|
| 1 | Providing and fixing of pre-fab pine log wood Structure fabricated out of exclusive A class pine wood. All components of structure walls, floor, ceiling, roof and truss made from A- class pine wood duly fitted in T&G/ Dove Tail etc joints without any nails with selamic resistive features. The windows vacuum seted fabricated out of fine wood with double pan high quality glass fitted in shutters with high class quality channels duly painted with epoxy mechanized anti scratch head, water and fire resistant enamel coat as per drawing. The entire door shutters made out high class pine wood solid state paneled with three lever international quality locking arrangements duly enamel coated as per drawing. The roof top covered with high class wallable polyvinyl tiles/ Shingles placed on pine wood planks having feature to with stand a temperature variance of ± 40 degree centigrade as per drawing. The wooden assembly duly polished/coated prime enamelWood coat and water resistant enamel. Floor planks not less than 6mm placed on the wood members of assorted sizes in T&G as per the drawings enclosed.Truss: The pine wood truss should be designed to with stand a dead load of snow from 6-8 feet. The beam purlins and posts should be supported by wooden walls as per drawing. |
| 2 | All above features,Single Storey with wall thickness |
| 3 | 30mm |
| 4 | 35mm |
| 5 | 45mm |
| 6 | 50mm |
| 7 | 70mm |
| 8 | 75mm |
| 9 | 105mm |
| 10 | All above features, Double Storey with wall thickness |
| 11 | 35mm |
| 12 | 45mm |
| 13 | 70mm |
| 14 | 75mm |
| 15 | 105mm |
| 16 | Chainlink Fencing |
| 17 | Earth work in excavation in all Kinds of soil by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth 1.5 m in width as well as 10 sqmon plan) including disposal of excavatedall complete job. |
| 18 | P/S of dry stone soling tightly hand packed under foundation including all leads lifts & all carriage up to site of work complete job. |
| 19 | P/L of cement concrete of specified gradeM-75 (1:4:8) mix using 40mm N/size agg. In foundation /plinth excluding cost of shuttering with all carriages up to site of work complete. |
| 20 | P/L of cement concrete of specified (1:3:6) mix using 40mm N/size agg. In foundation /plinth excluding cost of shuttering with all carriages up to site of work complete. |
| 21 | P/L in position Reinforcement cement concrete of specified grade 1:2:4 excluding cost of shuttering & including all carriage up to site of work complete job. |
| 22 | Reinforcement for RCC work including cutting placing & binding all complete job. |
| 23 | Centering and shuttering including strutting, propping using 12mm thick water proof ply board and removal of form work for foundation with all carriage up to site of work complete job. |
| 24 | Applying of 15mm thick plaster sand in 1:6 mix using I Cement & 6 sand including. Curing complete job. |
| 25 | P/F of angle iron post vertical steel work welded in built up section frame including cutting hoisting in position & applying coat of red oxide & paint including all complete. |
| 26 | P/F of chain-link fencing made from 4mm dia wire of (IS-280) machinewoven both end with mesh of size50x50mm includingRed oxide primer allcomplete job. |
| 27 | P/F of black annealed Barbed wire 2.50mm dia, point wire2.00mm dia, barbs spacing 75+12mm confirming to IS:278 in its entire physical standard, all complete job. |
| 28 | Retaining Wall Plum Concrete |
| 29 | Earth work in excavation in all Kinds of soil by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth 1.5 m in width as well as 10 sqmon plan) including disposal of excavatedall complete job. |
| 30 | P/S of dry stone soling tightly hand packed under foundation including all leads lifts & all carriage up to site of work complete job. |
| 31 | P/L of cement concrete of specified gradeM-75 (1:4:8) mix using 40mm N/size agg. In foundation /plinth excluding cost of shuttering with all carriages up to site of work complete. |
| 32 | P/L of cement concrete of specified (1:3:6) mix using 40mm N/size agg.( using 20% plums)In foundation /plinth excluding cost of shuttering with all carriages up to site of work complete. |
| 33 | P/L in position Reinforcement cement concrete of specified grade 1:2:4 excluding cost of shuttering & including all carriage up to site of work complete job. |
| 34 | Reinforcement for RCC work including cutting placing & binding all complete job. |
| 35 | Centering and shuttering including strutting, propping using 12mm thick water proof ply board and removal of form work for foundation with all carriage up to site of work complete job. |
| 36 | Applying of 15mm thick plaster sand in 1:6 mix using I Cement & 6 sand including. Curing complete job. |
| 37 | P/F of PVC Drain pipe all complete job |
| 38 | Bulk Head Excavation |
| 39 | Earth work in bulk head excavation in all Kinds of soil by mechanical means (Hydraulic excavator)/ manual means over areas) including disposal of excavated all complete job. |
| 40 | P/L of good earth filling with proper ramming watering & proper compaction grass free including all carriage up to site of work all complete job. |