Fertilisers And Chemicals Travancore Limited has published Tender For Dry Docking Of Fact Barge Pragatiyan-2023. Submission Date for this Tender is 12-01-2023. Rough Finishing Tools Tenders in ernakulam Kerala. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 23-Dec-2022 | Corrigendum-Technical | Technical Bid | 05-01-2023 |
2 | 05-Jan-2023 | Corrigendun_Date Extension | Date | 12-01-2023 |
3 | 07-Jan-2023 | Technical corrigendum | Technical Bid | 12-01-2023 |
Sl. No. | Item Description |
1 | Item Code 01: Preparation of docking plan for the Pragatiyan barge. |
2 | Item Code : 02 To & Fro Transportation of Pragatiyan barge from Q10 Berth, Willingdon Island to Xontractor"s Yard. Crew required for the navigation of the barge is under the scope of contractor. |
3 | Item Code: 03 Dry Docking of Pragatiyan barge as per the approved docking plan |
4 | Item Code 04: Dock Hire Charges of the Yard. |
5 | Item Code 05: Wharfage Charges of the Yard. |
6 | Item Code 06: Undocking of Pragatiyan barge from contractor"s yard after the completion of the repair works. |
7 | Item Code 07: Shore Power Supply- 3 Phase, 415 V,50Hz. |
8 | Item Code 08: Emptying Diesel & Oil tanks in the barge. Providing closed containers and space in the yard for storing the drained diesel & oil from the tanks in the barge. Refilling diesel to the barge after completion of the repair works. Note : Entire materials & manpower required for the emptying, storing & refilling of Diesel & Oil tanks in the barge are under the scope of contractor. |
9 | Item Code 09: High pressure water jet cleaning of barge after dry docking: All accessible spaces of the barge shall be cleaned by using high pressure water cleaning. External surfaces shall be free of dirt, marine growths, barnacles etc.. Sludge,muck,debris & mud in ballast tanks, bilge, cargo area, sea chest, fresh water tanks,fuel Tanks, store Area etc.. shall be cleared and disposed off to shore Note: Entire materials & manpower required for cleaning of the barge are under the scope of contractor. |
10 | Item Code 10: Gas free certification of the diesel tanks by Yard. |
11 | Item Code 11: Performing Ultrasound Thickness Gauging (UTG) at areas recommended by the surveyor. Rate to be quoted per point gauging by Ultrasound thickness guage. Note: Entire materials, equipment(Ultrasound thickness guage) & manpower required for performing the thickness measurement are under the scope of contractor. |
12 | Item Code 12: Steel Plate Renewal- Steel Plate renewal includes replacement of associated beams, channels, angles, stiffeners etc.. connected to the plates. Areas that are marked by Classification society/KIV/FACT for steel renewal shall be repaired by Contractor. All material used for the steel renewal works shall be confirming to IRS Grade A. Only welders who have qualified the WQT shall be assigned for the repair works. NDT tests like RT,UT,DP,MPI etc.. if required after the carrying out the repair works shall be under the scope of contractor. Note: Entire materials & manpower required for the steel plate renewal works of the barge are under the scope of contractor. |
13 | Item Code 13: Renewal of Anodes: All Type A ( 8 kg) zinc anodes on the barge shall be replaced. Replaced anodes shall be of class approved and shall contain zinc content of atleast 98%. Note: Entire materials & manpower required for replacing Type A zinc anodes are under scope of contractor. |
14 | Item Code 14: Renewal of Anodes: All Type B ( 5 kg) zinc anodes on the barge shall be replaced. Replaced anodes shall be of class approvedand shall contain zinc content of atleast 98%. Note: Entire materials & manpower required for replacing Type B zinc anodes are under scope of contractor. |
15 | Item Code 15: Renewal of Anodes: All Type C ( 3 kg) zinc anodes on the barge shall be replaced. Replaced anodes shall be of class approvedand shall contain zinc content of atleast 98%. Note: Entire materials & manpower required for replacing Type C zinc anodes are under scope of contractor. |
16 | Item Code 16: Replacement of damaged "D" type hollow fenders (Base : 150 mm x 150 mm) on the Barge. Damaged Fasteners of "D" tpe hollow fenders shall also be replaced by contractor. Note: Entire materials & manpower required for the replacement of D-fender are under the scope of contractor. |
17 | Item Code 17: Fore peak space cleaning: Fore peak space shall be cleaned and made ready for Classification agency/KIV Inspection. Sludge,muck,debris & mud in the fore peak space shall be cleared and disposed off to shore Note: Entire materials & manpower required for the cleaning of Fore peak space shall be under the scope of contractor. |
18 | Item Code 18: Cargo hold cleaning: Cargo hold shall be cleaned and made ready for Classification agency/KIV Inspection. Sludge,muck,debris & mud in the cargo hold shall be cleared and disposed off to shore. Note: Entire materials & manpower required for the cleaning of cargo hold space shall be under the scope of contractor. |
19 | Item Code 19: Ballast Tank Cleaning: Ballast Tanks shall be cleaned and made ready for the Classification agency/KIV Inspection. Sludge, muck, debris & mud in ballast tanks shall be cleared and disposed off to shore. Note: Note: Entire materials & manpower required for the cleaning of Ballast Tanks shall be under the scope of contractor. |
20 | Item Code 20: Chain Locker & Store space cleaning- Chain Locker & Store spaceshall be cleaned and made ready for Classification agency/KIV inspection Sludge,muck,debris, oil, grease & mud in the chain locker & Store space shall be cleaned & disposed off to shore. Note: Entire materials & manpower required for the cleaning of Chain Locker & Store space shall be under the scope of contractor. |
21 | Item Code21: Fresh water Tanks Cleaning- Fresh water tanks shall be cleaned and made ready for Classification agency/KIV Inspection. Sludge,muck,debris and mud in fresh water tanks shall be cleared & disposed off to shore. Note: Entire materials & manpower required for the cleaning of fresh water tanks shall be under the scope of contractor. |
22 | Item Code 22: Fuel Oil Tanks Cleaning: Fuel oil tanks shall be cleaned and made ready for Classification agency/KIV Inspection. Sludge & muck in the fuel oil tanks shall be cleared & disposed off to shore. Note: Entire materials & manpower required for the cleaning of fuel oil tanks shall be under the scope of contractor. |
23 | Item Code 23 Sea Chest: Sea Chest to be opened and cleaned. Mud, muck & Sludge to be removed from the sea chest and disposed ashore. Gratings to be inspected and cleaned. All fasteners of the gratings to be replaced. Note: Entire materials & manpower required for the cleaning & repair works in Sea Chest shall be under the scope of contractor. |
24 | Item Code 24: Supplyof starboard & port side propellers as per drg No. VM/FEW/001 Material of Construction: Mn Bronze Gr.Cu 1. Propellers supplied shall be of class approved. |
25 | Item Code 25: Propeller- Removal of existing propellers of the barge from the propeller shaft.Repalcing it with the new propellers. New propellers shall be of class approved. Fastners & Gaskets used in the hub and sealing flange to be replaced with new ones. Note: Entire materials and manpower required for the replacement of the propellers are under scope of contractor. |
26 | Item Code 26: Propeller Shafts: Propeller shafts to be removed from the stern tube. Entire shaft surface shall be DP tested to check whether any surface cracks or abrasion marks or striations are present. If cracks or striations are found, these shall be suitably repaired by welding. Deflection of the shafts to be measured and confirmed within limits. If not, bend correction to be done. Threaded portion and keyways on shaft to be inspected.Any damages on these portions to be repaired. Aft & Forward bearing of the propeller shafts to be replaced with new one prior to fixing of the shaft. New bearings shall be of class approved. Rope guards on the shaft shall be checked for any damages. Damages,if any, shall be repaired. All fasteners to be replaced with new ones. Entire fasteners used for fixing the key, bearings, Gland Follower, Rope guard & Stub shaft shall be of new ones and confirming to specifications mentionedin Drg No: VM/FEW/001/301. Balancing of the propellers are to be done prior to fixing of the shafts. Note: Entire materials and manpower required for the repair works( as mentioned above) in propeller shaft are under the scope of contractor. |
27 | Item Code 27 Rudder: Rudder Blade, Rudder Stock & Tillershall be completely removed and inspected. Rudder Blade coupling bolts to be replaced.Any damages on the rudder blade shall be rectified. Entire surface of the rudder stock shall be DP tested to check whether any surface cracks or abrasion marks or striations are present. If cracks or abrasion marks or striations are found, these shall be suitably repaired by welding. Deflection of the rudder stock to be measured and confirmed within limits. If not, bend correction and of the shaftsto be done. Threaded portion and keyways on rudder stock to be inspected. Any damages on these portions shall berepaired. Upper & Lower bearing of the rudder stock shall be replaced. Bearing housing located at both upper and lower side shall be checked for any damages. Damages, if any, shall be repaired. Tiller & Tiller Rod shall be inspected for any damages. Any damages found shall be suitable repaired. All fasteners to be replaced with new ones. Fasteners replaced shall be confirming to the specifications mentioned in Drg no.VM/FEW/001/208 & VM/FEW/001/208A Note: Entire materials & manpower required for the repair works (as mentioned above) of the rudder, rudder stock & tiller are under the scope of contractor. |
28 | Item Code 28: Steering System: Hydraulic Lines of the steering system shall be checked for any leakages and damages. If any damages are found in the hydralic lines, same shall be replaced with new ones of same pressure rating. Leakages, if any , at coupling ends of line shall be arrested. Hydraulic cylinder for actuating the rudders shall be overhauled. All seals ( Piston seals, Piston rod seals, Cushion seals, Cylinder Head seals etc..) & wear strips/rings shall be replaced. Piston rod, Piston, tie-rods, Barrel & Heads shall be inspected for any damages. Directional control valves/Servo valves /relief valves in the steering system to be inspected & Overhauled. O-rings in directional control valves/Servo valves to be changed. Solenoids of the valves to be checked for the actuation. Solenoids to be replaced if actuation of the spool is not done properly. Valve seats in the relief valves to replaced and pressure tested to the required pressure. Hydraulic Pumpto be removed from Port side engine drive and overhauled. Seals & bearings in the helm pump & engine driven hydraulic pump shall be replaced with new ones. Fresh Hydraulic oil to be filled in the lines and steering fluid tank by the contractor after carrying out required maintenance works. Note: Entire materials and manpower required for the overhauling works(as mentioned above) of the steering system are under the scope of contractor. |
29 | Item Code 29: Electrical System: Main switch board, all junction box circuit breakers, control panels ofequipment on deck, wheel house and engine room to be thoroughly examined. Damaged cables to be repaired and replaced. Payment for the cables procured shall be paid extra against the document evidence. Safety measures in the electrical system like overload trip, reverse current trip, low voltage trip and interlock between the breaker are to be shown to the surveyor. Note: Entire materials and manpower required for the inspection, repair works(as mentioned above) & testing of the electrical system are under the scope of contractor. |
30 | Item Code 30: Inspection & testing of fire sensors/alarm, Smoke sensor &bilgesensor/alarm: The sensors and alarms shall be inspected for proper working condition. If sensons/alarms are found to be not operating, same shall be repaired or replaced with with new ones. Contractor shall arrange the new sensors/alarms, if needed to be replaced based on the recommendation from classification agency. Payment for the procurement of the sensors/alarm shall be paid extra against the document evidence. Note: Entire materials and manpower required for the inspection, repair works(as mentioned above) & testing of the sensors/alarm are under the scope of contractor. |
31 | Item Code 31: Anchor : Anchor and anchor chain shall be thoroughly cleaned by chipping and scrapping. Swivels, shackles,stud links & open links of the anchor chain shall be inspected for the damages. All moving components of the anchor to be freed and anchor to be painted with 2 coats of bismatic paint. Note: Entire materials and manpower required for the repair works of anchor and anchor chains (as mentioned above) are under the scope of contractor. |
32 | Item Code 32: Windlass: Windlass shall be completely dismantled and overhauled. All bearings & pins shall be lubricated. All brake linings & clutches plates to be inspected for any damages. Any damaged bearings, brake lining & clutch plates shall be replaced as per the recommendation of the Classification agency/KIV/FACT. Payment for the replaced items shall be paid extra against the document evidence. Note: Entire materials and manpower required for the overhauling works (as mentioned above) of windlass are under the scope of contractor. |
33 | Item Code: 33 150 NB,ASTM SCH40, Seamless/MS Class C -ERW pipes Removal of damaged piping, erection of new piping & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 150 NB pipe ( as mentioned above) are under the scope of contractor. |
34 | Item Code: 34 100 NB, MS -Galvanised Removal of damaged piping, erection of new piping & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 100 NB pipe ( as mentioned above) are under the scope of contractor. |
35 | Item Code: 35 65 NB,ASTM SCH40, Seamless/MS Class C -ERW pipes Removal of damaged piping, erection of new piping & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 65 NB pipe ( as mentioned above) are under the scope of contractor. |
36 | Item Code: 36 50 NB,ASTM SCH40, Seamless/MS Class C -ERW pipes Removal of damaged piping, erection of new piping & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 50 NB pipe ( as mentioned above) are under the scope of contractor. |
37 | Item Code: 37 40 NB,ASTM SCH40, Seamless/MS Class C -ERW pipes Removal of damaged piping, erection of new piping & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 40 NB pipe ( as mentioned above) are under the scope of contractor. |
38 | Item Code: 38 32 NB,ASTM SCH40, Seamless/MS Class C -ERW/GI pipes Removal of damaged piping, erection of new piping & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 32 NB pipe ( as mentioned above) are under the scope of contractor. |
39 | Item Code: 39 25 NB,ASTM SCH40, Seamless/MS Class C -ERW/GI pipes Removal of damaged piping, erection of new piping & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 25 NB pipe ( as mentioned above) are under the scope of contractor. |
40 | Item Code: 40 20 NB,ASTM SCH40, Seamless/MS Class C -ERW/GI pipes Removal of damaged piping, erection of new piping & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 20 NB pipe ( as mentioned above) are under the scope of contractor. |
41 | Item Code: 41 15 NB,ASTM SCH40, Seamless/MS Class C -ERW/GI pipes Removal of damaged piping, erection of new piping & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 15 NB pipe ( as mentioned above) are under the scope of contractor. |
42 | Item Code: 42 Scope of work includes joint preparation, fitup & welding of 150 NB, ASTM SCH40, Seamless/ MS Class C-ERW, pipe joints. Note: Entire materials & manpower required for the welding of 150 NB, ASTM SCH40,Seamless/ MS Class C-ERW pipe joints are under the scope of contractor. |
43 | Item Code: 43 Scope of work includes joint preparation, fitup & welding of 100 NB, MS- Galvanised pipe joints. Note: Entire materials & manpower required for the welding of 100NB, MS- Galvanised pipe joints are under the scope of contractor. |
44 | Item Code : 44 Scope of work includes joint preparation, fitup & welding of 65 NB, ASTM SCH40, Seamless/ MS Class C-ERW, pipe joints. Note: Entire materials & manpower required for the welding of 65 NB, ASTM SCH40,Seamless/ MS Class C-ERW pipe joints are under the scope of contractor. |
45 | Item Code: 45 Scope of work includes joint preparation, fitup & welding of 50 NB, ASTM SCH40, Seamless/ MS Class C-ERW, pipe joints. Note: Entire materials & manpower required for the welding of 50 NB, ASTM SCH40, Seamless/ MS Class C-ERW pipe joints are under the scope of contractor. |
46 | Item Code : 46 Scope of work includes joint preparation, fitup & welding of 40 NB, ASTM SCH40, Seamless/ MS Class C-ERW, pipe joints. Note: Entire materials & manpower required for the welding of 40 NB, ASTM SCH40,Seamless/ MS Class C-ERW pipe joints are under the scope of contractor. |
47 | Item Code : 47 Scope of work includes joint preparation, fitup & welding of 32 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints. Note: Entire materials & manpower required for the welding of 32 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints are under the scope of contractor. |
48 | Item Code : 48 Scope of work includes joint preparation, fitup & welding of 25 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints. Note: Entire materials & manpower required for the welding of 25 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints are under the scope of contractor. |
49 | Item Code : 49 Scope of work includes joint preparation, fitup & welding of 20 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints. Note: Entire materials & manpower required for the welding of 20 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints are under the scope of contractor." |
50 | Item Code : 50 Scope of work includes joint preparation, fitup & welding of 15 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints. Note: Entire materials & manpower required for the welding of 15 NB, ASTM SCH40, Seamless/ MS Class C-ERW/GI Class C-ERW pipe joints are under the scope of contractor. |
51 | Item Code: 51 150 NB Removal of damaged elbows, erection of new elbows & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 150 NB elbows are under the scope of contractor. |
52 | Item Code: 52 65 NB Removal of damaged elbows, erection of new elbows & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 65 NB elbows are under the scope of contractor. |
53 | Item Code: 53 50 NB Removal of damaged elbows, erection of new elbows & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 50 NB elbows are under the scope of contractor. |
54 | Item Code: 54 40 NB Removal of damaged elbows, erection of new elbows & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 40 NB elbows are under the scope of contractor. |
55 | Item Code: 55 32 NB Removal of damaged elbows, erection of new elbows & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 32 NB elbows are under the scope of contractor. |
56 | Item Code: 56 25 NB Removal of damaged elbows, erection of new elbows & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 25 NB elbows are under the scope of contractor. |
57 | Item Code: 57 20 NB Removal of damaged elbows, erection of new elbows & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 20 NB elbows are under the scope of contractor. |
58 | Item Code: 58 15 NB Removal of damaged elbows, erection of new elbows & hydrotesting of replaced portion. Note: Entire materials & manpower required for the replacement of 15 NB elbows are under the scope of contractor. |
59 | Item Code: 59 150 NB Removal of damaged flanges, erection of new flanges & hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (150 NB, ASTM SCH40, Seamless/ MS Class C-ERW) Note: Entire materials & manpower required for the replacement of 150 NB flanges are under the scope of contractor. |
60 | Item Code: 60 65 NB Removal of damaged flanges, erection of new flanges & hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (65 NB, ASTM SCH40, Seamless/ MS Class C-ERW) Note: Entire materials & manpower required for the replacement of 65 NB flanges are under the scope of contractor. |
61 | Item Code: 61 50 NB Removal of damaged flanges, erection of new flanges & hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (50 NB, ASTM SCH40, Seamless/MS Class C-ERW) Note: Entire materials & manpower required for the replacement of 50 NB flanges are under the scope of contractor. |
62 | Item Code: 62 40 NB Removal of damaged flanges, erection of new flanges & hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (40 NB, ASTM SCH40, Seamless/ MS Class C-ERW) Note: Entire materials & manpower required for the replacement of 40 NB flanges are under the scope of contractor. |
63 | Item Code: 63 32 NB Removal of damaged flanges, erection of new flanges & hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (32 NB, ASTM SCH40, Seamless/ MS Class C-ERW /GI Class C -ERW) Note: Entire materials & manpower required for the replacement of 32 NB flanges are under the scope of contractor. |
64 | Item Code: 64 25 NB Removal of damaged flanges, erection of new flanges & hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (25 NB, ASTM SCH40, Seamless/ MS Class C-ERW /GI Class C -ERW) Note: Entire materials & manpower required for the replacement of 25 NB flanges are under the scope of contractor. |
65 | Item Code: 65 20 NB Removal of damaged flanges, erection of new flanges & hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (20 NB, ASTM SCH40, Seamless/ MS Class C-ERW /GI Class C -ERW) Note: Entire materials & manpower required for the replacement of 20 NB flanges are under the scope of contractor. |
66 | Item Code: 66 15 NB Removal of damaged flanges, erection of new flanges & hydrotesting of replaced portion. MOC of the replaced flange shall be confirming to the specifications of associated piping (15 NB, ASTM SCH40, Seamless/ MS Class C-ERW /GI Class C -ERW) Note: Entire materials & manpower required for the replacement of 15 NB flanges are under the scope of contractor. |
67 | Item Code: 67 150 NB Basket Type Strainers Scope of work includes complete dismantling of the basket strainer, Cleaning, Replacement of all gaskets & Refixing of Basket type Strainer. Note: Entire materials & manpower required for the overhauling works (as mentioned above) of the 150 NB basket type strainers are under the scope of the contractor. |
68 | Item Code: 68 65 NB Angle type mud boxes Scope of work includes complete dismantling of the angle type mud boxes, Cleaning, Replacement of all gaskets & Refixing of mud boxes. Note: Entire materials & manpower required for the overhauling works (as mentioned above) of the 65 NB angle type mud boxes are under the scope of the contractor. |
69 | Item Code: 69 50 NB Angle type mud boxes Scope of work includes complete dismantling of the angle type mud boxes, Cleaning, Replacement of all gaskets & Refixing of mud boxes. Note: Entire materials & manpower required for the overhauling works (as mentioned above) of the 50 NB angle type mud boxes are under the scope of the contractor. |
70 | Item Code: 70 Overhauling of 150 NB Right Angle Stop Valve MOC: CS-GM Scope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..), replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works. Note: Entire materials & manpower required for the overhauling works of 150NB Right Angle Stop Valve(as mentioned above) are under the scope of contractor. |
71 | Item Code: 71 Overhauling of 150 NB Gate Valve. MOC: CI-SS Scope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..), replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works. Note: Entire materials & manpower required for the overhauling works of 150NB Gate Valve(as mentioned above) are under the scope of contractor. |
72 | Item Code: 72 Overhauling of 65 NB Gate Valve. MOC: CI/GM-GM Scope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..), replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works. Note: Entire materials & manpower required for the overhauling works of 65 NB Gate Valve(as mentioned above) are under the scope of contractor. |
73 | Item Code: 73 Overhauling of 50 NB Gate Valve.MOC: CI-GM Scope of work includes removal of valves from pipe lines,complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..), replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works. Note: Entire materials & manpower required for the overhauling works of 50 NB Gate Valve(as mentioned above) are under the scope of contractor. |
74 | Item Code: 74 Overhauling of 40 NB Gate Valve.MOC: CI-GM Scope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..), replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works. Note: Entire materials & manpower required for the overhauling works of 40 NB Gate Valve(as mentioned above) are under the scope of contractor. |
75 | Item Code: 75 Overhauling of 65 NB SDNR Right angle/ Straight Globe Valve. MOC: CS/CI-GM Scope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..), replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works. Note: Entire materials & manpower required for the overhauling works of 65 NB SDNR Right Angle/StraightGlobe Valve(as mentioned above) are under the scope ofcontractor. |
76 | Item Code: 76 Overhauling of 50 NB SDNR Right Angle/Straight Globe Valve. MOC: CI-GM Scope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..),replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works. Note: Entire materials & manpower required for the overhauling works of 50 NB SDNR Right Angle/Straight Globe Valve (as mentioned above) are under the scope of contractor. |
77 | Item Code: 77 Overhauling of 40 NB SDNR Right Angle/ Straight Globe Valve. MOC: CS/CI-GM Scope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..), replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works. Note: Entire materials & manpower required for the overhauling works of 40 NB SDNR Right Angle/Straight Globe Valve(as mentioned above) are under the scope of contractor. |
78 | Item Code: 78 Overhauling of 65 NB Fire Hydrant Valves. MMD approved Scope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..),inspecting instantaneous couplings, replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion ofoverhauling works. Note: Entire materials & manpower required for the overhauling works of 65 NB Fire Hydrant Valves(as mentioned above) are under the scope of contractor. |
79 | Item Code: 79 Overhauling of 40NB Ball Valves. MOC: GS-GM Scope of work includes removal of valves from pipe lines, complete dismantling cleaning, replacement of all gaskets (eg: body-bonnet gasket, Flange gaskets etc..),replacement of valve seats and Gland packing, hydrotesting of the valves & refixing of the valves to the pipelines after completion of overhauling works. Note: Entire materials & manpower required for the overhauling works of 40 NB Ball Valves(as mentioned above) are under the scope of contractor. |
80 | Item Code: 80 Replacement of 40NB Gate Valve. MOC: Brass Scope of work includes removal of damaged valves from pipe lines, fixing of new valves in pipelines and hydrotesting. Note: Entire materials & manpower required for the replacement of the 40 NB Gate Valves are under the scope of contractor. |
81 | Item Code: 81 Replacement of 32 NB Gate Valve. MOC: Brass Scope of work includes removal of damaged valves from pipe lines, fixing of new valves in pipelines and hydrotesting. Note: Entire materials & manpower required for the replacement of the 32 NB Gate Valves are under the scope of contractor. |
82 | Item Code: 82 Replacement of 25 NB Gate Valve. MOC: Brass Scope of work includes removal of damaged valves from pipe lines, fixing of new valves in pipelines and hydrotesting. Note: Entire materials & manpower required for the replacement of the 25 NB Gate Valves are under the scope of contractor. |
83 | Item Code: 83 Replacement of 20 NB Ball Valve. MOC: SS Scope of work includes removal of damaged valves from pipe lines, fixing of new valves in pipelines and hydrotesting. Note: Entire materials & manpower required for the replacement of the 20 NB Ball Valves are under the scope of contractor. |
84 | Item Code: 84 Replacement of 15 NB Ball Valve. MOC: SS Scope of work includes removal of damaged valves from pipe lines, fixing of new valves in pipelines and hydrotesting. Note: Entire materials & manpower required for the replacement of the 15 NB Ball Valves are under the scope of contractor. |
85 | Item Code: 85 Replacement of 50 NB NR Valve Flap Type. MOC: SS Scope of work includes removal of damaged valves from pipe lines, fixing of new valves in pipelines and hydrotesting. Note: Entire materials & manpower required for the replacement of the 50NB NR Valve Flap Type are under the scope of contractor. |
86 | Item Code: 86 Replacement of 20 NB NR Valve Flap Type. MOC: SS Scope of work includes removal of damaged valves from pipe lines, fixing of new valves in pipelines and hydrotesting. Note: Entire materials & manpower required for the replacement of the 20 NB NR Valve Flap Type are under the scope of contractor. |
87 | Item Code: 87 Replacement of 15 NB NR Valve Flap Type. MOC: SS Scope of work includes removal of damaged valves from pipe lines, fixing of new valves in pipelines and hydrotesting. Note: Entire materials & manpower required for the replacement of the 15 NB NR Valve Flap Type are under the scope of contractor. |
88 | Item Code: 88 65 NB Strum boxes Scope of work includes complete dismantling of the Strum Boxes, Cleaning, Replacement of all gaskets & Refixing of mud boxes. Note: Entire materials & manpower required for the overhauling works (as mentioned above) of the 65 NB strum boxes are under the scope of the contractor. |
89 | Item Code: 89 50 NB Strum boxes Scope of work includes complete dismantling of the Strum Boxes, Cleaning, Replacement of all gaskets & Refixing of mud boxes. Note: Entire materials & manpower required for the overhauling works (as mentioned above) of the 50 NB strum boxes are under the scope of the contractor. |
90 | Item Code: 90 General Service Pump: General Service pump of the barge is driven by an independent diesel engine. Scope of work includes: 1) Disconnecting engine side drive to the pump 2) Complete dismantling of pump 3) Cleaning of the parts of the pump(casing, impeller etc..) 4) Replacing bearings of the pump with adequate lubrication 5) Replacing oil seals, mechanical seals/gland packing, Lantern rings & Gaskets. 6) Hydrotesting of the pump after assembling. 7) Replacing engine oil, oil filters & air filter of the engine. 8) Cleaning of the head & injectors of the engine. 9) Replacing head to body gasket of engine 10) Connecting assembled pump to engine drive. Size :65 NB MOC: CI-GM-SS Flow rate : 25Cum/hr @ 30m Note: Entire materials and manpower required for theoverhauling of General Service Pump(as mentioned above) are under the scope of contractor. |
91 | Item Code: 91 Bilge Pump: Scope of work includes: 1) Disconnecting the electrical motor which drives the pump. 2) Complete dismantling of pump. 3) Cleaning of the parts of the pump(casing, impeller etc..). 4) Replacing bearings of the pump with adequate lubrication. 5) Replacing oil seals, mechanical seals/gland packing, Lantern rings & Gaskets. 6) Replacement of motor bearings & Seals. 7) Checking any damages to the insulation & windings of the motor. 8)Hydrotesting of the pump after assembling. 9) Connecting assembled pump to motor. Size :65 NB MOC: CI-GM-SS Flow rate : 25Cum/hr @ 30m Note: Entire materials and manpower required for the overhauling of Bilge Pump (as mentioned above) are under the scope of contractor. |
92 | Item Code 92: Hand Pump(Semirotary): Scope of work includes complete dismantling of pump, cleaning, replacement of bearing & seals, assembling & hydrotesting of the pump for checking any leakages. Size:40NB MOC: CI/Brass Note: Entire materials & manpower required for the overhauling of Hand pumps(as mentioned above) are under the scope of contractor.. |
93 | Item Code 93: Mono Block Pump: Scope of work includes : 1) Complete dismantling of pump and motor. 2) Cleaning of the Pump 3) Replacement of bearing & seals of the Pump 4) Inspecting both rotor and stator sides of the motor for any damages. 5) Replacing bearings of the motor. 6) Assembling both pump & motor after repair works. 7) Hydrotesting of the pump for checking any leakages. Power : 1/2 HP Electric Driven Note: Entire materials & manpower required for the overhauling of Monoblock pumps(as mentioned above) are under the scope of contractor. |
94 | Item Code: 94 Scope of work includes completed dismantling, cleaning & replacing gaskets of the following ball type vent heads in the barge 100NB- 2 nos 80 NB -4 nos 65 NB - 2 nos Note: All materials and manpower required for the overhauling works of ball type vent heads (as mentioned above) are under the scope of contractor. |
95 | Item Code: 95 Scope of work includes servicing & carrying out functional tests of the following sounding pipes in the barge. 80 NB - 4 nos Note: All materials and manpower required for the overhauling works of sounding pipes (as mentioned above) are under the scope of contractor. |
96 | Item Code: 96 Providing assistance to the OEM of the main engines & diesel generators of barge during the overhauling works. |
97 | Item Code: 97 Painting of Keel to Water Line Scope of work includes Surface preparation by grit blasting(SA 2.5) and application of paint as per the painting specification attached. Note: All materials and manpower required for the painting of the Keel to Waterline are under the scope of contractor. Payment shall be made as per the actual area of completion of the work. |
98 | Item Code: 98 Painting of Water Line to Deck Scope of work includes Surface preparation by grit blasting(SA 2.5) and application of paint as per the painting specification attached. Note: All materials and manpower required for the painting of the Water line to Deck are under the scope of contractor. Payment shall be made as per the actual area of completion of the work. |
99 | Item Code: 99 Painting of Cargo Hold. Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached. Note: All materials and manpower required for the painting of the Cargo Hold are under the scope of contractor. Payment shall be made as per the actual area of completion of the work. |
100 | Item Code: 100 Painting of Weather Deck. Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached. Note: All materials and manpower required for the painting of the Weather deck are under the scope of contractor. Payment shall be made as per the actual area of completion of the work. |
101 | Item Code: 101 Painting of Superstructure,Mast, Funnel, Deck fittings & machinery: Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached. Note: All materials and manpower required for the painting of the superstructure,mast,funnel deck fittings and machinery are under the scope of contractor.Payment shall be made as per the actual area of completion of the work. |
102 | Item Code: 102 Painting of Machinery Space, stores & access passage: Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached. Note: All materials and manpower required for the painting of the Machinery Space, stores & access passage are under the scope of contractor. Payment shall be made as per the actual area of completion of the work. |
103 | Item Code: 103 Painting of potable water tanks: Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of 2 coats ( each coat of 50 microns DFT) food grade paint. Note: All materials and manpower required for the painting of the potable water tanks are under the scope of contractor.Payment shall be made as per the actual area of completion of the work. |
104 | Item Code: 104 Painting of Ballast Tanks,cofferdams, void spaces and chain locker: Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached. Note: All materials and manpower required for the painting of the Ballast Tanks,cofferdams, void spaces and chain locker are under the scope of contractor. Payment shall be made as per the actual area of completion of the work. |
105 | Item Code: 105 Painting of Other floors: Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached. Note: All materials and manpower required for the painting of the Other floors are under the scope of contractor. Payment shall be made as per the actual area of completion of the work. |
106 | Item Code: 106 Painting of funnel internals : Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached. Note: All materials and manpower required for the painting of the funnel internals are under the scope of contractor. Payment shall be made as per the actual area of completion of the work. |
107 | Item Code: 107 Painting of anchor chain & anchor: Scope of work includes surface preparaton by chipping, scrapping & wire brush cleaning. Application of paint as per the painting specification attached. Note: All materials and manpower required for the painting of the anchor chain & anchor are under the scope of contractor. Payment shall be made as per the actual area of completion of the work. |
108 | Item Code: 108 Painting of miscellaneous items: Scope of work includes Repainting of barge name, classification agency notations, Registration No, plimsoll mark & other markings for the identification of the parts in the barge. Note: All materials and manpower required for the painting of the miscellaneous items(as mentioned above) are under the scope of contractor.. |
109 | Item Code: 109 Repacing sprinkler pipe lines: Scope of work includes replacing corroded sprinkler system pipes (50 NB, SA 106 Gr.B) including sprinklers Note: All materials and manpower required for the replacement of sprinkler system pipe lines are under the scope of contractor. |
110 | Item Code: 110 Replacing damaged GI roof sheets on cargo hold. Note: All materials and manpower required for thereplacement of damaged GI roof sheetsare under the scope of contractor. |
111 | Item Code: 111 Repacing damaged handrail pipes: Scope of work includes replacing corroded damaged handrail pipes Note: All materials and manpower required for the replacement of handrail pipes are under the scope of contractor. |
112 | Item Code: 112 Repacing damaged handrail stanchion: Scope of work includes replacing damaged handrail stanchion Note: All materials and manpower required for the replacement of handrail stanchion are under the scope of contractor. |
113 | Item Code: 113 Repacing damaged cable trays: Scope of work includes replacing damaged cable trays in barge. Note: All materials and manpower required for the replacement of cable trays are under the scope of contractor. |
114 | Item Code : 114 Cleaning of scupper & discharge lines Scope of work includes cleaning of Holding tank & bio tanks, clearing off any blockages in the discharge lines & scuppers. Note: All materials and manpower required for the cleaning of scupper and discharge lines of the barge (as mentioned above) are under scope of contractor. |
115 | Item Code: 115 Replacement of viinyl flooring in wheel house & accommadation deck in the barge. Note: All materials and manpower required for the replacement of the vinyl flooring in the barge are under the scope of contractor. |
116 | Item Code :116 Repair of damaged propellers Scope of work includes carrying out the repair works of the existing damaged propellers of the barge as per the recommendations of Classification agency/KIV/FACT. |
117 | Item Code: 117 Executing miscellanenous works which are not mentioned in the schedule of work. |
118 | Item Code: 118 Providing service of 100T Mobile Crane for removing the LAG Bullets from Barge for carrying out the repair of the hull in the regions below the bullets. Note: Slings, tools & tackles required for lifting the bullets under the scope of contractor. |