Tender For Construction Of Jahangi Water Supply Scheme Of Block Augustmuni, Rudra Prayag-Uttarakhand

Drinking Water And Sanitation Department has published Tender For Construction Of Jahangi Water Supply Scheme Of Block Augustmuni. Submission Date for this Tender is 16-12-2022. RCC Work Tenders in Rudra Prayag Uttarakhand. Bidders can get complete Tender details and download the document.




Tender Notice

35169613
Tender For Construction Of Jahangi Water Supply Scheme Of Block Augustmuni
Open Tender
Indian
Uttarakhand
Rudra Prayag
16-12-2022

Tender Details

Construction Of Jahangi Water Supply Scheme Of Block Augustmuni-Construction Of Jahangi Water Supply Scheme Of Block Augustmuni Consisting Ofsource Work, Supply Mains, Rcc Cwrs, Distribution Systems, Fhtc And All Other Appurtenant Works Etc. Including Supply & Cartage Of Allmaterials, Labor And T&P Etc. Complete For Proper Completion Of Works. It Is Also Including Testing, Commissioning With 6 Months Trail & Run And Handing Over To Ujs For Its Maintenance

Key Value

Document Fees
INR 4720 /-
EMD
INR 116000.0 /-
Tender Value
INR 58 Lakhs /-

BOQ Items

Name of Work: Construction of Jahangi Water Supply Scheme of Block Augustmuni consisting ofSource work, supply mains, RCC CWRs, distribution systems, FHTC and all other appurtenant works etc. including supply & cartage of allmaterials, labor and T&P etc. complete for proper completion of works. It is also including testing, commissioning with 6 months trail & run and handing over to UJS for its maintenance.
Sl. No. Item Description
1SOURCE WORKS
2Construction ofIntake chamber to fulfill therequierment of water demandincluding Supply of all materials, labour,carting of material T&P etc complete as per direction of Engineer in charge
3Constructionof RCC BFGincluding all materials, labour, T&P etc. required for proper completion of work
4Construction of R.C.C cross wall Gadhera tapping arrangment per running meter length excess over 4m gadhera including supply of all materials, labour, T&P etc. complete.
5Constructionof Roughening Filter with filling of supporting & filter media including all materials, cartage labour, T&P etc. required for proper completion of work
6supply, carting , laying true to aligment and gradient, jointing and fixing of following GI (M) pipe lines including all specials fittings, white lead, hemp and other appurtenant works etc. making necessary connections with existing laid pipe line including connectingwith existing Private & Othe house hold Tap Connections with control plate/ferrule devices etc completeand make properfunctioning, confirming to IS:1239 at site of works. (The contractor have to survey the site, take levels with total station, measure the length of pipe with metallic tape on prescribed alignment and submit the design of supply main & distribution main for checking of thickness of pipebefore ordering for supply of pipe). On completion of work the laid length of pipe will be deemed eligible for supply. The respective amount for quantity of surplus supply of pipes (which remained unlaid or unutilized) will be deducted from final bill and surplus quantity of pipes will be the property of contractor.)
715 mm dia - GI (M)
820 mm dia - GI (M)
925 mm dia - GI (M)
1032 mm dia - GI (M)
1140 mm dia - GI (M)
12Dismentling and relaying of following sizes of G.I. Pipes Medium quality confirming to IS:1239 at site of works including all labour T&P etc. complete for proper complition of work & also for making FHTC laid from existing newly laid pipe lines under scheme as per direction &instruction of given by Engineer -In-Charge.
1315mm dia
1420mm dia
1525mm dia
1632mm dia
1740mm dia
18Excavation of earth for pipeline in following strata lift upto 1.5 m lead upto 30 m including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour, T & P etc.all complete assumingthat 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soilmixed with shingle, bajari and boulders and rest 25% will be in medium rock
19Soil mixed with boulder (SMB)
20Medium Rock (MR)
21Supply and fixing of Wheel Valve/ Gate Valve of the following sizes including cartage of materials, labour, T&P etc. complete
2225mm dia
2340 mm dia
24Supply Cartage and fixing of Sluice Valve/Air Valve of the following sizes including cartage of materials, labour, T&P etc. complete
2520mm dia (CI Air Valve)
26Supply of all materials,labours ,T.&P. etc. and making ferrule connection to provide FHTC to the consumers from existing w/s scheme including all material, labour, T&P etc. complete excluding water meter & pipe as per instruction given by Engineer - In-charge.
27ConstructingWheel Valve Chamber 60x60x75 cm, inside with 75 class designation brick work in cement mortar 1:4 (1 cement :4 coarse) including supply, cartage of all material, labour, T&P etc complete for Sluice Valve/Air Valve with C.I. surface box 100 mm. as per standard design. with locking arrangement.
28construction of following capacity RCC semi sunk reservoir, including testing and commissioning for water tightness, cost of all pipes/fittings etc. required for inlet/outlet/washout/byepass, excavation for foundation,0.60 M wide appron with 15 cm PC drain,required sluice valve chamber, fixing water level indicator, lighening arrester, fixing 03 rowse railing at top dome, MS ladder (inside and outside of CWR), MS manhole with locking arrangement, ventilator with mosquito net,two coat snowcem/distemper/painting including wall writing as per instructions given by E"ngineer In Charge, carting & supply of scafolding & shuttering, making supply and cartage of all material, Labour and T&P etc,complete. (Cap. in KL)
292KL
307.50KL
31Supply cartage and fixing ofBucket type chlorinator of 25 Liter capacity at top of service raservoirs.
32Concrete with 2 Cm gauge stone ballast, local sand and cement in proportion of 1:2:4 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
33Concrete with 4 Cm gauge stone ballast, local sand and cement in proportion of 1:4:8 in foundation and floors including supply of all materials, labour and T&P etc.required for proper completion of work.
34R.R. Stone masonary with 1:6 cement and sand mortar including cartage and supply of all materials,labours,T&P etc. complete for proper completion of work.
35R.R.Stone masonry laid in dry including cartage and supply of all materials,labours,T&P etc. required for proper completion of work.
36Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require:
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail