Tender For Renovation Of Pond And Cc Pavement In Gingee Block
Tender Value
23.16 Lakhs
Estimated cost
Bid Submission
28 Dec 2022
0 days left
EMD
23200
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
gingee → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Renovation of Pond and CC pavement in Gingee Block
BOQ
| Sl. No. | Item Description |
| 1 | Rejuvenation of colony kulam @ Sethavarai Pt |
| 2 | Clearing the scrub jungles including all labour charges for all labour charges etc complete. |
| 3 | Earthwork excavation in all classes of soils except hard rock rerqurining blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidentail charges and sheeting, shoring. |
| 4 | Earthwork excavation and depositing on bank with initial lead of 10mand initial lift of 2m in hard stiff clay,stiff block cotton soil , hard red earth, shales, murrams,gravel stoney earth and earth mixed with small size boulders etc.SS 20B. |
| 5 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 6 | Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete. |
| 7 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 8 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 9 | Colour Washing two Coat with Exterior Emulsion Paint including all charges |
| 10 | Wheep Holes |
| 11 | Provision for Name Board Charges |
| 12 | Photographic charges for taking photos in various stages before execution, during execution and after execution |
| 13 | Providing CC road 133 @ Irular colony in sethavarai Pt |
| 14 | Earth work excavation for foundation in all classes of soils except hard rock requiring blastingwith initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth, shale murums, gravel stoneyearth, and earth mixed with 50 % fair sized boulders, and hard graveily soil, in foundation.as per SS 20 B |
| 15 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 16 | Centering charges for corewall including all cost of labour charges |
| 17 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 18 | Photographic charges for taking photos in various stages before execution, during execution and after execution |
| 19 | Providing CC road 23m@ SHG building street in AD colony Sethavarai Pt |
| 20 | Earth work excavation for foundation in all classes of soils except hard rock requiring blastingwith initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth, shale murums, gravel stoneyearth, and earth mixed with 50 % fair sized boulders, and hard graveily soil, in foundation.as per SS 20 B |
| 21 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 22 | Centering charges for corewall including all cost of labour charges |
| 23 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 24 | Providing Vertical Soakpit with Drainage @ Narayanapuram in Sethavarai |
| 25 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. |
| 26 | Filling Soak Pit with Following Materials |
| 27 | 225mm Boulder |
| 28 | 40mm Metal |
| 29 | 20mm Metal |
| 30 | 10-12mm Metal |
| 31 | Cost and supply of follwing 180mmPVC Pipes |
| 32 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 33 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications. |
| 34 | Plastering cm 1;5 -12mm Thick including the cost and conveyance of all materials and cost of all labour charges etc., complete. |
| 35 | Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete. |
| 36 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. |
| 37 | Towards cost of RCC Ring |
| 38 | Towards cost of RCC Cover Slab |
| 39 | Towards cost of Precast Slab |
| 40 | Photographic charges for taking photos in various stages before execution, during execution and after execution |
| 41 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
AI Tender Summary
Tender Timeline
Dec 15, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedDec 28, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedDec 28, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender