water supply to the consumers |
| 123 | Survey of the locality of polluted water supply for preliminary assessment of source of pollution during supply hours |
| 124 | Labour charges for digging of pit of suitable size for removal of water pollutiononexisting distribution AC/PVC/uPVC/HDPE pipe linesup to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line byfixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size |
| 125 | In all type Soil |
| 126 | 50 to 75 mm |
| 127 | 80-110 mm |
| 128 | 125 to 165 mm |
| 129 | 200 to 300 mm |
| 130 | 350 to 450 mm |
| 131 | Add 5% on above item no. 1.12.1 for B.T. Road |
| 132 | Add 10% on above item no.1.12.1 for CC Road |
| 133 | Add 20% on above item no. 1.12.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 134 | Labour charges for digging of pit of suitable size for removal of water pollution onexisting distribution CI/DI/MS pipe linesup to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault pipe line byfixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size |
| 135 | In all type Soil |
| 136 | 80-100 mm |
| 137 | 125 to 150 mm |
| 138 | 200 to 300 mm |
| 139 | 350 to 450 mm |
| 140 | Add 5% on above item 1.13.1 for B.T. Road |
| 141 | Add 10% on above item no. 1.13.1 for CC Road |
| 142 | Add 20% on above item no.1.13.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 143 | Restoration of bitumen road by patch work of WBM using crushed / broken aggregate as per the standard specification and consolidation with hand rammer spreading and consolidation of binding material , cleaning of surface of WBM and providing of seal &tack coat as per site condition by using ready cold mixup to the satisfaction of engineer in charge.The rate includes the makingof pit in regular shape, all labour, material and T&P charge complete job. |
| 144 | Restoration of cement concreteroad including making of pit in regular shape, ramming and consolidation of surface, laying, positioning and compactingcement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction ofengineer incharge.The rate includes the makingof pit in regular shape, all labour, material and T&P charge complete job. |
AI Tender Summary
Tender Timeline
Dec 17, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedDec 23, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedDec 26, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender