Tender For Rejuvation Of Thulasan Kuttai Bund Strengthening, Inlet Channal And Outlet Channal Desilting (50M) And Weir Construction Hume Pipe 1M Dia(7M Length) In Upparapatti H/O Upparapattiestimate Amount : 9.568 Lakhs2.Rejuvation Of Manthoppu Kuttai Des, uthangarai-Tamil Nadu

Rural Development And Panchayats Department has published Tender For Rejuvation Of Thulasan Kuttai Bund Strengthening, Inlet Channal And Outlet Channal Desilting (50M) And Weir Construction Hume Pipe 1M Dia(7M Length) In Upparapatti H/O Upparapattiestimate Amount : 9.568 Lakhs2.Rejuvation Of Manthoppu Kuttai Des. Submission Date for this Tender is 22-12-2022. Securing and Protecting Supplies Tenders in uthangarai Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

35309453
Tender For Rejuvation Of Thulasan Kuttai Bund Strengthening, Inlet Channal And Outlet Channal Desilting (50M) And Weir Construction Hume Pipe 1M Dia(7M Length) In Upparapatti H/O Upparapattiestimate Amount : 9.568 Lakhs2.Rejuvation Of Manthoppu Kuttai Des
Open Tender
Indian
Tamil Nadu
uthangarai
22-12-2022

Tender Details

Rejuvation Of Thulasan Kuttai Bund Strengthening, Inlet Channal And Outlet Channal Desilting ( 50M ) And Weir Construction Hume Pipe 1M Dia ( 7M Length ) In Upparapatti H / O Upparapattiestimate Amount : 9.568 Lakhs2.Rejuvation Of Manthoppu Kuttai Desilting Bund Strengthening, Inlet Channal And Outlet Channal Desilting ( 300M ) And Revetment Construction ( 18M Length ) In Upparapatti H / O Upparapattiestimate Amount : 6.285 Lakhs 3.Construction Of Vertical Filter Near Puliyanthoppu Marimuthu House At Chinnakunnathur Villageh / O Upparapatti Estimate Amount : 1.40 Lakhs 4. Providing Green Net And Fencing ( 500M ) To Additional Block Nursery At Upparapatti Village H / O Upparapatti Estimate Amount : 3.10 Lakhs 5.Providing Fencing To Additional Moringa Nursery At Umaiyanur Village ( 80M ) H / O Upparapattiestimate Amount : 0.780 Lakhstotal Cost: 21.133 Lakhs

Key Value

Document Fees
Refer document
EMD
INR 22000.0 /-
Tender Value
INR 21.13 Lakhs /-

BOQ Items

Name Of Work: 1.Rejuvation of Thulasan kuttai Bund Strengthening, inlet channal and outlet channal desilting (50m) and weir construction hume pipe 1m dia(7m length) in Upparapatti H/o UpparapattiEstimate Amount : 9.568 Lakhs 2.Rejuvation of Manthoppu kuttai Desilting Bund Strengthening, inlet channal and outlet channal desilting (300m) and Revetment construction (18m length) in Upparapatti H/o UpparapattiEstimate Amount : 6.285 Lakhs 3.Construction of Vertical filter near puliyanthoppu marimuthu house at chinnakunnathur villageH/o Upparapatti Estimate Amount : 1.40 Lakhs 4. Providing Green net and Fencing (500M) to additional block Nursery at Upparapatti Village H/o Upparapatti Estimate Amount : 3.10 Lakhs 5.Providing fencing to additional moringa nursery at Umaiyanur village (80m) H/o UpparapattiEstimate Amount : 0.780 Lakhs Total Cost: 21.133 Lakhs
Sl. No. Item Description
11.Rejuvation of Thulasan kuttai Bund Strengthening, inlet channal and outlet channal desilting (50m) and weir construction hume pipe 1m dia(7m length) in Upparapatti H/o UpparapattiEstimate Amount : 9.568 Lakhs
2Earth work in all soils expect hard rock requring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinery and tippers including benching , formation of bunds, breaking of clods sectioning etc complete.
3Earth work deploying earth moving machinery for desilting channal and forming bund on either side and deposiying the earth on banks including jungle clearance etc complete.
4Provision for writing Name board
52.Rejuvation of Manthoppu kuttai Desilting Bund Strengthening, inlet channal and outlet channal desilting (300m) and Revetment construction (18m length) in Upparapatti H/o UpparapattiEstimate Amount : 6.285 Lakhs
6Earth work in all soils expect hard rock requring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinery and tippers including benching , formation of bunds, breaking of clods sectioning etc complete.
7Earth work deploying earth moving machinery for desilting channal and forming bund on either side and deposiying the earth on banks including jungle clearance etc complete.
8Gravel packing for revetment works etc complete complying with standard specifications
9Roughstone dry packing forapron and revetmentusing new roughstone including stacking them etc complete
10Provision for writing Name board
113.Construction of Vertical filter near puliyanthoppu marimuthu house at chinnakunnathur villageH/o Upparapatti Estimate Amount : 1.40 Lakhs
12Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete
13Inspection Chamber
14Drain
15Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers
16Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oakjoists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid .
17Cement Concrete 1:3:6 (One Cement, ThreeM.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, ThreeM.Sand and Six hard broken stone jelly).Dummy columns should be at least 1 metre height)
18Plastering with Cement Mortar 1:4(One cement and Five M.Sand), 20mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
19Brick work using country bricks of size 83/4"x41/4"x23/4"in cement mortar 1:5 (One cement and fiveM.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
20Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
21Supply and Filling of Rough stone from Approved Qurry including all labour charge
22Supply and Filling of 40 mm Metal from Approved Qurry including Cost and Conveyance
23Supply and Fixing of RCC 1.00 dia Ring Thickness of 0.05m including cost and conveyance
24RCC ring
25Cover Slab
26Supply and Fixing of 0.60x0.60m Vertical Filter steel Fabrication including cost and Conveyance
27Supply and Filling of 20 mm Metal from Approved Qurry including Cost and Conveyance
28Supply and Filling ofChar Coal including all labour charges
29Supply and Filling of 20 mm Brick jelly from Approved Qurry including Cost and Conveyance
30supplying and fixing of 110mm dia 6kscpvc pipe including all cost and conveyance etc., all complete
31Colour Wash Two Coat with App. Colour pigment including all cost and conveyance etc., all complete
32Collection and supply ofwellgravel from approved quarry including cost and conveyance of all meterials to site including all labour charges for spreading and levelling to required profile
33Provision for writing Name board
344. Providing Green net and Fencing (500M) to additional block Nursery at Upparapatti Village H/o Upparapatti Estimate Amount : 3.10 Lakhs
35Supply and cost of Stone post of Size 0.230x0.350x3.00 including cost and conveyance etc.., complete
36Supply and cost of Shade net for sides from approved dealer including cost and conveyanece etc.. Complete SOR S.NO 79
37Shade net for Sides
38Shade net for Top
39Labour charges for Errection of Stone Poles andfixing charges for Shade net .
40Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
41Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundationincluding dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
42Plain Cement Concrete 1:2:4 (one cement, twoM.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
43Supply and erection of centering for sides and soffits including all labour charge
44Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification.
45Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc
46Supply and fixing of barbed wire including all cost and conveyance etc all complete
47Provision for grill gate including all costand all labour charges
48Provision for writing Name board
495.Providing fencing to additional moringa nursery at Umaiyanur village (80m) H/o UpparapattiEstimate Amount : 0.780 Lakhs
50Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete
51Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers
52Cement concrete 1:2:4 Using 20mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers .
53Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oakjoists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
54Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification.(MS
55Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
56Colour Wash Two Coat with App. Colour pigment including all cost and conveyance etc., all complete
57Supply and fixing of barbed wire including all cost and conveyance etc all complete
58Provision for erection charges for precast concrete vertical post including all charges
59Provision for grill gate including all costand all labour charges
60Provision for writing Name board
61GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail