Name of Work: Instrumentation & Monitoring for raising speed for existing operational Airport Express Line
Sl. No.
Item Description
1
Continuous monitoring and measurements for in time evaluation of Vibrations for a period of 6 months
2
Stages
3
i) Installation of Continuous Monitoring Unit for 6 months along with online alarm system as per measurement scheme by M/s ARTS dated 04.12.2019 & 23.02.2022. (Scope of Works for Continuous Monitoring i.e Measurement Scheme for measurement of Strain on Clips & Rails, Vibrations on Rails & Plinths is defined under PS)ii) Real time evaluation of vibrations referenced to passing train and verification against the limit criteria.iii) Submission of Final report ondetailed Analysis of measured data.
4
Verification Measurements to identify and verify the dynamic loads on tension Clamps.
5
Stages
6
i)Installation of Verification measurement unitas per measurement scheme by M/s ARTS dated 04.12.2019 & 23.02.2022.ii) Record vibrations and displacements induced by passing trains for 3 days.Iii) Evaluation of dynamic loads at each measurement cross-section, analysis, assessment, comparision of results and Submission of Final report.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.