|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 1 Osqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: All kinds of soil |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering , all works upto plinth level( 1 : 4 : 8)1 cement 4 coasre sand 8 stone aggregate grade , with 40mm nominal size . crushed |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering , all works upto plinth level( 1 : 3 : 6 ) with 20% boulders 1 cement 3 coasre sand 6 stone aggregate grade , with 20mm nominal size .crushed |
| 4 | Brick work with common burnt clay F.P.S (Non-modular) brick of class designation 75 in foundation and plinth in 1:6(1 cement : 6coarse sand) |
| 5 | Extra for brick work in Super structure above plinth level upto floor V level (By manual means) |
| 6 | Half Brick Masoonarywith common burnt clay(Non-modular) brick of class designation 75 in foundation and plinth including curing in cement mortar1:4(1 cement : 4coarse sand) |
| 7 | Extra for brick work in Super structure above plinth level upto floor V level |
| 8 | Centering and shittering including strutting propping etc and removal of form workFoundation footingbases of columns etc |
| 9 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, butteresses, string or laces, courses, parapets, coping, bed blocks, anchor blocks, plain window sills,sunken floors fillets etc. upto floor five level, excluding the cost of centring, shuttering and finishing.1:1.5:3(1 cement: 1.5 coarse sand :3 graded stone aggregate 20mm nominal size)(Crushed) |
| 10 | 12 mm cement plaster on the rough side of single or half brick wall of mix 1:6 ( 1 cement 6 fine sand ) |
| 11 | Steel work welded in built up section, trusses andframed works including cutting , hoising, fixing in position and applying a priming coat of approved steel primer and paintingall complete |
| 12 | Finishing walls with water proofing cement paint of requried shade Newwork(one or more coat )applied @2.20.kg/10 sqm over priming coat of primer applied @0.80 litres/10 sqm complete including cost of priming coat |
| 13 | Carriage 0f materialby mechanical transportincluding loading ,unloading and stacking completed sand lead up to 77 km(MS TRISHI) |
| 14 | Carriage 0f materialby mechanical transportincluding loading ,unloading and stacking completed stone aggregates below 40 mm size lead up to 22 km |
| 15 | Carriage 0f materialby mechanical transportincluding loading ,unloading and stacking completed brick lead up to 97 km |
| 16 | Carriage 0f materialby manual labourincluding loading ,unloading and stacking completed stone aggregates lead below 40 mm lead upto2 km av |
| 17 | Carriage 0f materialby manual labourincluding loading ,unloading and stacking completedsand lead upto 2 km av |
| 18 | Carriage 0f materialby manual labourincluding loading ,unloading and stacking completed brick lead upto 2 km av |
| 19 | Carriage 0f materialby manual labourincluding loading ,unloading and stacking completed stone lead upto 500 m av |
| 20 | Carriage 0f materialby mechanical transportincluding loading ,unloading and stacking completed sand lead up to 85 km(MS WARD NO. 09 NARORE) |
| 21 | Carriage 0f materialby mechanical transportincluding loading ,unloading and stacking completed stone aggregates below 40 mm size lead up to 30 kmQty vide item no.2 =5.57 x 0.90 = 5.01 cumQty videitem no.3 = 33.05 (80%) x 0.90 = 23.79 cumQty vide item no.9= 0.70 x 0.90 = 0.63 cum Total = 29.43 cum |
| 22 | Carriage 0f materialby mechanical transportincluding loading ,unloading and stacking completed brick lead up to 109 km |
| 23 | Carriage 0f materialby manual labourincluding loading ,unloading and stacking completed stone aggregates lead below 40 mm lead upto2 km av |
| 24 | Carriage 0f materialby manual labourincluding loading ,unloading and stacking completedsand lead upto 2 km av |
| 25 | Carriage 0f materialby manual labourincluding loading ,unloading and stacking completed brick lead upto 2 km av |
| 26 | Carriage 0f materialby manual labourincluding loading ,unloading and stacking completed stone lead upto300 m av |
| 27 | Carriage 0f materialby mechanical transportincluding loading ,unloading and stacking completed sand lead up to 80 km (MS Banjala) |
| 28 | Carriage 0f materialby mechanical transportincluding loading ,unloading and stacking completed stone aggregates below 40 mm size lead up to 25 km |
| 29 | Carriage 0f materialby mechanical transportincluding loading ,unloading and stacking completed brick lead up to 100 km |
| 30 | Carriage 0f materialby manual labourincluding loading ,unloading and stacking completed stone aggregates lead below 40 mm lead upto2 km av |
| 31 | Carriage 0f materialby manual labourincluding loading ,unloading and stacking completedsand lead upto 2 km av |
| 32 | Carriage 0f materialby manual labourincluding loading ,unloading and stacking completed brick lead upto 2 km av |
| 33 | Carriage 0f materialby manual labourincluding loading ,unloading and stacking completed stone lead upto 400 m av |
| 34 | Carriage 0f materialby mechanical transportincluding loading ,unloading and stacking completed sand lead up to 67 km av(MS Lehari) |
| 35 | Carriage 0f materialby mechanical transportincluding loading ,unloading and stacking completed stone aggregates below 40 mm size lead up to 17 km av |
| 36 | Carriage 0f materialby mechanical transportincluding loading ,unloading and stacking completed brick lead up to 79 km |
| 37 | Carriage 0f materialby mechanical transportincluding loading ,unloading and stacking completed stone lead upto 4 km av |
| 38 | Carriage 0f materialby manual labourincluding loading, unloading and stacking completed stone aggregates lead below 40 mm lead upto100 m av |
| 39 | Carriage 0f materialby manual labourincluding loading ,unloading and stacking completedsand lead upto 100 m av |
| 40 | Carriage 0f materialby manual labourincluding loading ,unloading and stacking completed brick lead upto 100 m av |
| 41 | Carriage 0f materialby manual labourincluding loading ,unloading and stacking completed stone lead upto100 m av |
| 42 | Carriage 0f materialby mechanical transportincluding loading ,unloading and stacking completed sand lead up to 68 km |
| 43 | Carriage 0f materialby mechanical transportincluding loading ,unloading and stacking completed stone aggregates below 40 mm size lead up to 18 km |
| 44 | Carriage 0f materialby mechanical transportincluding loading ,unloading and stacking completed brick lead up to 80 km |
| 45 | Carriage 0f materialby mechanical transportincluding loading ,unloading and stacking completed stone lead up to 8 km |
| 46 | Carriage 0f materialby manual labourincluding loading ,unloading and stacking completed stone aggregates lead below 40 mm lead upto500 m av |
| 47 | Carriage 0f materialby manual labourincluding loading ,unloading and stacking completedsand lead upto 500 m av |
| 48 | Carriage 0f materialby manual labourincluding loading ,unloading and stacking completed brick lead upto 500 m av |
| 49 | Carriage 0f materialby manual labourincluding loading ,unloading and stacking completed stone lead upto500 m av |
| 50 | NOTE: - The rate quoted shall include all the carriages and lifts if any. |