|
| 1 | Supply Portion |
| 2 | 11 KV Feeder (Reconductoring) (256.09 CKm) |
| 3 | 9.0 m S.T.P. (410:SP-31) |
| 4 | Galvanised Pole top bracket |
| 5 | Galvanised Clamp for Pole top Bracket |
| 6 | Galvanised Cross arm (75X40)mm |
| 7 | Galvanised Back clamp for X-arm |
| 8 | Galvanised 2.2m D.P. channel X-arm (75X40) mm |
| 9 | 11 KV Disc. Insulator (Complete Set i/c Tension clamps, Hardware) |
| 10 | 11 KV Insulator with Pin |
| 11 | ACSR Conductor (Rabbit) |
| 12 | Isolator with X-arm etc. |
| 13 | Stay Set complete with stay wire, base plate, stay rod etc. |
| 14 | Galvanised Stay Clamp |
| 15 | Galvanised Bracing for D.P. Structure, 50X50X6mm M.S. Angle |
| 16 | Galvanised Clamp for D.P. Bracing |
| 17 | Galvanised Anti Climbing device complete |
| 18 | Earthing set complete with G.I. wire |
| 19 | Guarding at crossing with G.I. wire |
| 20 | Nuts, Bolts, MS flat as support for item No.3 jointing sleeves etc. |
| 21 | Al. Binding wire, UPG clamps etc. |
| 22 | Sundries like pole painting, Danger plate, Number Plate etc. |
| 23 | 11 KV Feeder (Bifurcation) (0 CKm) |
| 24 | 9.0 m S.T.P. (410:SP-31) |
| 25 | Galvanised Pole top bracket |
| 26 | Galvanised Clamp for Pole top Bracket |
| 27 | Galvanised Cross arm (75X40)mm |
| 28 | Galvanised Back clamp for X-arm |
| 29 | Galvanised 2.2m D.P. channel X-arm (75X40) mm |
| 30 | 11 KV Disc. Insulator (Complete Set i/c Tension clamps, Hardware) |
| 31 | 11 KV Insulator with Pin |
| 32 | ACSR Conductor (Rabbit) |
| 33 | Isolator with X-arm etc. |
| 34 | Stay Set complete with stay wire, base plate, stay rod etc. |
| 35 | Galvanised Stay Clamp |
| 36 | Galvanised Bracing for D.P. Structure, 50X50X6mm M.S. Angle |
| 37 | Galvanised Clamp for D.P. Bracing |
| 38 | Galvanised Anti Climbing device complete |
| 39 | Earthing set complete with G.I. wire |
| 40 | Guarding at crossing with G.I. wire |
| 41 | Nuts, Bolts, MS flat as support for item No.3 jointing sleeves etc. |
| 42 | Al. Binding wire, UPG clamps etc. |
| 43 | Sundries like pole painting, Danger plate, Number Plate etc. |
| 44 | AB Cable - replacement of LT bare conductors |
| 45 | AB Cable (3x95+1x70)Sq.mmandSteel Tubular pole (Horizontal Configuration)- Reconductoring (102 CKm) |
| 46 | 8.0 m S.T.P.(410:SP-14) |
| 47 | M.S. cross arm (75X40) mm, 510 mm long |
| 48 | Back clamp for cross arm |
| 49 | Dead end fittings for AB Cable with bare messenger wire complete with Eye hook as per Construction Standards : |
| 50 | Suspension fittings for AB Cable with bare messenger wire complete with Eye hook as per Construction Standards : |
| 51 | AB Cable (3x95+1x70)Sq.mm |
| 52 | SMC Box for 200 Amps 300x200x100 box size minimum alongwith 25X8 Aluminium Bus Bar for 3 phase connection of 4 Nos. |
| 53 | Insulation piercing connector suitable for AB Cable (95/70 Sq.mm. Main & Branch) as per TS & Construction Standard. |
| 54 | Earthing set complete with G.I. wire. |
| 55 | G.I. wire. No 10 S.W.G. (90 Kg. per 1.09Km.) |
| 56 | Stay set complete with stay wire and insulator clamp etc. |
| 57 | Bolts & Nuts with washer |
| 58 | Sundaries,Pole painting, Danger plate, Number Plate etc. |
| 59 | AB Cable (3x70+1x50)Sq.mm and Steel Tubular pole (Horizontal Configuration) - Reconductoring (240 CKm) |
| 60 | 8.0 m S.T.P.(410:SP-14) |
| 61 | M.S. cross arm (75X40) mm, 510 mm long |
| 62 | Back clamp for cross arm |
| 63 | Dead end fittings for AB Cable with bare messenger wire complete with Eye hook as per Construction Standards : |
| 64 | Suspension fittings for AB Cable with bare messenger wire complete with Eye hook as per Construction Standards : |
| 65 | AB Cable (3x70+1x50)Sq.mm |
| 66 | SMC Box for 200 Amps 300x200x100 box size minimum alongwith 25X8 Aluminium Bus Bar for 3 phase connection of 4 Nos. |
| 67 | Insulation piercing connector suitable for AB Cable (70/50 Sq.mm. Main & Branch) as per TS & Construction Standard. |
| 68 | Earthing set complete with G.I. wire. |
| 69 | G.I. wire. No 10 S.W.G. (90 Kg. per 1.09Km.) |
| 70 | Stay set complete with stay wire and insulator clamp etc. |
| 71 | Bolts & Nuts with washer |
| 72 | Sundaries,Pole painting, Danger plate, Number Plate etc. |
| 73 | AB Cable (3x50+1x35)Sq.mmandSteel Tubular pole (Horizontal Configuration) - Reconductoring (159 CKm) |
| 74 | 8.0 m S.T.P.(410:SP-14) |
| 75 | M.S. cross arm (75X40) mm, 500 mm long |
| 76 | Back clamp for cross arm |
| 77 | Dead end fittings for AB Cable with bare messenger wire complete with Eye hook as per Construction Standards : |
| 78 | Suspension fittings for AB Cable with bare messenger wire complete with Eye hook as per Construction Standards : |
| 79 | AB Cable (3x50+1x35)Sq.mm |
| 80 | SMC Box for 200 Amps 300x200x100 box size minimum alongwith 25X8 Aluminium Bus Bar for 3 phase connection of 4 Nos. |
| 81 | Insulation piercing connector suitable for AB Cable (50/35 Sq.mm. Main & Branch) as per TS & Construction Standard. |
| 82 | Earthing set complete with G.I. wire. |
| 83 | G.I. wire. No 10 S.W.G. (90 Kg. per 1.09Km.) |
| 84 | Stay set complete with stay wire and insulator clamp etc. |
| 85 | Bolts & Nuts with washer |
| 86 | Pole Muffing |
| 87 | Sundaries,Pole painting, Danger plate, Number Plate etc. |
| 88 | 11 kV MVCC (Medium Voltage Conductor Cover) (30 CKm) |
| 89 | AL 59 ACS (52.88 sq. mm.) Rabbit conductor covered |
| 90 | Tension clamp for 11kV |
| 91 | IPC (for connecting bare to CC) |
| 92 | IPC (for connecting CC to CC) |
| 93 | Insulated Cable Tie |
| 94 | Mid Span Joint |