Tripura State Electricity Corporation Limited-TSECL has published Tender For Providing Service Connection 3Phase To 25 Nos Dtw Schemes On Partially Turnkey Basis Under Jal Jiban Mission Within The Jurisdiction Of Esd Belonia Esd Rajnagar And Esd Hrishyamukh Under Electrical Division Belonia 2Nd Phase. Submission Date for this Tender is 15-12-2022. Electrification Work Tenders in belonia Tripura. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | 9.0 mtr. Long PCC Pole |
2 | 8.0 mtr. Long PCC Pole |
3 | GI stay set HT 20 SQMMi/c Stay wire (4.0 Kg) , Stay Insulator(1 No), Clamps 50 x 6 mm(4 Nos), Nuts & bolts(2Nos) |
4 | 2.8 mtr. long 100 X 50 X 50 X 6 mm. MS channel sub-station Top 26.6 kg @69.36/Kg i/c supply with (i) 2 (two) nos. clamp of 50x6 mm. MS flat, (ii) nuts and bolts as required |
5 | 2.8 mtr. long 100 X 50 X 50 X 6 mm. MS channel sub-station bracket including drilling of holes as required for Transformer support and supply with (i) 2 (two) nos. clamp of 50x6 mm. MS flat, (ii) nuts and bolts as required 26.6 kg @69.36/Kg |
6 | 0.8 mtr. long 100 X 50 X 50 X 6 mm. MS channel sub-station bracket including drilling of holes as required for Transformer support and supply with (i) 2 (two) nos. clamp of 50x6 mm. MS flat, (ii) nuts and bolts as required 6.80 kg @69.36/Kg |
7 | 2.8 mtr. long 75X40X40X6 mm. MS channel bracket for G.O.S & D.O. fuse unit on double steel tubular pole or PCC pole including supply of i) 2(two) nos. clamp of 50x6 mm. MS flat, (ii) nuts and bolts as required 20.16 kg @69.36/Kg |
8 | 3.1 mtr. long 65 X 65 X 6 mm. MS angle sub-station bracket along with drilling of holes as required for using as G.O.S Handle support and fixing including supply with (i) 2(two) nos. clamps of 50x6 mm MS flat, (ii) nuts and bolts as required 18.00 kg @69.36/Kg |
9 | 0.3 mtr. long 75 X 40 X 40 X 6 mm. MS channel cross arm on steel tubular pole or PCC pole or RS joist with 1 (one) no. clamp of 50x6 mm. MS flat, nuts and bolts as required. 2.16 Kg @ 69.36/- KG |
10 | 1.2 mtr. long 75 X 40 X 40 X 6 mm. MS channel cross arm on single steel tubular pole or PCC pole or RS joist including supply with (i)1 (one) no. clamp of 50x6 mm. MS flat, (ii) nuts and bolts as required8.64 Kg @69.36/- KG |
11 | 1.5 mtr. long 65 X 65 X 6 mm. MS angle guard cross arm on Single steel tubular pole or PCC pole or RS joist including supply with (i) 1 (one) no. clamp of 50x6 mm. MS flat, (ii) nuts and bolts as required 8.70 Kg @69.36/- KG |
12 | 2.2 mtr long 75X40X40X6mm M.S. Chanel cross arms on PCC /S.T poles with M.S. Clamps, nuts and Bolts etc as required. 15.84 Kg @69.36/- KG |
13 | 2.5 mtr. long 65 X 65 X 6 mm. MS angle guard cross arm on Double steel tubular pole or PCC pole or RS joist structure including supply with (i) 2 (two) no. clamp of 50x6 mm. MS flat, (ii) nuts and bolts as required 14.5 Kg @69.36/- KG |
14 | 3.2 mtr. long 65 X 65 X 6 mm. MS angle cross braceing on Double steel tubular pole or PCC pole or RS joist structure including supply with (i) 2 (two) no. clamp of 50x6 mm. MS flat, (ii) nuts and bolts as required 18.56 Kg @69.36/- KG |
15 | 1.8 mtr. long 65 X 65 X 6 mm. MS angle horizentle cross braceing on Double steel tubular pole or PCC pole or RS joist structure including supply with (i) 2 (two) no. clamp of 50x6 mm. MS flat, (ii) nuts and bolts as required 10.44 Kg @69.36/- KG |
16 | 11 KV 320 mm CD Polymer composite Pin Insulator as per the direction of the engineer In- Charge |
17 | 11 KV Polymeric Disc Insulator with fittings, nuts & bolts, washers etc. as required |
18 | Supply, testing, erection and commissioning of ACSR Weasel ConductorforjumperingincludingPGClamps,bi-metallic connectors, hardware etc as per Drawing & Scope of works as required as per IS.Technical Specification, approved |
19 | Supply, testing, erection and commissioning of 8 SWG GI wire for gaurding/earthing as per technical specifications, approved drawings and scope of works. as required as per IS. |
20 | 8 SWG GI wire for gaurding/earthing as per technical specifications, approved drawings and scope of works. as required as per IS. |
21 | Erection of protective Guard/ Cross lacing for 11 KV line GI wire 8/10 SWG as per the technical specification |
22 | Bi-metalic Lugs 95 sq mm |
23 | Bi-metalic Lugs 50 sq mm |
24 | 100 Amps kit kat Cut-out as per Technical specifications. |
25 | 70 Sqmm PVC cable as per the technical specifications, IS. |
26 | 16 Sqmm PVC cable as per the technical specifications, IS. |
27 | 2.5MeterLong,40mmdiaGIpipeMake-Tata/Jindalasper Techinical Specification |
28 | 60 Kg Salt and 55 Kg Charcoal per (For one Pit) |
29 | Triple pole (3 phase), 12 KV, 200 Amp. GOS unit (Porcelin type) for operation in 11 KV, 50 Hz, AC system as per relevant IS specification along with fixing of nuts & bolts and bimetallic lugs for necessary connection with the transformer HT bushing by ACSR. as per the direction of the Engineer-In-charge. |
30 | Triple pole (3 phase), 12 KV, 200 Amp. drop out fuse unit (Porcelin type) for operation in 11 KV, 50 Hz, AC system as per relevant IS specification along with fixing of nuts & bolts and bimetallic lugs for necessary connection with the transformer HT bushing by ACSR. as per the direction of the Engineer"s In-charge. |
31 | 9 KV, 5 KA single pole metal oxide gapless surge type LA suitable for nominal system voltage of 11 KV, 3 phase, 50 Hz, AC supply Nominal Creepage distance 300mm. conforming to ISS:3070/1985 as per the direction of the Engineer"s In-charge. |
32 | Earthing with GI Pipe 2.5 Mtr long and 40 mm dia including excavation, refilling with alternate layer of salt & Charcoal as per the drawing |
33 | Laying of 8 SWG wire at 300 MM below the ground label for earthing of Sub-station equipment from the earth electrode |
34 | Carriage of 11/0.430, 3-Phase 63KVA by mechanical transport from site/ store/ workshop to working site vis-a-vis including loading, unloading and placing on base, as required. C) Beyond 50KM |
35 | Commissioning of AI. wound three Phase ,63KVA, 50 Hz AC, out doortype11/0.433KV,distributiontransformercompletewith necessary accessories and Transformer oil conforming to relevant ISS and required connection by ACSR from 11 KV line to Transformer via G.O.S & D.O.F fixing with of 2 ( two ) Nos strain Screw and nuts & bolts as reqd. as per the direction of Engineer-in-charge and approved drawing. |
36 | Wooden Plank with necessary clamp & Nuts & bolts |
37 | LT Shackle Insulators (4X4.5)? |
38 | Straps & Bolts for Shackle Insulators |
39 | 4-wire LT Spacer as per the Technical Specification. |
40 | Erection of protective Guard/ Cross lacing for 415/240 V line GI wire 8/10 SWG as per the technical specification |
41 | 5 wire C Bkt |
42 | Reel Insulators as per the Technical Specification. |
43 | Providing of three phase service connection laying of PVC cable from nearby electrical Pole to the premises up to 35 Meter in length supported by GI-wire, Reel insulator i/c fitting, fixing of Energy Meter (Department supply which shall be collected from respective Electrical Division) as required as per the direction of the Engineer In-charge. |