Tender For Dry Docking Of Fact Barge Pragatiyan-2023, ernakulam-Kerala

Fertilisers And Chemicals Travancore Limited has published Tender For Dry Docking Of Fact Barge Pragatiyan-2023. Submission Date for this Tender is 12-01-2023. Rough Finishing Tools Tenders in ernakulam Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

35299246
Corrigendum : Tender For Dry Docking Of Fact Barge Pragatiyan-2023
Open Tender
Indian
Kerala
ernakulam
12-01-2023

Tender Details

Tender For Dry Docking Of Fact Barge Pragatiyan-2023 -Preparation of docking plan for the Pragatiyan barge. 2 Item Code : 02To & Fro Transportation of Pragatiyan barge from Q10 Berth, Willingdon Island to Xontractors Yard.Crew required for the navigation of the barge is under the scope of contractor. 3 Item Code: 03Dry Docking of Pragatiyan barge as per the approved docking plan 4 Item Code 04:Dock Hire Charges of the Yard. 5 Item Code 05:Wharfage Charges of the Yard. 6 Item Code 06:Undocking of Pragatiyan barge from contractors yard after the completion of the repair works. 7 Item Code 07:Shore Power Supply- 3 Phase, 415 V,50Hz. 8 Item Code 08:Emptying Diesel & Oil tanks in the barge. Providing closed containers and space in the yard for storing the drained diesel & oil from the tanks in the barge. Refilling diesel to the barge after completion of the repair works.Note : Entire materials & manpower required for the emptying, storing & refilling of Diesel & Oil tanks in the barge are under the scope of contractor. 9 Item Code 09:High pressure water jet cleaning of barge afterdry docking:All accessible spaces of the barge shall be cleaned by using high pressure water cleaning. External surfaces shall be free of dirt, marine growths, barnacles etc..Sludge,muck,debris & mud in ballast tanks, bilge, cargo area, sea chest, fresh water tanks,fuel Tanks, store Area etc.. shall be cleared and disposed off to shoreNote: Entire materials & manpower required for cleaning of the barge are under the scope of contractor. 10 Item Code 10:Gas free certification of the diesel tanks by Yard. 11 Item Code 11:Performing Ultrasound Thickness Gauging (UTG) at areas recommended by the surveyor. Rate to be quoted per point gauging by Ultrasound thickness guage.Note: Entire materials, equipment(Ultrasound thickness guage) & manpower required for performing the thickness measurement are under the scope of contractor. 12 Item Code 12:Steel Plate Renewal-Steel Plate renewal includes replacement of associated beams, channels, angles, stiffeners etc.. connected to the plates.Areas that are marked by Classification society/KIV/FACT for steel renewal shall be repaired by Contractor. All material used for the steel renewal works shall be confirming to IRS Grade A. Only welders who have qualified the WQT shall be assigned for the repair works.NDT tests like RT,UT,DP,MPI etc.. if required after the carrying out the repair works shall be under the scope of contractor.Note: Entire materials & manpower required for the steel plate renewal works of the barge are under the scope of contractor. 13 Item Code 13:Renewal of Anodes:All Type A ( 8 kg) zinc anodes on the barge shall be replaced. Replaced anodes shall be of class approved and shall contain zinc content of atleast 98%.Note: Entire materials & manpower required for replacing Type A zinc anodes are under scope of contractor. 14 Item Code 14:Renewal of Anodes:All Type B ( 5 kg) zinc anodes on the barge shall be replaced. Replaced anodes shall be of class approvedand shall contain zinc content of atleast 98%.Note: Entire materials & manpower required for replacing Type B zinc anodes are under scope of contractor. 15 Item Code 15:Renewal of Anodes:All Type C ( 3 kg) zinc anodes on the barge shall be replaced. Replaced anodes shall be of class approvedand shall contain zinc content of atleast 98%.Note: Entire materials & manpower required for replacing Type C zinc anodes are under scope of contractor. 16 Item Code 16:Replacement of damaged D type hollow fenders (Base : 150 mm x 150 mm) on the Barge. Damaged Fasteners of D tpe hollow fenders shall also be replaced by contractor.Note: Entire materials & manpower required for the replacement of D-fender are under the scope of contractor. 17 Item Code 17:Fore peak space cleaning:Fore peak space shall be cleaned and made ready for Classification agency/KIV Inspection.Sludge,muck,debris & mud in the fore peak space shall be cleared and disposed off to shoreNote: Entire materials & manpower required for the cleaning of Fore peak space shall be under the scope of contractor. 18 Item Code 18:Cargo hold cleaning:Cargo hold shall be cleaned and made ready for Classification agency/KIV Inspection.Sludge,muck,debris & mud in the cargo hold shall be cleared and disposed off to shore.Note: Entire materials & manpower required for the cleaning of cargo hold space shall be under the scope of contractor. 19 Item Code 19:Ballast Tank Cleaning:Ballast Tanks shall be cleaned and made ready for the Classification agency/KIV Inspection.Sludge, muck, debris & mud in ballast tanks shall be cleared and disposed off to shore.Note:Note: Entire materials & manpower required for the cleaning of Ballast Tanks shall be under the scope of contractor. 20 Item Code 20:Chain Locker & Store space cleaning-Chain Locker & Store spaceshall be cleaned and made ready for Classification agency/KIV inspectionSludge,muck,debris, oil, grease & mud in the chain locker & Store space shall be cleaned & disposed off to shore.Note: Entire materials & manpower required for the cleaning of Chain Locker & Store space shall be under the scope of contractor. 21 Item Code21:Fresh water Tanks Cleaning-Fresh water tanks shall be cleaned and made ready for Classification agency/KIV Inspection.Sludge,muck,debris and mud in fresh water tanks shall be cleared & disposed off to shore.Note: Entire materials & manpower required for the cleaning of fresh water tanks shall be under the scope of contractor. 22 Item Code 22:Fuel Oil Tanks Cleaning:Fuel oil tanks shall be cleaned and made ready for Classification agency/KIV Inspection.Sludge & muck in the fuel oil tanks shall be cleared & disposed off to shore.Note: Entire materials & manpower required for the cleaning of fuel oil tanks shall be under the scope of contractor. 23 Item Code 23Sea Chest:Sea Chest to be opened and cleaned. Mud, muck & Sludge to be removed from the sea chest and disposed ashore. Gratings to be inspected and cleaned. All fasteners of the gratings to be replaced.Note: Entire materials & manpower required for the cleaning & repair works in Sea Chest shall be under the scope of contractor. 24 Item Code 24:Supplyof starboard & port side propellersas per drg No. VM/FEW/001 Material of Construction: Mn Bronze Gr.Cu 1.Propellers supplied shall be of class approved. 25 Item Code 25:Propeller-Removal of existing propellers of the barge from the propeller shaft.Repalcing it with the new propellers. New propellers shall be of class approved.Fastners & Gaskets used in the hub and sealing flange to be replaced with new ones.Note: Entire materials and manpower required for the replacement of the propellers are under scope of contractor. 26 Item Code 26:Propeller Shafts:Propeller shafts to be removed from the stern tube. Entire shaft surface shall be DP tested to check whether any surface cracks or abrasion marks or striations are present. If cracks or striations are found, these shall be suitably repaired by welding.Deflection of the shafts to be measured and confirmed within limits. If not, bend correction to be done.Threaded portion and keyways on shaft to be inspected.Any damages on these portions to be repaired.Aft & Forward bearing of the propeller shafts to be replaced with new one prior to fixing of the shaft. New bearings shall be of class approved.Rope guards on the shaft shall be checked for any damages. Damages,if any, shall be repaired.All fasteners to be replaced with new ones. Entire fasteners used for fixing the key, bearings, Gland Follower, Rope guard & Stub shaft shall be of new ones and confirming to specifications mentionedin Drg No: VM/FEW/001/301. Balancing of the propellers are to be done prior to fixing of the shafts.Note: Entire materials and manpower required for the repair works( as mentioned above) in propeller shaft are under the scope of contractor. 27 Item Code 27Rudder: Rudder Blade, Rudder Stock & Tillershall be completely removed and inspected.Rudder Blade coupling bolts to be replaced.Any damages on the rudder blade shall be rectified.Entire surface of the rudder stock shall be DP tested to check whether any surface cracks or abrasion marks or striations are present. If cracks or abrasion marks or striations are found, these shall be suitably repaired by welding.Deflection of the rudder stock to be measured and confirmed within limits. If not, bend correction and of the shaftsto be done.Threaded portion and keyways on rudder stock to be inspected. Any damages on these portions shall berepaired.Upper & Lower bearing of the rudder stock shall be replaced. Bearing housing located at both upper and lower side shall be checked for any damages. Damages, if any, shall be repaired.Tiller & Tiller Rod shall be inspected for any damages. Any damages found shall be suitable repaired.All fasteners to be replaced with new ones. Fasteners replaced shall be confirming to the specifications mentioned in Drg no.VM/FEW/001/208 & VM/FEW/001/208ANote: Entire materials & manpower required for the repair works (as mentioned above) of the rudder, rudder stock & tiller are under the scope of contractor. 28 Item Code 28:Steering System:Hydraulic Lines of the steering system shall be checked for any leakages and damages. If any damages are found in the hydralic lines, same shall be replaced with new ones of same pressure rating.Leakages, if any , at coupling ends of line shall be arrested.Hydraulic cylinder for actuating the rudders shall be overhauled.All seals ( Piston seals, Piston rod seals, Cushion seals, Cylinder Head seals etc..) & wear strips/rings shall be replaced. Piston rod, Piston, tie-rods, Barrel & Heads shall be inspected for any damages.Directional control valves/Servo valves /relief valves in the steering system to be inspected & Overhauled. O-rings in directional control valves/Servo valves to be changed. Solenoids of the valves to be checked for the actuation. Solenoids to be replaced if actuation of the spool is not done properly. Valve seats in the relief valves to replaced and pressure tested to the required pressure.Hydraulic Pumpto be removed from Port side engine drive and overhauled. Seals & bearings in the helm pump & engine driven hydraulic pump shall be replaced with new ones.Fresh Hydraulic oil to be filled in the lines and steering fluid tank by the contractor after carrying out required maintenance works.Note: Entire materials and manpower required for the overhauling works(as mentioned above) of the steering system are under the scope of contractor. 29 Item Code 29:Electrical System:Main switch board, all junction box circuit breakers, control panels ofequipment on deck, wheel house and engine room to be thoroughly examined.Damaged cables to be repaired and replaced. Payment for the cables procured shall be paid extra against the document evidence. Safetymeasures in the electrical system like overload trip, reverse current trip, low voltage trip and interlock between the breaker are to be shown to the surveyor.Note: Entire materials and manpower required for the inspection, repair works(as mentioned above) & testing of the electrical system are under the scope of contractor. 30 Item Code 30:Inspection & testing of fire sensors/alarm, Smoke sensor &bilgesensor/alarm:The sensors and alarms shall be inspected for proper working condition. If sensons/alarms are found to be not operating, same shall be repaired or replaced with with new ones. Contractor shall arrange the new sensors/alarms, if needed to be replaced based on the recommendation from classification agency. Payment for the procurement of the sensors/alarm shall be paid extra against the document evidence.Note: Entire materials and manpower required for the inspection, repair works(as mentioned above) & testing of the sensors/alarm are under the scope of contractor. 31 Item Code 31:Anchor :Anchor and anchor chain shall be thoroughly cleaned by chipping and scrapping. Swivels, shackles,stud links & open links of the anchor chain shall be inspected for the damages.All moving components of the anchor to be freed and anchor to be painted with 2 coats of bismatic paint.Note: Entire materials and manpower required for the repair works of anchor and anchor chains (as mentioned above) are under the scope of contractor. 32 Item Code 32:Windlass:Windlass shall be completely dismantled and overhauled. All bearings & pins shall be lubricated. All brake linings & clutches plates to be inspected for any damages. Any damaged bearings, brake lining & clutch plates shall be replaced as per the recommendation of the Classification agency/KIV/FACT. Payment for the replaced items shall be paid extra against the document evidence.Note: Entire materials and manpower required for the overhauling works (as mentioned above) of windlass are under the scope of contractor. 33 Item Code: 33150 NB,ASTM SCH40, Seamless/MS Class C -ERW pipesRemoval of damaged piping, erection of new piping & hydrotesting of replaced portion.Note: Entire materials & manpower required for the replacement of 150 NB pipe ( as mentioned above) are under the scope of contractor. 34 Item Code: 34100 NB, MS -GalvanisedRemoval of damaged piping, erection of new piping & hydrotesting of replaced portion.Note: Entire materials & manpower required for the replacement of 100 NB pipe ( as mentioned above) are under the scope of contractor. 35 Item Code: 3565 NB,ASTM SCH40, Seamless/MS Class C -ERW pipesRemoval of damaged piping, erection of new piping & hydrotesting of replaced portion.Note: Entire materials & manpower required for the replacement of 65 NB pipe ( as mentioned above) are under the scope of contractor. 36 Item Code: 3650 NB,ASTM SCH40, Seamless/MS Class C -ERW pipesRemoval of damaged piping, erection of new piping & hydrotesting of replaced portion.Note: Entire materials & manpower required for the replacement of 50 NB pipe ( as mentioned above) are under the scope of contractor. 37 Item Code: 3740 NB,ASTM SCH40, Seamless/MS Class C -ERW pipesRemoval of damaged piping, erection of new piping & hydrotesting of replaced portion.Note: Entire materials & manpower required for the replacement of 40 NB pipe ( as mentioned above) are under the scope ofcontractor. 38 Item Code: 3832 NB,ASTM SCH40, Seamless/MS Class C -ERW/GI pipesRemoval of damaged piping, erection of new piping & hydrotesting of replaced portion.Note: Entire materials & manpower required for the replacement of 32 NB pipe ( as mentioned above) are under the scope of contractor. 39 Item Code: 3925 NB,ASTM SCH40, Seamless/MS Class C -ERW/GI pipesRemoval of damaged piping, erection of new piping & hydrotesting of replaced portion.Note: Entire materials & manpower required for the replacement of 25 NB pipe ( as mentioned above) are under the scope of contractor. 40 Item Code: 4020 NB,ASTM SCH40, Seamless/MS Class C -ERW/GI pipesRemoval of damaged piping, erection of new piping & hydrotesting of replaced portion.Note: Entire materials & manpower required for the replacement of 20 NB pipe ( as mentioned above) are under the scope of contractor. 41 Item Code: 4115 NB,ASTM SCH40, Seamless/MS Class C -ERW/GI pipesRemoval of damaged piping, erection of new piping & hydrotesting of replaced portion.Note: Entire materials & manpower required for the replacement of 15 NB pipe ( as mentioned above) are under the scope of contractor. 42 Item Code: 42Scope of work includes joint preparation, fitup & welding of 150 NB, ASTM SCH40, Seamless/ MS Class C-ERW, pipe joints.Note: Entire materials & manpower required for the welding of 150 NB, ASTM SCH40,Seamless/ MS Class C-ERW pipe joints are underthe scope of contractor. 43 Item Code: 43Scope of work includes joint preparation, fitup & welding of 100 NB, MS- Galvanised pipe joints.Note: Entire materials & manpower required for the welding of 100NB, MS- Galvanised pipe joints are under the scope of contractor. 44 Item Code : 44Scope of work includes joint preparation, fitup & welding of 65 NB, ASTM SCH40, Seamless/ MS Class C-ERW, pipe joints.Note: Entire materials & manpower required for the welding of 65 NB, ASTM SCH40,Seamless/ MS Class C-ERW pipe joints are under the scope of contractor. 45 Item Code: 45Scope of work includes joint preparation, fitup & welding of 50 NB, ASTM SCH40, Seamless/ MS Class C-ERW, pipe joints.Note: Entire materials & manpower required for the welding of 50 NB, ASTM SCH40, Seamless/ MS Class C-ERW pipe joints are underthe scope of contractor. 46 Item Code : 46Scope of work includes joint preparation, fitup & welding of 40 NB, ASTM SCH40, Seamless/ MS Class C-ERW, pipe joints.Note: Entire materials & manpower required for the welding of 40 NB, ASTM SCH40,Seamless/ MS Class C-ERW pipe joints are underthe scope of contractor. 47 Item Code : 47Scope of work includes joint preparation, fitup & welding of 32 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints.Note: Entire materials & manpower required for the welding of 32 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints are under the scope of contractor. 48 Item Code : 48Scope of work includes joint preparation, fitup & welding of 25 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints.Note: Entire materials & manpower required for the welding of 25 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints are under the scope of contractor. 49 Item Code : 49Scope of work includes joint preparation, fitup & welding of 20 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints.Note: Entire materials & manpower required for the welding of 20 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints are under the scope of contractor. 50 Item Code : 50Scope of work includes joint preparation, fitup & welding of 15 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints.Note: Entire materials & manpower required for the welding of 15 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints are under the scope of contractor. 51 Item Code: 51150 NBRemoval of damaged elbows, erection of new elbows & hydrotesting of replaced portion.Note: Entire materials & manpower required for the replacement of 150 NB elbows are under the scope of contractor. 52 Item Code: 5265 NBRemoval of damaged elbows, erection of new elbows & hydrotesting of replaced portion.Note: Entire materials & manpower required for the replacement of 65 NB elbows are under the scope of contractor. 53 Item Code: 5350 NBRemoval of damaged elbows, erection of new elbows & hydrotesting of replaced portion.Note: Entire materials & manpower required for the replacement of 50 NB elbows are under the scope of contractor. 54 Item Code: 5440 NBRemoval of damaged elbows, erection of new elbows & hydrotesting of replaced portion.Note: Entire materials & manpower required for the replacement of 40 NB elbows are under the scope of contractor. 55 Item Code: 5532 NBRemoval of damaged elbows, erection of new elbows & hydrotesting of replaced portion.Note: Entire materials & manpower required for the replacement of 32 NB elbows are under the scope of contractor. 56 Item Code: 5625 NBRemoval of damaged elbows, erection of new elbows & hydrotesting of replaced portion.Note: Entire materials & manpower required for the replacement of 25 NB elbows are under the scope of contractor. 57 Item Code: 5720 NBRemoval of damaged elbows, erection of new elbows & hydrotesting of replaced portion.Note: Entire materials & manpower required for the replacement of 20 NB elbows are under the scope of contractor. 58 Item Code: 5815 NBRemoval of damaged elbows, erection of new elbows & hydrotesting of replaced portion.Note: Entire materials & manpower required for the replacement of 15 NB elbows are under the scope of contractor. 59 Item Code: 59150 NBRemoval of damaged flanges, erection of new flanges & hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (150 NB, ASTM SCH40, Seamless/ MS Class C-ERW)Note: Entire materials & manpower required for the replacement of 150 NB flanges are under the scope of contractor. 60 Item Code: 6065 NBRemoval of damaged flanges, erection of new flanges & hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (65 NB, ASTM SCH40, Seamless/ MS Class C-ERW)Note: Entire materials & manpower required for the replacement of 65 NB flanges are under the scope of contractor. 61 Item Code: 6150 NBRemoval of damaged flanges, erection of new flanges & hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (50 NB, ASTM SCH40, Seamless/MS Class C-ERW)Note: Entire materials & manpower required for the replacement of 50 NB flanges are under the scope of contractor. 62 Item Code: 6240 NBRemoval of damaged flanges, erection of new flanges & hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (40 NB, ASTM SCH40, Seamless/ MS Class C-ERW)Note: Entire materials & manpower required for the replacement of 40 NB flanges are under the scope of contractor. 63 Item Code: 6332 NBRemoval of damaged flanges, erection of new flanges &hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (32 NB, ASTM SCH40, Seamless/ MS Class C-ERW /GI Class C -ERW)Note: Entire materials & manpower required for the replacement of 32 NB flanges are under the scope of contractor. 64 Item Code: 6425 NBRemoval of damaged flanges, erection of new flanges & hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (25 NB, ASTM SCH40, Seamless/ MS Class C-ERW /GI Class C -ERW)Note: Entire materials & manpower required for the replacement of 25 NB flanges are under the scope of contractor. 65 Item Code: 6520 NBRemoval of damaged flanges, erection of new flanges & hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (20 NB, ASTM SCH40, Seamless/ MS Class C-ERW /GI Class C -ERW)Note: Entire materials & manpower required for the replacement of 20 NB flanges are under the scope of contractor. 66 Item Code: 6615 NBRemoval of damaged flanges, erection of new flanges & hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (15 NB, ASTM SCH40, Seamless/ MS Class C-ERW /GI Class C -ERW)Note: Entire materials & manpower required for the replacement of 15 NB flanges are under the scope of contractor. 67 Item Code: 67150 NB Basket Type StrainersScope of work includes complete dismantling of the basket strainer, Cleaning, Replacement of all gaskets & Refixing of Basket typeStrainer.Note: Entire materials & manpower required for the overhauling works (as mentioned above) of the 150 NB basket type strainers are under the scope of the contractor. 68 Item Code: 6865 NB Angle type mud boxesScope of work includes complete dismantling of the angle type mud boxes, Cleaning, Replacement of all gaskets & Refixing of mud boxes.Note: Entire materials & manpower required for the overhauling works (as mentioned above) of the 65 NB angle type mud boxes are under the scope of the contractor. 69 Item Code: 6950 NB Angle type mud boxesScope of work includes complete dismantling of the angle type mud boxes, Cleaning, Replacement of all gaskets & Refixing of mud boxes.Note: Entire materials & manpower required for the overhauling works (as mentioned above) of the 50 NB angle type mud boxes are under thescope of the contractor. 70 Item Code: 70Overhauling of 150 NB Right Angle Stop ValveMOC: CS-GMScope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..), replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works.Note: Entire materials & manpower required for the overhauling works of 150NB Right Angle Stop Valve(as mentioned above) are under the scope of contractor. 71 Item Code: 71Overhauling of 150 NB Gate Valve. MOC: CI-SSScope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..), replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works.Note: Entire materials & manpower required for the overhauling works of 150NB Gate Valve(as mentioned above) are under the scope of contractor. 72 Item Code: 72Overhauling of 65 NB Gate Valve. MOC: CI/GM-GMScope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..), replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works.Note: Entire materials & manpower required for the overhauling works of 65 NB Gate Valve(as mentioned above) are under the scope of contractor. 73 Item Code: 73Overhauling of 50 NB Gate Valve.MOC: CI-GMScope of work includes removal of valves from pipe lines,complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..), replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works.Note: Entire materials & manpower required for the overhauling works of 50 NB Gate Valve(as mentioned above) are under the scope of contractor. 74 Item Code: 74Overhauling of 40 NB Gate Valve.MOC: CI-GMScope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..), replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works.Note: Entire materials & manpower required for the overhauling works of 40 NB Gate Valve(as mentioned above) are under the scope of contractor. 75 Item Code: 75Overhauling of 65 NB SDNR Right angle/ Straight Globe Valve.MOC: CS/CI-GMScope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..), replacement of valve seats and Gland packing, hydrotestingof the valves & refixing of the valves to the pipelines after completion of overhauling works.Note: Entire materials & manpower required for the overhauling works of 65 NB SDNR Right Angle/StraightGlobe Valve(as mentioned above) are under the scope ofcontractor. 76 Item Code: 76Overhauling of 50 NB SDNR Right Angle/Straight Globe Valve.MOC: CI-GMScope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..),replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works.Note: Entire materials & manpower required for the overhauling works of 50 NB SDNR Right Angle/Straight Globe Valve (as mentioned above) are under the scope of contractor. 77 Item Code: 77Overhauling of 40 NB SDNR Right Angle/ Straight Globe Valve.MOC: CS/CI-GMScope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..), replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works.Note: Entire materials & manpower required for the overhauling works of 40 NB SDNR Right Angle/Straight Globe Valve(as mentioned above) are under the scope of contractor. 78 Item Code: 78Overhauling of 65 NB Fire Hydrant Valves.MMD approvedScope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..),inspecting instantaneous couplings, replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion ofoverhauling works.Note: Entire materials & manpower required for the overhauling works of 65 NB Fire Hydrant Valves(as mentioned above) are under the scope of contractor. 79 Item Code: 79Overhauling of 40NB Ball Valves. MOC: GS-GMScope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..),replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works.Note: Entire materials & manpower required for the overhauling works of 40 NB Ball Valves(as mentioned above) are under the scope of contractor. 80 Item Code: 80Replacement of 40NB Gate Valve.MOC: BrassScope of work includes removal of damaged valves from pipe lines, fixing of new valves in pipelines and hydrotesting.Note: Entire materials & manpower required for the replacement of the 40 NB Gate Valves are under the scope of contractor. 81 Item Code: 81Replacement of 32 NB Gate Valve.MOC: BrassScope of work includes removal of damaged valves from pipe lines, fixing of new valves in pipelines and hydrotesting.Note: Entire materials & manpower required for the replacement of the 32 NB Gate Valves are under the scope of contractor. 82 Item Code: 82Replacement of 25 NB Gate Valve.MOC: BrassScope of work includes removal of damaged valves from pipe lines, fixing of new valves in pipelines and hydrotesting.Note: Entire materials & manpower required for the replacement of the 25 NB Gate Valves are under the scope of contractor. 83 Item Code: 83Replacement of 20 NB Ball Valve.MOC: SSScope of work includes removal of damaged valves from pipe lines, fixing of new valves in pipelines and hydrotesting.Note: Entire materials & manpower required for the replacement of the 20 NB Ball Valves are under the scope of contractor. 84 Item Code: 84Replacement of 15 NB Ball Valve.MOC: SSScope of work includes removal of damaged valves from pipe lines, fixing of new valves in pipelines and hydrotesting.Note: Entire materials & manpower required for the replacement of the 15 NB Ball Valves are under the scope of contractor. 85 Item Code: 85Replacement of 50 NB NR Valve Flap Type.MOC: SSScope of work includes removal of damaged valves from pipe lines, fixing of new valves in pipelines and hydrotesting.Note: Entire materials & manpower required for the replacement of the 50NB NR Valve Flap Type are under the scope of contractor. 86 Item Code: 86Replacement of 20 NB NR Valve Flap Type.MOC: SSScope of work includes removal of damaged valves from pipe lines,fixing of new valves in pipelines and hydrotesting.Note: Entire materials & manpower required for the replacementof the 20 NB NR Valve Flap Type are under the scope ofcontractor. 87 Item Code: 87Replacement of 15 NB NR Valve Flap Type.MOC: SSScope of work includes removal of damaged valves from pipe lines, fixing of new valves in pipelines and hydrotesting.Note: Entire materials & manpower required for the replacement of the 15 NB NR Valve Flap Type are under the scope of contractor. 88 Item Code: 8865 NB Strum boxesScope of work includes complete dismantling of the Strum Boxes, Cleaning, Replacement of all gaskets & Refixing of mud boxes.Note: Entire materials & manpower required for the overhauling works (as mentioned above) of the 65 NB strum boxes are under the scope of the contractor. 89 Item Code: 8950 NB Strum boxesScope of work includes complete dismantling of the Strum Boxes, Cleaning, Replacement of all gaskets & Refixing of mud boxes.Note: Entire materials & manpower required for the overhauling works (as mentioned above) of the 50 NB strum boxes are under the scope of the contractor. 90 Item Code: 90General Service Pump:General Service pump of the barge is driven by an independent diesel engine.Scope of work includes:1) Disconnecting engine side drive to the pump2) Complete dismantling of pump3) Cleaning of the parts of the pump(casing, impeller etc..)4) Replacing bearings of the pump with adequate lubrication5) Replacing oil seals, mechanical seals/gland packing, Lantern rings & Gaskets.6) Hydrotesting of the pump after assembling.7) Replacing engine oil, oil filters & air filter of the engine.8) Cleaning of the head & injectors of the engine.9) Replacing head to body gasket of engine10) Connecting assembled pump to engine drive.Size :65 NBMOC: CI-GM-SSFlow rate : 25Cum/hr @ 30mNote: Entire materials and manpower required for theoverhauling of General Service Pump(as mentioned above) are under the scope of contractor. 91 Item Code: 91Bilge Pump:Scope of work includes:1) Disconnecting the electrical motor which drives the pump.2) Complete dismantling of pump.3) Cleaning of the parts of the pump(casing, impeller etc..).4) Replacing bearings of the pump with adequate lubrication.5) Replacing oil seals, mechanical seals/gland packing, Lantern rings & Gaskets.6) Replacement of motor bearings & Seals.7) Checking any damages to the insulation & windings of the motor.8)Hydrotesting of the pump after assembling.9) Connecting assembled pump to motor.Size :65 NBMOC: CI-GM-SSFlow rate : 25Cum/hr @ 30mNote: Entire materials and manpower required for the overhauling of Bilge Pump (as mentioned above) are under the scope of contractor. 92 Item Code 92:Hand Pump(Semirotary):Scope of work includes complete dismantling of pump, cleaning, replacement of bearing & seals, assembling & hydrotesting of the pump for checking any leakages.Size:40NBMOC: CI/BrassNote: Entire materials & manpower required for the overhauling of Hand pumps(as mentioned above) are under the scope of contractor.. 93 Item Code 93:Mono Block Pump:Scope of work includes :1) Complete dismantling of pump and motor.2) Cleaning of the Pump3) Replacement of bearing & seals of the Pump4) Inspecting both rotor and stator sides of the motorfor any damages.5) Replacing bearings of the motor.6) Assembling both pump & motor after repair works.7) Hydrotesting of the pump for checking any leakages.Power : 1/2 HPElectric DrivenNote: Entire materials & manpower required for the overhauling of Monoblock pumps(as mentioned above) are under the scope of contractor. 94 Item Code: 94Scope of work includes completed dismantling, cleaning & replacing gaskets of the following ball type vent heads in the barge100NB- 2 nos80 NB -4 nos65 NB - 2 nosNote: All materials and manpower required for the overhauling works of ball type vent heads (as mentioned above) are under the scope ofcontractor. 95 Item Code: 95Scope of work includes servicing & carrying out functional tests of the following sounding pipes in the barge.80 NB - 4 nosNote: All materials and manpower required for the overhauling works of sounding pipes (as mentioned above) are under the scope ofcontractor. 96 Item Code: 96Providing assistance to the OEM of the main engines & diesel generators of barge during the overhauling works. 97 Item Code: 97Painting of Keel to Water LineScope of work includes Surface preparation by grit blasting(SA 2.5) and application of paint as per the painting specification attached.Note: All materials and manpower required for the painting of the Keel to Waterline are under the scope of contractor. Payment shall be made as per the actual area of completion of the work. 98 Item Code: 98Painting of Water Line to DeckScope of work includes Surface preparationby grit blasting(SA 2.5) and application of paintas per the painting specification attached.Note: All materials and manpower required for the painting of the Water line to Deck are under the scope of contractor. Payment shall be made as per the actual area of completion of the work. 99 Item Code: 99Painting of Cargo Hold.Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached.Note: All materials and manpower required for the painting of the Cargo Hold are under the scope of contractor. Payment shall be made as per the actual area of completion of the work. 100 Item Code: 100Painting of Weather Deck.Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached.Note: All materials and manpower required for the painting of the Weather deck are under the scope of contractor. Payment shall be made as per the actual area of completion of the work. 101 Item Code: 101Painting of Superstructure,Mast, Funnel, Deck fittings & machinery:Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached.Note: All materials and manpower required for the painting of the superstructure,mast,funnel deck fittings and machinery are under the scope of contractor.Payment shall be made as per the actual area of completion of the work. 102 Item Code: 102Painting of Machinery Space, stores & access passage:Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached.Note: All materials and manpower required for the painting of the Machinery Space, stores & access passage are under the scope of contractor. Payment shall be made as per the actual area of completion of the work. 103 Item Code: 103Painting of potable water tanks:Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of 2 coats ( each coat of 50 microns DFT) food grade paint.Note: All materials and manpower required for the painting of the potable water tanks are under the scope of contractor.Payment shall bemade as per the actual area of completion of the work. 104 Item Code: 104Painting of Ballast Tanks,cofferdams, void spacesand chain locker:Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached.Note: All materials and manpower required for the painting of the Ballast Tanks,cofferdams, void spaces and chain locker are under the scope of contractor. Payment shall be made as per the actual area of completion of the work. 105 Item Code: 105Painting of Other floors:Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached.Note: All materials and manpower required for the painting of the Other floors are under the scope of contractor. Payment shall be made as per the actual area of completion of the work. 106 Item Code: 106Painting of funnel internals :Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached.Note: All materials and manpower required for the painting of the funnel internals are under the scope of contractor. Payment shall be made as per the actual area of completion of the work. 107 Item Code: 107Painting of anchor chain & anchor:Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached.Note: All materials and manpower required for the painting of the anchor chain & anchor are under the scope of contractor. Payment shall be made as per the actual area of completion of the work. 108 Item Code: 108Painting of miscellaneous items:Scope of work includes Repainting of barge name, classification agency notations, Registration No, plimsoll mark & other markings for the identification of the parts in the barge.Note: All materials and manpower required for the painting of the miscellaneous items(as mentioned above) are under the scope of contractor.. 109 Item Code: 109Repacing sprinkler pipe lines:Scope of work includes replacing corroded sprinkler system pipes (50 NB, SA 106 Gr.B) including sprinklersNote: All materials and manpower required for the replacement of sprinkler system pipe lines are under the scope of contractor. 110 Item Code: 110Replacing damaged GI roof sheets on cargo hold.Note: All materials and manpower required for thereplacement of damaged GI roof sheetsare under the scope of contractor. 111 Item Code: 111Repacing damaged handrail pipes:Scope of work includes replacing corroded damaged handrail pipesNote: All materials and manpower required for the replacement of handrail pipes are under the scope of contractor. 112 Item Code: 112Repacing damaged handrail stanchion:Scope of work includes replacing damaged handrail stanchionNote: All materials and manpower required for the replacement of handrail stanchion are under the scope of contractor. 113 Item Code: 113Repacing damaged cable trays:Scope of work includes replacing damaged cable trays in barge.Note: All materials and manpower required for the replacement of cable trays are under the scope of contractor. 114 Item Code : 114Cleaning of scupper & discharge linesScope of work includes cleaning of Holding tank & bio tanks, clearing off any blockages in the discharge lines & scuppers.Note: All materials and manpower required for the cleaning of scupper and discharge lines of the barge (as mentioned above) are under scope of contractor. 115 Item Code: 115Replacement of viinyl flooring in wheel house & accommadation deck in the barge.Note: All materials and manpower required for the replacement of the vinyl flooring in the barge are under the scope of contractor. 116 Item Code :116Repair of damaged propellersScope of work includes carrying out the repair works of the existing damaged propellers of the barge as per the recommendations of Classification agency/KIV/FACT. 117 Item Code: 117Executing miscellanenous works which are not mentioned in the schedule of work. 118 Item Code: 118Providing service of 100T Mobile Crane for removing the LAG Bullets from Barge for carrying out the repair of the hull in the regionsbelow the bullets.Note: Slings, tools & tackles required for lifting the bullets under the scope of contractor.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 23-Dec-2022 Corrigendum-Technical Technical Bid 05-01-2023
2 05-Jan-2023 Corrigendun_Date Extension Date 12-01-2023
3 07-Jan-2023 Technical corrigendum Technical Bid 12-01-2023

Key Value

Document Fees
Refer document
EMD
INR 100000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Dry Docking of FACT Barge Pragatiyan-2023
Sl. No. Item Description
1Item Code 01: Preparation of docking plan for the Pragatiyan barge.
2Item Code : 02 To & Fro Transportation of Pragatiyan barge from Q10 Berth, Willingdon Island to Xontractor"s Yard. Crew required for the navigation of the barge is under the scope of contractor.
3Item Code: 03 Dry Docking of Pragatiyan barge as per the approved docking plan
4Item Code 04: Dock Hire Charges of the Yard.
5Item Code 05: Wharfage Charges of the Yard.
6Item Code 06: Undocking of Pragatiyan barge from contractor"s yard after the completion of the repair works.
7Item Code 07: Shore Power Supply- 3 Phase, 415 V,50Hz.
8Item Code 08: Emptying Diesel & Oil tanks in the barge. Providing closed containers and space in the yard for storing the drained diesel & oil from the tanks in the barge. Refilling diesel to the barge after completion of the repair works. Note : Entire materials & manpower required for the emptying, storing & refilling of Diesel & Oil tanks in the barge are under the scope of contractor.
9Item Code 09: High pressure water jet cleaning of barge after dry docking: All accessible spaces of the barge shall be cleaned by using high pressure water cleaning. External surfaces shall be free of dirt, marine growths, barnacles etc.. Sludge,muck,debris & mud in ballast tanks, bilge, cargo area, sea chest, fresh water tanks,fuel Tanks, store Area etc.. shall be cleared and disposed off to shore Note: Entire materials & manpower required for cleaning of the barge are under the scope of contractor.
10Item Code 10: Gas free certification of the diesel tanks by Yard.
11Item Code 11: Performing Ultrasound Thickness Gauging (UTG) at areas recommended by the surveyor. Rate to be quoted per point gauging by Ultrasound thickness guage. Note: Entire materials, equipment(Ultrasound thickness guage) & manpower required for performing the thickness measurement are under the scope of contractor.
12Item Code 12: Steel Plate Renewal- Steel Plate renewal includes replacement of associated beams, channels, angles, stiffeners etc.. connected to the plates. Areas that are marked by Classification society/KIV/FACT for steel renewal shall be repaired by Contractor. All material used for the steel renewal works shall be confirming to IRS Grade A. Only welders who have qualified the WQT shall be assigned for the repair works. NDT tests like RT,UT,DP,MPI etc.. if required after the carrying out the repair works shall be under the scope of contractor. Note: Entire materials & manpower required for the steel plate renewal works of the barge are under the scope of contractor.
13Item Code 13: Renewal of Anodes: All Type A ( 8 kg) zinc anodes on the barge shall be replaced. Replaced anodes shall be of class approved and shall contain zinc content of atleast 98%. Note: Entire materials & manpower required for replacing Type A zinc anodes are under scope of contractor.
14Item Code 14: Renewal of Anodes: All Type B ( 5 kg) zinc anodes on the barge shall be replaced. Replaced anodes shall be of class approvedand shall contain zinc content of atleast 98%. Note: Entire materials & manpower required for replacing Type B zinc anodes are under scope of contractor.
15Item Code 15: Renewal of Anodes: All Type C ( 3 kg) zinc anodes on the barge shall be replaced. Replaced anodes shall be of class approvedand shall contain zinc content of atleast 98%. Note: Entire materials & manpower required for replacing Type C zinc anodes are under scope of contractor.
16Item Code 16: Replacement of damaged "D" type hollow fenders (Base : 150 mm x 150 mm) on the Barge. Damaged Fasteners of "D" tpe hollow fenders shall also be replaced by contractor. Note: Entire materials & manpower required for the replacement of D-fender are under the scope of contractor.
17Item Code 17: Fore peak space cleaning: Fore peak space shall be cleaned and made ready for Classification agency/KIV Inspection. Sludge,muck,debris & mud in the fore peak space shall be cleared and disposed off to shore Note: Entire materials & manpower required for the cleaning of Fore peak space shall be under the scope of contractor.
18Item Code 18: Cargo hold cleaning: Cargo hold shall be cleaned and made ready for Classification agency/KIV Inspection. Sludge,muck,debris & mud in the cargo hold shall be cleared and disposed off to shore. Note: Entire materials & manpower required for the cleaning of cargo hold space shall be under the scope of contractor.
19Item Code 19: Ballast Tank Cleaning: Ballast Tanks shall be cleaned and made ready for the Classification agency/KIV Inspection. Sludge, muck, debris & mud in ballast tanks shall be cleared and disposed off to shore. Note: Note: Entire materials & manpower required for the cleaning of Ballast Tanks shall be under the scope of contractor.
20Item Code 20: Chain Locker & Store space cleaning- Chain Locker & Store spaceshall be cleaned and made ready for Classification agency/KIV inspection Sludge,muck,debris, oil, grease & mud in the chain locker & Store space shall be cleaned & disposed off to shore. Note: Entire materials & manpower required for the cleaning of Chain Locker & Store space shall be under the scope of contractor.
21Item Code21: Fresh water Tanks Cleaning- Fresh water tanks shall be cleaned and made ready for Classification agency/KIV Inspection. Sludge,muck,debris and mud in fresh water tanks shall be cleared & disposed off to shore. Note: Entire materials & manpower required for the cleaning of fresh water tanks shall be under the scope of contractor.
22Item Code 22: Fuel Oil Tanks Cleaning: Fuel oil tanks shall be cleaned and made ready for Classification agency/KIV Inspection. Sludge & muck in the fuel oil tanks shall be cleared & disposed off to shore. Note: Entire materials & manpower required for the cleaning of fuel oil tanks shall be under the scope of contractor.
23Item Code 23 Sea Chest: Sea Chest to be opened and cleaned. Mud, muck & Sludge to be removed from the sea chest and disposed ashore. Gratings to be inspected and cleaned. All fasteners of the gratings to be replaced. Note: Entire materials & manpower required for the cleaning & repair works in Sea Chest shall be under the scope of contractor.
24Item Code 24: Supplyof starboard & port side propellers as per drg No. VM/FEW/001 Material of Construction: Mn Bronze Gr.Cu 1. Propellers supplied shall be of class approved.
25Item Code 25: Propeller- Removal of existing propellers of the barge from the propeller shaft.Repalcing it with the new propellers. New propellers shall be of class approved. Fastners & Gaskets used in the hub and sealing flange to be replaced with new ones. Note: Entire materials and manpower required for the replacement of the propellers are under scope of contractor.
26Item Code 26: Propeller Shafts: Propeller shafts to be removed from the stern tube. Entire shaft surface shall be DP tested to check whether any surface cracks or abrasion marks or striations are present. If cracks or striations are found, these shall be suitably repaired by welding. Deflection of the shafts to be measured and confirmed within limits. If not, bend correction to be done. Threaded portion and keyways on shaft to be inspected.Any damages on these portions to be repaired. Aft & Forward bearing of the propeller shafts to be replaced with new one prior to fixing of the shaft. New bearings shall be of class approved. Rope guards on the shaft shall be checked for any damages. Damages,if any, shall be repaired. All fasteners to be replaced with new ones. Entire fasteners used for fixing the key, bearings, Gland Follower, Rope guard & Stub shaft shall be of new ones and confirming to specifications mentionedin Drg No: VM/FEW/001/301. Balancing of the propellers are to be done prior to fixing of the shafts. Note: Entire materials and manpower required for the repair works( as mentioned above) in propeller shaft are under the scope of contractor.
27Item Code 27 Rudder: Rudder Blade, Rudder Stock & Tillershall be completely removed and inspected. Rudder Blade coupling bolts to be replaced.Any damages on the rudder blade shall be rectified. Entire surface of the rudder stock shall be DP tested to check whether any surface cracks or abrasion marks or striations are present. If cracks or abrasion marks or striations are found, these shall be suitably repaired by welding. Deflection of the rudder stock to be measured and confirmed within limits. If not, bend correction and of the shaftsto be done. Threaded portion and keyways on rudder stock to be inspected. Any damages on these portions shall berepaired. Upper & Lower bearing of the rudder stock shall be replaced. Bearing housing located at both upper and lower side shall be checked for any damages. Damages, if any, shall be repaired. Tiller & Tiller Rod shall be inspected for any damages. Any damages found shall be suitable repaired. All fasteners to be replaced with new ones. Fasteners replaced shall be confirming to the specifications mentioned in Drg no.VM/FEW/001/208 & VM/FEW/001/208A Note: Entire materials & manpower required for the repair works (as mentioned above) of the rudder, rudder stock & tiller are under the scope of contractor.
28Item Code 28: Steering System: Hydraulic Lines of the steering system shall be checked for any leakages and damages. If any damages are found in the hydralic lines, same shall be replaced with new ones of same pressure rating. Leakages, if any , at coupling ends of line shall be arrested. Hydraulic cylinder for actuating the rudders shall be overhauled. All seals ( Piston seals, Piston rod seals, Cushion seals, Cylinder Head seals etc..) & wear strips/rings shall be replaced. Piston rod, Piston, tie-rods, Barrel & Heads shall be inspected for any damages. Directional control valves/Servo valves /relief valves in the steering system to be inspected & Overhauled. O-rings in directional control valves/Servo valves to be changed. Solenoids of the valves to be checked for the actuation. Solenoids to be replaced if actuation of the spool is not done properly. Valve seats in the relief valves to replaced and pressure tested to the required pressure. Hydraulic Pumpto be removed from Port side engine drive and overhauled. Seals & bearings in the helm pump & engine driven hydraulic pump shall be replaced with new ones. Fresh Hydraulic oil to be filled in the lines and steering fluid tank by the contractor after carrying out required maintenance works. Note: Entire materials and manpower required for the overhauling works(as mentioned above) of the steering system are under the scope of contractor.
29Item Code 29: Electrical System: Main switch board, all junction box circuit breakers, control panels ofequipment on deck, wheel house and engine room to be thoroughly examined. Damaged cables to be repaired and replaced. Payment for the cables procured shall be paid extra against the document evidence. Safety measures in the electrical system like overload trip, reverse current trip, low voltage trip and interlock between the breaker are to be shown to the surveyor. Note: Entire materials and manpower required for the inspection, repair works(as mentioned above) & testing of the electrical system are under the scope of contractor.
30Item Code 30: Inspection & testing of fire sensors/alarm, Smoke sensor &bilgesensor/alarm: The sensors and alarms shall be inspected for proper working condition. If sensons/alarms are found to be not operating, same shall be repaired or replaced with with new ones. Contractor shall arrange the new sensors/alarms, if needed to be replaced based on the recommendation from classification agency. Payment for the procurement of the sensors/alarm shall be paid extra against the document evidence. Note: Entire materials and manpower required for the inspection, repair works(as mentioned above) & testing of the sensors/alarm are under the scope of contractor.
31Item Code 31: Anchor : Anchor and anchor chain shall be thoroughly cleaned by chipping and scrapping. Swivels, shackles,stud links & open links of the anchor chain shall be inspected for the damages. All moving components of the anchor to be freed and anchor to be painted with 2 coats of bismatic paint. Note: Entire materials and manpower required for the repair works of anchor and anchor chains (as mentioned above) are under the scope of contractor.
32Item Code 32: Windlass: Windlass shall be completely dismantled and overhauled. All bearings & pins shall be lubricated. All brake linings & clutches plates to be inspected for any damages. Any damaged bearings, brake lining & clutch plates shall be replaced as per the recommendation of the Classification agency/KIV/FACT. Payment for the replaced items shall be paid extra against the document evidence. Note: Entire materials and manpower required for the overhauling works (as mentioned above) of windlass are under the scope of contractor.
33Item Code: 33 150 NB,ASTM SCH40, Seamless/MS Class C -ERW pipes Removal of damaged piping, erection of new piping & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 150 NB pipe ( as mentioned above) are under the scope of contractor.
34Item Code: 34 100 NB, MS -Galvanised Removal of damaged piping, erection of new piping & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 100 NB pipe ( as mentioned above) are under the scope of contractor.
35Item Code: 35 65 NB,ASTM SCH40, Seamless/MS Class C -ERW pipes Removal of damaged piping, erection of new piping & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 65 NB pipe ( as mentioned above) are under the scope of contractor.
36Item Code: 36 50 NB,ASTM SCH40, Seamless/MS Class C -ERW pipes Removal of damaged piping, erection of new piping & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 50 NB pipe ( as mentioned above) are under the scope of contractor.
37Item Code: 37 40 NB,ASTM SCH40, Seamless/MS Class C -ERW pipes Removal of damaged piping, erection of new piping & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 40 NB pipe ( as mentioned above) are under the scope of contractor.
38Item Code: 38 32 NB,ASTM SCH40, Seamless/MS Class C -ERW/GI pipes Removal of damaged piping, erection of new piping & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 32 NB pipe ( as mentioned above) are under the scope of contractor.
39Item Code: 39 25 NB,ASTM SCH40, Seamless/MS Class C -ERW/GI pipes Removal of damaged piping, erection of new piping & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 25 NB pipe ( as mentioned above) are under the scope of contractor.
40Item Code: 40 20 NB,ASTM SCH40, Seamless/MS Class C -ERW/GI pipes Removal of damaged piping, erection of new piping & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 20 NB pipe ( as mentioned above) are under the scope of contractor.
41Item Code: 41 15 NB,ASTM SCH40, Seamless/MS Class C -ERW/GI pipes Removal of damaged piping, erection of new piping & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 15 NB pipe ( as mentioned above) are under the scope of contractor.
42Item Code: 42 Scope of work includes joint preparation, fitup & welding of 150 NB, ASTM SCH40, Seamless/ MS Class C-ERW, pipe joints. Note: Entire materials & manpower required for the welding of 150 NB, ASTM SCH40,Seamless/ MS Class C-ERW pipe joints are under the scope of contractor.
43Item Code: 43 Scope of work includes joint preparation, fitup & welding of 100 NB, MS- Galvanised pipe joints. Note: Entire materials & manpower required for the welding of 100NB, MS- Galvanised pipe joints are under the scope of contractor.
44Item Code : 44 Scope of work includes joint preparation, fitup & welding of 65 NB, ASTM SCH40, Seamless/ MS Class C-ERW, pipe joints. Note: Entire materials & manpower required for the welding of 65 NB, ASTM SCH40,Seamless/ MS Class C-ERW pipe joints are under the scope of contractor.
45Item Code: 45 Scope of work includes joint preparation, fitup & welding of 50 NB, ASTM SCH40, Seamless/ MS Class C-ERW, pipe joints. Note: Entire materials & manpower required for the welding of 50 NB, ASTM SCH40, Seamless/ MS Class C-ERW pipe joints are under the scope of contractor.
46Item Code : 46 Scope of work includes joint preparation, fitup & welding of 40 NB, ASTM SCH40, Seamless/ MS Class C-ERW, pipe joints. Note: Entire materials & manpower required for the welding of 40 NB, ASTM SCH40,Seamless/ MS Class C-ERW pipe joints are under the scope of contractor.
47Item Code : 47 Scope of work includes joint preparation, fitup & welding of 32 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints. Note: Entire materials & manpower required for the welding of 32 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints are under the scope of contractor.
48Item Code : 48 Scope of work includes joint preparation, fitup & welding of 25 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints. Note: Entire materials & manpower required for the welding of 25 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints are under the scope of contractor.
49Item Code : 49 Scope of work includes joint preparation, fitup & welding of 20 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints. Note: Entire materials & manpower required for the welding of 20 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints are under the scope of contractor."
50Item Code : 50 Scope of work includes joint preparation, fitup & welding of 15 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints. Note: Entire materials & manpower required for the welding of 15 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints are under the scope of contractor.
51Item Code: 51 150 NB Removal of damaged elbows, erection of new elbows & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 150 NB elbows are under the scope of contractor.
52Item Code: 52 65 NB Removal of damaged elbows, erection of new elbows & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 65 NB elbows are under the scope of contractor.
53Item Code: 53 50 NB Removal of damaged elbows, erection of new elbows & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 50 NB elbows are under the scope of contractor.
54Item Code: 54 40 NB Removal of damaged elbows, erection of new elbows & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 40 NB elbows are under the scope of contractor.
55Item Code: 55 32 NB Removal of damaged elbows, erection of new elbows & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 32 NB elbows are under the scope of contractor.
56Item Code: 56 25 NB Removal of damaged elbows, erection of new elbows & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 25 NB elbows are under the scope of contractor.
57Item Code: 57 20 NB Removal of damaged elbows, erection of new elbows & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 20 NB elbows are under the scope of contractor.
58Item Code: 58 15 NB Removal of damaged elbows, erection of new elbows & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 15 NB elbows are under the scope of contractor.
59Item Code: 59 150 NB Removal of damaged flanges, erection of new flanges & hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (150 NB, ASTM SCH40, Seamless/ MS Class C-ERW) Note: Entire materials & manpower required for the replacement of 150 NB flanges are under the scope of contractor.
60Item Code: 60 65 NB Removal of damaged flanges, erection of new flanges & hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (65 NB, ASTM SCH40, Seamless/ MS Class C-ERW) Note: Entire materials & manpower required for the replacement of 65 NB flanges are under the scope of contractor.
61Item Code: 61 50 NB Removal of damaged flanges, erection of new flanges & hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (50 NB, ASTM SCH40, Seamless/MS Class C-ERW) Note: Entire materials & manpower required for the replacement of 50 NB flanges are under the scope of contractor.
62Item Code: 62 40 NB Removal of damaged flanges, erection of new flanges & hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (40 NB, ASTM SCH40, Seamless/ MS Class C-ERW) Note: Entire materials & manpower required for the replacement of 40 NB flanges are under the scope of contractor.
63Item Code: 63 32 NB Removal of damaged flanges, erection of new flanges & hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (32 NB, ASTM SCH40, Seamless/ MS Class C-ERW /GI Class C -ERW) Note: Entire materials & manpower required for the replacement of 32 NB flanges are under the scope of contractor.
64Item Code: 64 25 NB Removal of damaged flanges, erection of new flanges & hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (25 NB, ASTM SCH40, Seamless/ MS Class C-ERW /GI Class C -ERW) Note: Entire materials & manpower required for the replacement of 25 NB flanges are under the scope of contractor.
65Item Code: 65 20 NB Removal of damaged flanges, erection of new flanges & hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (20 NB, ASTM SCH40, Seamless/ MS Class C-ERW /GI Class C -ERW) Note: Entire materials & manpower required for the replacement of 20 NB flanges are under the scope of contractor.
66Item Code: 66 15 NB Removal of damaged flanges, erection of new flanges & hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (15 NB, ASTM SCH40, Seamless/ MS Class C-ERW /GI Class C -ERW) Note: Entire materials & manpower required for the replacement of 15 NB flanges are under the scope of contractor.
67Item Code: 67 150 NB Basket Type Strainers Scope of work includes complete dismantling of the basket strainer, Cleaning, Replacement of all gaskets & Refixing of Basket type Strainer. Note: Entire materials & manpower required for the overhauling works (as mentioned above) of the 150 NB basket type strainers are under the scope of the contractor.
68Item Code: 68 65 NB Angle type mud boxes Scope of work includes complete dismantling of the angle type mud boxes, Cleaning, Replacement of all gaskets & Refixing of mud boxes. Note: Entire materials & manpower required for the overhauling works (as mentioned above) of the 65 NB angle type mud boxes are under the scope of the contractor.
69Item Code: 69 50 NB Angle type mud boxes Scope of work includes complete dismantling of the angle type mud boxes, Cleaning, Replacement of all gaskets & Refixing of mud boxes. Note: Entire materials & manpower required for the overhauling works (as mentioned above) of the 50 NB angle type mud boxes are under the scope of the contractor.
70Item Code: 70 Overhauling of 150 NB Right Angle Stop Valve MOC: CS-GM Scope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..), replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works. Note: Entire materials & manpower required for the overhauling works of 150NB Right Angle Stop Valve(as mentioned above) are under the scope of contractor.
71Item Code: 71 Overhauling of 150 NB Gate Valve. MOC: CI-SS Scope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..), replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works. Note: Entire materials & manpower required for the overhauling works of 150NB Gate Valve(as mentioned above) are under the scope of contractor.
72Item Code: 72 Overhauling of 65 NB Gate Valve. MOC: CI/GM-GM Scope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..), replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works. Note: Entire materials & manpower required for the overhauling works of 65 NB Gate Valve(as mentioned above) are under the scope of contractor.
73Item Code: 73 Overhauling of 50 NB Gate Valve.MOC: CI-GM Scope of work includes removal of valves from pipe lines,complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..), replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works. Note: Entire materials & manpower required for the overhauling works of 50 NB Gate Valve(as mentioned above) are under the scope of contractor.
74Item Code: 74 Overhauling of 40 NB Gate Valve.MOC: CI-GM Scope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..), replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works. Note: Entire materials & manpower required for the overhauling works of 40 NB Gate Valve(as mentioned above) are under the scope of contractor.
75Item Code: 75 Overhauling of 65 NB SDNR Right angle/ Straight Globe Valve. MOC: CS/CI-GM Scope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..), replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works. Note: Entire materials & manpower required for the overhauling works of 65 NB SDNR Right Angle/StraightGlobe Valve(as mentioned above) are under the scope ofcontractor.
76Item Code: 76 Overhauling of 50 NB SDNR Right Angle/Straight Globe Valve. MOC: CI-GM Scope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..),replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works. Note: Entire materials & manpower required for the overhauling works of 50 NB SDNR Right Angle/Straight Globe Valve (as mentioned above) are under the scope of contractor.
77Item Code: 77 Overhauling of 40 NB SDNR Right Angle/ Straight Globe Valve. MOC: CS/CI-GM Scope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..), replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works. Note: Entire materials & manpower required for the overhauling works of 40 NB SDNR Right Angle/Straight Globe Valve(as mentioned above) are under the scope of contractor.
78Item Code: 78 Overhauling of 65 NB Fire Hydrant Valves. MMD approved Scope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..),inspecting instantaneous couplings, replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion ofoverhauling works. Note: Entire materials & manpower required for the overhauling works of 65 NB Fire Hydrant Valves(as mentioned above) are under the scope of contractor.
79Item Code: 79 Overhauling of 40NB Ball Valves. MOC: GS-GM Scope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..),replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works. Note: Entire materials & manpower required for the overhauling works of 40 NB Ball Valves(as mentioned above) are under the scope of contractor.
80Item Code: 80 Replacement of 40NB Gate Valve. MOC: Brass Scope of work includes removal of damaged valves from pipe lines, fixing of new valves in pipelines and hydrotesting. Note: Entire materials & manpower required for the replacement of the 40 NB Gate Valves are under the scope of contractor.
81Item Code: 81 Replacement of 32 NB Gate Valve. MOC: Brass Scope of work includes removal of damaged valves from pipe lines, fixing of new valves in pipelines and hydrotesting. Note: Entire materials & manpower required for the replacement of the 32 NB Gate Valves are under the scope of contractor.
82Item Code: 82 Replacement of 25 NB Gate Valve. MOC: Brass Scope of work includes removal of damaged valves from pipe lines, fixing of new valves in pipelines and hydrotesting. Note: Entire materials & manpower required for the replacement of the 25 NB Gate Valves are under the scope of contractor.
83Item Code: 83 Replacement of 20 NB Ball Valve. MOC: SS Scope of work includes removal of damaged valves from pipe lines, fixing of new valves in pipelines and hydrotesting. Note: Entire materials & manpower required for the replacement of the 20 NB Ball Valves are under the scope of contractor.
84Item Code: 84 Replacement of 15 NB Ball Valve. MOC: SS Scope of work includes removal of damaged valves from pipe lines, fixing of new valves in pipelines and hydrotesting. Note: Entire materials & manpower required for the replacement of the 15 NB Ball Valves are under the scope of contractor.
85Item Code: 85 Replacement of 50 NB NR Valve Flap Type. MOC: SS Scope of work includes removal of damaged valves from pipe lines, fixing of new valves in pipelines and hydrotesting. Note: Entire materials & manpower required for the replacement of the 50NB NR Valve Flap Type are under the scope of contractor.
86Item Code: 86 Replacement of 20 NB NR Valve Flap Type. MOC: SS Scope of work includes removal of damaged valves from pipe lines, fixing of new valves in pipelines and hydrotesting. Note: Entire materials & manpower required for the replacement of the 20 NB NR Valve Flap Type are under the scope of contractor.
87Item Code: 87 Replacement of 15 NB NR Valve Flap Type. MOC: SS Scope of work includes removal of damaged valves from pipe lines, fixing of new valves in pipelines and hydrotesting. Note: Entire materials & manpower required for the replacement of the 15 NB NR Valve Flap Type are under the scope of contractor.
88Item Code: 88 65 NB Strum boxes Scope of work includes complete dismantling of the Strum Boxes, Cleaning, Replacement of all gaskets & Refixing of mud boxes. Note: Entire materials & manpower required for the overhauling works (as mentioned above) of the 65 NB strum boxes are under the scope of the contractor.
89Item Code: 89 50 NB Strum boxes Scope of work includes complete dismantling of the Strum Boxes, Cleaning, Replacement of all gaskets & Refixing of mud boxes. Note: Entire materials & manpower required for the overhauling works (as mentioned above) of the 50 NB strum boxes are under the scope of the contractor.
90Item Code: 90 General Service Pump: General Service pump of the barge is driven by an independent diesel engine. Scope of work includes: 1) Disconnecting engine side drive to the pump 2) Complete dismantling of pump 3) Cleaning of the parts of the pump(casing, impeller etc..) 4) Replacing bearings of the pump with adequate lubrication 5) Replacing oil seals, mechanical seals/gland packing, Lantern rings & Gaskets. 6) Hydrotesting of the pump after assembling. 7) Replacing engine oil, oil filters & air filter of the engine. 8) Cleaning of the head & injectors of the engine. 9) Replacing head to body gasket of engine 10) Connecting assembled pump to engine drive. Size :65 NB MOC: CI-GM-SS Flow rate : 25Cum/hr @ 30m Note: Entire materials and manpower required for theoverhauling of General Service Pump(as mentioned above) are under the scope of contractor.
91Item Code: 91 Bilge Pump: Scope of work includes: 1) Disconnecting the electrical motor which drives the pump. 2) Complete dismantling of pump. 3) Cleaning of the parts of the pump(casing, impeller etc..). 4) Replacing bearings of the pump with adequate lubrication. 5) Replacing oil seals, mechanical seals/gland packing, Lantern rings & Gaskets. 6) Replacement of motor bearings & Seals. 7) Checking any damages to the insulation & windings of the motor. 8)Hydrotesting of the pump after assembling. 9) Connecting assembled pump to motor. Size :65 NB MOC: CI-GM-SS Flow rate : 25Cum/hr @ 30m Note: Entire materials and manpower required for the overhauling of Bilge Pump (as mentioned above) are under the scope of contractor.
92Item Code 92: Hand Pump(Semirotary): Scope of work includes complete dismantling of pump, cleaning, replacement of bearing & seals, assembling & hydrotesting of the pump for checking any leakages. Size:40NB MOC: CI/Brass Note: Entire materials & manpower required for the overhauling of Hand pumps(as mentioned above) are under the scope of contractor..
93Item Code 93: Mono Block Pump: Scope of work includes : 1) Complete dismantling of pump and motor. 2) Cleaning of the Pump 3) Replacement of bearing & seals of the Pump 4) Inspecting both rotor and stator sides of the motor for any damages. 5) Replacing bearings of the motor. 6) Assembling both pump & motor after repair works. 7) Hydrotesting of the pump for checking any leakages. Power : 1/2 HP Electric Driven Note: Entire materials & manpower required for the overhauling of Monoblock pumps(as mentioned above) are under the scope of contractor.
94Item Code: 94 Scope of work includes completed dismantling, cleaning & replacing gaskets of the following ball type vent heads in the barge 100NB- 2 nos 80 NB -4 nos 65 NB - 2 nos Note: All materials and manpower required for the overhauling works of ball type vent heads (as mentioned above) are under the scope of contractor.
95Item Code: 95 Scope of work includes servicing & carrying out functional tests of the following sounding pipes in the barge. 80 NB - 4 nos Note: All materials and manpower required for the overhauling works of sounding pipes (as mentioned above) are under the scope of contractor.
96Item Code: 96 Providing assistance to the OEM of the main engines & diesel generators of barge during the overhauling works.
97Item Code: 97 Painting of Keel to Water Line Scope of work includes Surface preparation by grit blasting(SA 2.5) and application of paint as per the painting specification attached. Note: All materials and manpower required for the painting of the Keel to Waterline are under the scope of contractor. Payment shall be made as per the actual area of completion of the work.
98Item Code: 98 Painting of Water Line to Deck Scope of work includes Surface preparation by grit blasting(SA 2.5) and application of paint as per the painting specification attached. Note: All materials and manpower required for the painting of the Water line to Deck are under the scope of contractor. Payment shall be made as per the actual area of completion of the work.
99Item Code: 99 Painting of Cargo Hold. Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached. Note: All materials and manpower required for the painting of the Cargo Hold are under the scope of contractor. Payment shall be made as per the actual area of completion of the work.
100Item Code: 100 Painting of Weather Deck. Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached. Note: All materials and manpower required for the painting of the Weather deck are under the scope of contractor. Payment shall be made as per the actual area of completion of the work.
101Item Code: 101 Painting of Superstructure,Mast, Funnel, Deck fittings & machinery: Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached. Note: All materials and manpower required for the painting of the superstructure,mast,funnel deck fittings and machinery are under the scope of contractor.Payment shall be made as per the actual area of completion of the work.
102Item Code: 102 Painting of Machinery Space, stores & access passage: Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached. Note: All materials and manpower required for the painting of the Machinery Space, stores & access passage are under the scope of contractor. Payment shall be made as per the actual area of completion of the work.
103Item Code: 103 Painting of potable water tanks: Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of 2 coats ( each coat of 50 microns DFT) food grade paint. Note: All materials and manpower required for the painting of the potable water tanks are under the scope of contractor.Payment shall be made as per the actual area of completion of the work.
104Item Code: 104 Painting of Ballast Tanks,cofferdams, void spaces and chain locker: Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached. Note: All materials and manpower required for the painting of the Ballast Tanks,cofferdams, void spaces and chain locker are under the scope of contractor. Payment shall be made as per the actual area of completion of the work.
105Item Code: 105 Painting of Other floors: Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached. Note: All materials and manpower required for the painting of the Other floors are under the scope of contractor. Payment shall be made as per the actual area of completion of the work.
106Item Code: 106 Painting of funnel internals : Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached. Note: All materials and manpower required for the painting of the funnel internals are under the scope of contractor. Payment shall be made as per the actual area of completion of the work.
107Item Code: 107 Painting of anchor chain & anchor: Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached. Note: All materials and manpower required for the painting of the anchor chain & anchor are under the scope of contractor. Payment shall be made as per the actual area of completion of the work.
108Item Code: 108 Painting of miscellaneous items: Scope of work includes Repainting of barge name, classification agency notations, Registration No, plimsoll mark & other markings for the identification of the parts in the barge. Note: All materials and manpower required for the painting of the miscellaneous items(as mentioned above) are under the scope of contractor..
109Item Code: 109 Repacing sprinkler pipe lines: Scope of work includes replacing corroded sprinkler system pipes (50 NB, SA 106 Gr.B) including sprinklers Note: All materials and manpower required for the replacement of sprinkler system pipe lines are under the scope of contractor.
110Item Code: 110 Replacing damaged GI roof sheets on cargo hold. Note: All materials and manpower required for thereplacement of damaged GI roof sheetsare under the scope of contractor.
111Item Code: 111 Repacing damaged handrail pipes: Scope of work includes replacing corroded damaged handrail pipes Note: All materials and manpower required for the replacement of handrail pipes are under the scope of contractor.
112Item Code: 112 Repacing damaged handrail stanchion: Scope of work includes replacing damaged handrail stanchion Note: All materials and manpower required for the replacement of handrail stanchion are under the scope of contractor.
113Item Code: 113 Repacing damaged cable trays: Scope of work includes replacing damaged cable trays in barge. Note: All materials and manpower required for the replacement of cable trays are under the scope of contractor.
114Item Code : 114 Cleaning of scupper & discharge lines Scope of work includes cleaning of Holding tank & bio tanks, clearing off any blockages in the discharge lines & scuppers. Note: All materials and manpower required for the cleaning of scupper and discharge lines of the barge (as mentioned above) are under scope of contractor.
115Item Code: 115 Replacement of viinyl flooring in wheel house & accommadation deck in the barge. Note: All materials and manpower required for the replacement of the vinyl flooring in the barge are under the scope of contractor.
116Item Code :116 Repair of damaged propellers Scope of work includes carrying out the repair works of the existing damaged propellers of the barge as per the recommendations of Classification agency/KIV/FACT.
117Item Code: 117 Executing miscellanenous works which are not mentioned in the schedule of work.
118Item Code: 118 Providing service of 100T Mobile Crane for removing the LAG Bullets from Barge for carrying out the repair of the hull in the regions below the bullets. Note: Slings, tools & tackles required for lifting the bullets under the scope of contractor.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail