Tender For Works Contract For Nethimedu / Town Section In Town / O&M Division - Earthwork Excavation1.2 Mt.Average Depth X 0.6Mt Average Widthin Hard Stiff Clay, Shales Murran Gravel, Stoney Earth And Mixed With Small Sizes Boulders And Gravelly Soil For Sand Bedding As Directed By The Engineer-In-Charge At Site And Including Providing Labour For Watch Providing Sand Bedding With Good Quality Of Manufactured Sand To A Depth Of 0.15M In The Excavated Cable Trenchincluding Cost Of Sand, Labour, And Labour Charges For Transport, Lead, Lift, Etc., Complete 4 Loading Of Ht Cable Drum From Stores Using Crane Lorry, Safe Transportngto Site And Safe Unloading At The Worksite Without Any Damage Using Crane Lorry.This Includes Labour For Loading, Unloading, Transporting And Rentfor Crane Lorry, All T&P Such As Crowbars, Dshackle Etc., That Must Be Brought By The Contractor. 5 Layingofht Ug Cable In The Excavated Trench Including Drawing The Cablethrough Rcc / G.I.Pipe Wherever Necessary Such As Road Crossing Etc., Without Any Damage, Sealing The Cable With End Caps With Suitable Ends Which Includes Provision Of Signal Board, Danger Board, Light Etc And Also Loading, Transporting Charges, Unloading , Tools And Plants, Rollers Etcetc., The Contractor Must Bring All Tools And Plants And Rollers. 6 Drawal From Stores And Laying Of R.C.C.V Troughs In Th Excavated Cable Trench At Worksite Including Transportation Without Any Damage .This Includes All Lead, Lift , Safe Loading, Safe Unloading And Transport Etc. ( Note: Damage If Any Due To Careless Handling, The Cost Of V Trough Will Be Be Deducted ) 7 Refilling The Cable Trench And Duct With Excavated Earth In Layer, Ramming And Consolidating Properly In Layers Of 6 And The Top Surface Brought In Line With The Existing Surface Including Labour, Lead, Lift Etc., Complete 8 Fixingof Cable Termination Including Supply Of Clamp At 3 Locations Along Thestructure After Completion Of Termination Joint.Termination Joint Will Be Done By Cable Jointer Separately.But This Includes Releasing Of Cable Drum From The Cable Pit / Structure , Providing And Releasing Of Tent, Transporting Of Tent From Office To Site And Back Fixing The Cable At Structure And Back Filling The Cable Pit Etc. 9 Excavation Of Pit ( For Providing Straight Joint ) Of Size 3.6 M X 2.4 M X 1.3 M And Excavation Of Cable Trench For 3 M On Either Side Ofthe Joint Location For Releasing The Cable.This Includes Labour For Providing And Releasing Of Tent At Joint Location, Transporting Of Tent From Office To Site And Back, Removing And Refixing Of V Troughs, Fixing Thejoint Works &Carefully Fixing The Joint In Position After Completing Of Jointing And Refilling The Trench With The Excavated Soil. 10 Labour For Loading, Unloading Of Iron Scrap In Lorry / Drum For Devolution ( The Scrap May Be Devolutedby The Department Lorry ) 11 Erection Ofclass B Gi / Pvc Pipes 160 Mm Dia For Encasing The Ht Cableat Termination Structure And P&T Crossing Etc. ( Note: Normally Pvc Pipes Will Be Used For Termination Structure. Only In Specific Locations The Gi Pipe Will Be Used As Per The Advise Of Site Engineer Incharge ) 12 Erection Of160 Mm Dia Isi Pvc Pipe For Roadand Drainage Crossingfor The Ht Cable Laying ( Note: Normally Pvc Pipes Will Be Used For Termination Structure. Only In Specific Locations The Gi Pipe Will Be Used As Per The Advice Of Site Engineer Incharge ) 13 Loading, Unloading , Transporting And Erection Of Rcc Cable Marker Of Standard Size Including Painting The Word Tneb / Ug Cable And Other Notations As Per The Site Engineers Instruction. ( Includes Excavation And Laying ) 14 Erection Of 33 Kv 3C X 400 Sq.Mm Xlpe Ug Cable Outdoor End Termination Kit-Heat Shrinkable Type, Including Charges For Cable Jointer. 15 Erection Of 33 Kv 3C X 400 Sq.Mm Xlpe Ug Cable Straight Joint Kit-Heat Shrinkable Type, Including Charges For Cable Jointer. 16 Erection Of 3 Way Rmu With Concrete Structure 17 Erection Of 9 Mtr Psc Pole With Excavation 18 Fixing Of Tapping Cross Arm 19 Paving, Stringing, Binding ( 3Wire ) 7 / 4.09 Acsr Conductor 20 Excavation Of Stay Pit 21 Erection Of Stay Set 22 Stay Concreting Including Cost Of Materials And Labour 23 Erection Of 11Kv Strain Disc Insualtor