Name of Work: MW(Cons.) to Repairing of Tombs of Kutub-i-Alam at Vatva, Ahmedabad
Sl. No.
Item Description
1
Execution of work and supply of materials under following items
2
Cost and supply of lime in air tight plastic bag including all cost of transportation up to site. Loading, unloading etc. all complete as directed by site in-charge.
3
Cost and supply of good quality sand including all cost of transportation up to site. Loading, unloading etc. all complete as directed by site in-charge.
4
Cost and supply of surkhi free from dust including all cost of transportation up to site. Loading, unloading etc. all complete as directed by site in-charge.
5
Cost and supply of well burnt thin bricks of “220 x105 x 45 mm” size including all cost of transportation up to site, loading, unloading etc. all complete and as directed by site in-charge.
6
Cost and supply of gud (jaggery) including all cost of transportation up to site. Loading, unloading etc. all complete as directed by site in-charge.
7
Cost and supply of gallnut including all cost of transportation up to site. Loading, unloading etc. all complete as directed by site in-charge.
8
Cost and supply of dhrangadhra stone blocks of different size including all cost of transportation up to site. Loading, unloading etc. all complete as directed by site in-charge.Average size:1. 0.60 to 1.00 x 0.20 to 0.30 x 0.20 to 0.352. 0.40 to 0.45 x 0.50 to 0.55 x 0.35 to 0.403. 1.05 to 1.10 x 0.30 to 0.35 x 0.40 to 0.454. 2.50 to 2.60 x 0.45 to 0.50 x 0.40 to 0.45Actual size of stone will be provided by the Sr. CA, Ahmedabad at the time of commencement of work.
9
Cost and supply of tractor trip on rent including driver and fuel etc. complete for disposal of debris up to 10 km away from site including loading, unloading etc. all complete as directed by site in-charge.
10
Towards removal of cement concrete floor laid inplace of stone flooring with original bed concrete including stacking of useful material & disposing of rubbish etc. all complete and as directed by site in-charge.
11
Towards laying of cement concrete bed using 1:3:6(1: cement, 3: sand, 6: course aggregate) with proper mixing, laying, consolidation including all cost of materials and labour charges etc. all complete as per specifications and as directed by site in-charge.
12
Towards laying of stone flooring using 10 cm thickdhragadhra stone block of average size 0.60x 0.45 x 0.10 in L.S.S. mortar 1:1:1 (1 lime : 1 sand, 1: surkhi )including cost of all materials and labour charges etc.all complete and as directed by site in-charge.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.