Water Resources and Irrigation Local Bodies Closing in 0 days TDR #35187260

Tender For Ernakulam-Energy Conservation Rki-Energy Conservation Measures At Wtp& Cwph, Maradu Based On The Detailed Energy Audit.

Issued by Local Bodies · kochi, Kerala
Tender Value
21.99 Lakhs
Estimated cost
Bid Submission
13 Dec 2022
0 days left
EMD
50000
Bank guarantee accepted
Document Fee
2760
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
kochi → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Ernakulam-Energy Conservation Rki-Energy Conservation Measures At Wtp& Cwph, Maradu Based On The Detailed Energy Audit.

BOQ

Work Name:REBUILD-JNNURM-WTP& CWPH MARADU ERNAKULAM-Energy Conservation RKI-Energy conservation measures at WTP& CWPH, Maradu based on the detailed energy audit.
Sl. No. Item Description
1Repair and replacement of damaged Butterfly valves
2Removing the nut and bolt of pipeline and removing rubber packing for valve dismantling
3450mm Butterfly valve replacing using chain block and load carrying equipments
4Supply and fixing of new 450mm butterfly valve
5Lighting of Yard at Maradu
6Supply, conveyance, installation, testing and commissioning of pre-wired light fitting of thefollowing types complete with all accessories and lamps etc. in the existing GI pipe and giving connections with required length of 16/0.20mm 3 core copper conductor flex wire conforming to relevant ISS or extending the required length of 16/0.20mm 3 core copper conductor flex wire conforming to relevant ISS or extending the required length of 16/0.20mm 3 core copper conductor flex wire conforming to relevant ISS or extending the original<br>wiring and giving connection etc. as required- 40 W LED
7Supply, fabrication, conveyance and fixing 25 mm B class GI pipe bent to shape / cut andwelded to shape and fixing the same to wall / parapet using clamps as noted along with each size, painting with 2 coats of synthetic enamel paint over a coat of zinc chromate primer, making good the damages, colour washing etc<br>as required (for the installation of outdoor light fittings).
8Supply, laying and clamping of 1 no. PVC insulated and PVC sheathed armoured aluminiumpower cable, 1.1 KV grade of the following sizes using clamps noted along with the cables, spacing of clamps not exceeding 60cms, making good the damages , colour washing etc. as required
9Supply, conveyance, installation, testing and commissioning of pre-wired light fitting of thefollowing types complete with all accessories and lamps etc. in the existing GI pipe and giving connections with required length of 16/0.20mm 3 core copper conductor flex wire conforming to relevant ISS or extending the original<br>wiring and giving connection etc. as required- 50 W LED
10Supply and Fixing of inverter of 2000 VA
11Supply and fixing of inverter of 2000 VA at WTP, Maradu
12Flow meter at Clear water channel
13Supply and fixing of Ultrasonic level sensor for Clear water channel
14Supply and fixing of energy meter and sub meters
15Supply and fixing of digital multi functional energy meter -96mm dia at the secondary side ofthe transformer to monitor the power factor and energy consumption
16Supply and fixing of sub meters at pump panel to measure the power consumption
17Providing CCTV cameras at WTP
18supply and installation of HD Bullet camera 3MP 40M with HD @20fps, 1/2.9" CMOS Sensor ,AHD / TVI / CVI / CVBS Video Output ,Full HD 1080p 4mm Fixed Lens ,IR range :40 m, Night vision Housing Material: Plastic,Support 3D DWDR, Motion detection
19supply and installation of HD Bullet camera 3MP 30M with HD @20fps, 1/2.9" CMOS Sensor ,AHD / TVI / CVI / CVBS Video Output ,Full HD 1080p 4mm Fixed Lens ,IR range :30 m, Night vision Housing Material: Plastic,Support 3D DWDR, Motion detection
20supply and installation of Dom camera 2MP 20M with HD @20fps, 1/2.9" CMOS Sensor ,AHD / TVI / CVI / CVBS Video Output ,Full HD 1080p 4mm Fixed Lens ,IR range :20 m, Night vision Housing Material: Plastic,Support 3D DWDR, Motion detection
21supply and installation of Network video Recorder/Digital video Recorder with 32 CH, 1SATA,Supports AHD/TVI/CVI/CVBS /IP Cameras Supports AHD/TVI Cameras up to 8 MP,CVI up to 4MP Supports H.265 /H.265/H.264 /H.264Supports Smart Playback & Analytics, Supports 2 extra IP ch Supports 3G/4G Wi-Fi, Google drive & Dropbox Cloud Storage<br>Supports video quality detection (VQD)
22supply and installation of Network video Recorder/Digital video Recorder with 16 CH, 1SATA,Supports AHD/TVI/CVI/CVBS /IP Cameras Supports AHD/TVI Cameras up to 8MP, CVI up to 4MPSupports H.265 /H.265/H.264 /H.264Supports Smart Playback & Analytics, Supports 2 extra IP ch Supports 3G/4G Wi-Fi, Google drive & Dropbox Cloud Storage<br>Supports video quality detection (VQD)
23supply and installation of WD 4TB Purple Surveillance Internal Hard Drive (24*7) with The WDPurple drive is designed specifically for 24/7 DVR and NVR surveillance solutions, Every WD Purple Drive Comes With A 3-Year Limited Warranty Built for 24/7, always-on, high-definition security systems. With a supported workload rate of up to 180 TB/yr1 and support for up to 64 cameras.
24supply and installation of WD 2TB Purple Surveillance Internal Hard Drive (24*7) with The WDPurple drive is designed specifically for 24/7 DVR and NVR surveillance solutions, Every WD Purple Drive Comes With A 3-Year Limited Warranty Built for 24/7, always-on, high-definition security systems. With a supported workload rate of up to 180 TB/yr1 and support for up to 64 cameras.
25ssupply and installation of D link rack with cooling fan Backed by rich industry experience and marketunderstanding,we are involved in offering a wide array of D-Link<br>4U Wall Mount Enclosure to ourvalued patrons
26supply and installation of TP linkPOE giga switch with 24 port Highly Efficient & Consumes Low PowerStabilized Output, Surge Protected Over Heat & Voltage Protection Highly Integrated SMPS Switcher I.C Design Over Load Protection Short Circuit Auto
27supply and installation of TP linkPOE giga switch with 8 port Highly Efficient & Consumes Low PowerStabilized Output, Surge Protected Over Heat & Voltage Protection Highly Integrated SMPS Switcher I.C Design Over Load Protection Short Circuit Auto
28supply and installation of TP linkPOE giga switch with 4 port Highly Efficient & Consumes Low PowerStabilized Output, Surge Protected Over Heat & Voltage Protection Highly Integrated SMPS Switcher I.C Design Over Load Protection Short Circuit Auto
29supply and installation of TP link media converter
30supply and installation ofCCTV cat 6 cable with TP-Link cat6 cable is of hybrid type with acombination of Communication and Electrical conductors Copper Braiding , Flame Retardant cable, Supports Hybrid cable
31supply and installation offiber cable
32supply and fixing of RJ 45 connector
33supply and installation of 32 inch LED TV HDMI support with 32 inch display with HDResolution, TCL/MR/UV Connectivity: VGA, Contrast Ratio: 700:1,Power Consumption: 15W (Typical), Stand-by Power: 0.5W, Power supply: 10-240 VAC
34supply of GI post
35Supply ,Erection, Testing and Commissioning of Vaccum feed floor mounted Cabinet Type Chlorinator System at WTP,Maradu
36Supply, Erection Testing and Commissioning of Vacuum feed floor mounted Cabinet Type GasChlorinator system of capacity 0 to 15 kg/hr .The system should consists of Primary Chlorine Gas Filter,Rotometer, Chlorine pressure gauge, water pressure gauge, vacuum pressure gauge (fluid filled)injectorassembly ,chlorine control valve, chlorine pressure gauge connector, vacuum gauge connector andinjector connector water outlet connection to inject the Chlorine Solution, FRP Cabin ,vacuum controlvalve, water control valve ,drain valve etc. Including necessary modification of incoming water line andoutgoing water line for maintaining uninterrupted chlorine supply including cost of motor pump, allspecials and valves and necessary PVC pipes and fittings as per the direction of Departmental officersincluding supply of all mandatory spares and allied works for the successful erection and commissioningwith a guarantee period of 2 years from commissioning
37Pressure grouting of clarifier walls
38PRESSUR GROUTING has to be done where ever necessary at all the water dripping areas,minimum 30 cm interval with non shrinking pressure grouting admixture FOSROC CEBEX 100@250 grams / bag of cement
39Then the treated surface apply two coats of Crystaline water proofing. After curing over thevertical and horizontal surface apply two coats of epoxy based water proofing system. Applying and mixing as per manufacture specifications. The treated surface after 48 hrs shall be checked with the standard water pond test to avoid any seepage/ leakage/dampness
4014.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .

AI Tender Summary

OUR REF NO 35187260
AUTHORITY Local Bodies
TENDER VALUE 21.99 Lakhs
LAST DATE 13-12-2022
Authority
Authority Name Kerala Water Authority
Work Description Ernakulam-Energy Conservation Rki-Energy Conservation Measures At Wtp& Cwph, Maradu Based On The Detailed Energy Audit.
Basic Detail
Tender No E-32/2022-23/EE/PHD/CHN
Bidding Type Tender
Location
City kochi
State Kerala
Key Dates
Publish Date 07 Dec 2022
Submission Date 13 Dec 2022
Open Date 15 Dec 2022
Finance
Tender Value 21.99 Lakhs
Tender Fee 2760
EMD 50000
Exemption Not Available
Document List
d8d1a258-d6b1-4070-9c97-56702893ab50.html
BOQ_781140.xls
KWAGeneralConditionsforeT.pdf
Tendernotice_1.pdf
Tendernotice_2.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Dec 07, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 13, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Dec 15, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

d8d1a258-d6b1-4070-9c97-56702893ab50.html

xls

BOQ_781140.xls

pdf

KWAGeneralConditionsforeT.pdf

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders