| 1 | Jungle clearance in borrow area, building premises, flanks and slopes on the roads, canals and embankment by removing the grass and the jungle bushes from the top including weeding out shrubs including roots and levelling etc. complete as per direction of E/I.5.1.3.1Part B Sl. 2.02Part A |
| 2 | E/w in exavationin canal by the hydraulic exacavator as per designed section in all kind of soil, soil mixed with kankar, pebbles, and boulders upto 300 mm size and disposal of spoil upto 10 m with all lift all compelete as per specification and direction of E/I. (7.1.43.1) WRD. Part -B |
| 3 | E/W in Exavation of canal by the hydrulic exacavator as per designed section in all kind of soil , soil mixed with pebble, and boulder upto 300 mm size and disposal of spoil upto 10 m with all lead and lift with all compelete job as per specification and direction of E/I. (7.1.43.2) Part -B |
| 4 | Labour Charge for taking out distrubed boulder pitching or rip-rap or rock toe etc. and cleaning the surface and stacking the same within a lead of 100 M as per specification and direction of E/I. 7.7.41 |
| 5 | E/W in excavation ofcutoff trenches by hydraulic excavator in ordinary soil (vide classification of soil item A) disposal of excavated earthso obtained ( 50 m away from the edge of the trenches) with initial lead of 150m and initial lift of 1.5M as per specification and direction of E/I.WRD Part- B 5.9.1 |
| 6 | Providing P.C.C./R.C.C. M-150 with nominal mix of (1:2:4) in various component of dam foundation with approved quality of 20mm graded coarse aggregate of required graded as per disign approved quality of sand of requisite F.M (2.5 to 3) washed and screened excluding cost of shuttening or form work as well of reinforcement its cutting, bending, binding and placing but including necessary tools and plants and vibr tion, cutting, royalty all taxes etc. complete job as per specification and direction of E/l. BCD 5.3.1.2 |
| 7 | Providing random rubble stone masonary in CM (1:4) in foudation and plinth with hammer dressed stone of less than 0.03 M3 in volume and clean coarse sand of F.M. 2 to 2.5including cost of screening, raking out joints to 20mm depth, curing, taxes and royality etc. complete job as per specificition and direction of E/l. WRD Part-A5.2.28 |
| 8 | Providing P.C.C./R.C.C. M-20 with nominal mix of (1:1.5:3) in various component of dam foundation with approved quality of 20mm graded coarse aggregate of required graded as per disign approved quality of sand of requisite F.M (2.5 to 3) washed and screened excluding cost of shuttening or form work as well of reinforcement its cutting, bending, binding and placing but including necessary tools and plants and vibr tion, cutting, royalty all taxes etc. complete job as per specification and direction of E/l.BCD 5.3.9.1 B.C.D |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete 5.3.17.1 BCD |
| 10 | Providing 25 mm thick cement plaster (1:4) in cement mortar with approved quality of sand of requisite F.M. (2.5 to 3) washed and screenedand its removal royalty and all taxes etc. complete job as per specification and direcition of E/l. WRD 7.5.5 (Comman-Part-A- 5.7.12) |
| 11 | Carriage of Materials :- (i)Cement |
| 12 | (ii)Sand |
| 13 | (iii) Stone Chips |
| 14 | (iv) Stone Boulder |
| 15 | GST 12% |
| 16 | Labour Cess 1% |