| 1 | ZERO METER FLOOR AREAUnit # 6. Cleaning & sweeping of following area of(i)Unloading bay (between A to B row and column No. 1 to 2), (357m2)(ii)Area near main entrance door (between B to C rowand column no.1 to 2 & between A to B row and column no.2 to 3, 6 to 7), (78.53 m2). Unit #7.(i)Unloading bay (between A to B row and column No.20 to 22), (714m2)(ii)Area near main entrance door (between B to C rowand column no.20 to 21 & between A to B row and column no.18 to 19, 13A to 14), (78.53 m2). |
| 2 | Cleaning & sweeping of floor and the side walls in front of lift door of unit 6&7, (552m2). |
| 3 | Ground floor Cleaning & sweeping (between A to C row and column no. 2 to 11 for unit 6 & column 11 to 20 for unit 7), (6448m2). |
| 4 | Cleaning of side wall from \"O\" meter to 8 meter floor including ceiling & all structure (cleaning includes removal of jallas from the wall & structure also for Unit 6 & 7), (3120m2). |
| 5 | Cleaning of long pipe trenches, various drains pits, sump pits at -4 Mtr. level in T-G area by removing the cover and placing the cover to their position after cleaning works completion for Unit # 6 & 7. |
| 6 | Cleaning & sweeping of - 4 Mtr. floor of T-G area this includes the removal of jallas from side walls and cleaning of drains also for Unit 6 & 7, Note: Mud, Garbage collected after cleaning shall be disposed off in dust bin located out side of T-G hall.(2449m2) |
| 7 | Cleaning & sweeping of floor and the sidewalls in front of liftdoor of unit 6 & 7, (569m2) |
| 8 | Cleaning & sweeping of rest floor area including , side railing (between A to C row, column No. 2 to 9 for Unit # 6),and Column no.13 to 20 forUnit # 7 and passage of 2 mtr. Between B to C row, column 9 to 13, (6621m2). |
| 9 | Cleaning of jallas from the side walls & roof from 8.5 Mtr. To 17 Mtr. floor including the structure, (9918m2). |
| 10 | Cleaning & sweeping of thefloor and the sidewalls in front of liftdoor of unit 6 & 7. (569.38m2). |
| 11 | Cleaning & sweeping of 17 Mtr. floor area between Ato B row, column 2-20. this job include the cleaning of complete17 Mtr. Floor area with detergent in January & June (i.e. twice in year) withoutany extra payment, (6003.38m2). |
| 12 | CCR Committee room and Shift Engineer room which includes the cleaning of following in each shift, (146.39m2)i) Hand wash toilet room,ii) Shift in charge room ,iii) Kitchen room &iv) All glass window & doors. |
| 13 | Cleaning & sweeping of floor area between Ato B row including the passage from TG Hall to service house building, (74m2). |
| 14 | Cleaning and spittoons including disposal of waste materials & putting in sand & lime ( 12 Nos. spittoons in each Unit ) |
| 15 | Cleaning, sweeping & removal ofjallas from the side wall up to 24 mtrs. and includingceiling of this floor from B to C row & cleaning of glass window from inside and column structure between column 1 to 9 & 13A to 22,including cleaning of ralling along service house building & TG hallalso including from A to B row, (2856m2). |
| 16 | Cleaning and removal of jallas from walls & ceilingofCCR committee room between A -B row and column 12 to13, this includes , (260.28m2). |
| 17 | Cleaning of complete 17 Mtr. Floor area by rubbing with cleaning agent & cleaning with wet scrubber to remove hard deposited dust etc. from the tiles of the floor, (6373.38m2). |
| 18 | Cleaning & sweeping of the floor and the side walls in front of liftdoor of unit 6 & 7, (210m2). |
| 19 | Cleaning & sweeping of the floor of 24 Mtr. Floor and cleaning ofjallas from the side wall and includingceiling of this floor between B-C row,, (1387.13m2). i)Column no. 1 to 2 for unit 6. ii) Column 21to 22 for unit7.(Except cable gallary, A.C. Equipment room and cabins for maintenance division). iii) Column 1 to 22 including the side passage and railling |
| 20 | Cleaning& sweeping of 31.75 Mtr. Floor betweenB-C row, (1680m2).i)column no. 1 to 7 & 8 to 9 for unit 6, ii) column 13 to 22 for unit 7. |
| 21 | Cleaningof jalla fromwalls and windows, (3278m2). |
| 22 | Cleaning& sweeping of Floor & the sidewalls in front of lift door of Unit 6 & 7, (169.75m2). |
| 23 | Cleaning& sweeping of 36 Mtr. Floor betweenB-C row, (1255m2).i)column no. 2 to 7for unit 6,ii)column no. 17 to 22 for unit 7 iii) including platform of jali/grill & railing. |
| 24 | Cleaning& sweeping of Floor & the sidewalls in front of lift door of Unit 6 & 7, (210m2). |
| 25 | Cleaningof stairs from zero Mtr. To 32 Mtr. B-C row column 8 to 9 for unit # 6 andcolumn 13 to 14 for unit # 7 with cleaning of concern grills platform, side wall & floor of different levels throughout the stairs, Beam & railing of stairs, (1238m2). |
| 26 | Cleaningof stairs from zero Mtr. To 36 Mtr. ( B-C row, column 1 to 2 for unit 6 & column 20 to 21 for Unit #7 with cleaning ofconcern grills platform, side wall up to 2 mtr. & floor of different levels throughout the stairs, Beams & railing of stairs, (1555.2m2). |
| 27 | Cleaningof stairs from zero Mtr. To 17 Mtr. ( A-B row, column 2-3 & 07-08 for unit6 & column 13A-14 & 18-19 for Unit # 7 with cleaning ofconcern grills platform, floor of different levels throughout the stairs, Beams & railing of stairs, (1428m2). |
| 28 | Cleaningof stairs from below zeroMtre. leveli.e. (-4)Mtr. to zero Mtr. inA-B row, column 3 to 7 for unit6 & column 16-20 for Unit # 7with cleaning ofconcernplatform,Beams & railing, (85.6m2). |
| 29 | Cleaningof stairs from 32 Mtr. to 36 Mtr. ( B-C row, column 9A to 10 for unit 6 & column12 to 13 for Unit #7 with cleaning ofconcern grills platform, side wall up to 2 mtr. & Beams, railing, (171.2m2). |
| 30 | Cleaning of toilets, bathroom & wash basin with harpic/phenyl three times in a day andremoval of Jallas / Dust from side walls, (563.5m2).At 17 Mtr. Between row B-C, column 8-9 & 12-13 and 20-21. At 8.5 Mtr. Between row B-C, column 8-9 & 12-13 At 0 Mtr. Between row B-C, column 8-9 & 20-21. |
| 31 | Cleaning, sweeping with brooms & wiping with wet cloths with approved disinfectant of floors of different various area such as SWAS room, Labs etc.(1125m2). |
| 32 | Theremoval of Jallas / Dust etc. from side walls, ceiling &glass window of different various area such as SWAS room, Labs etc. as and when required. (9889.25m2). |
| 33 | Cleaning & removal of Jallas / Dust from side walls, Column, ceiling &cleaning of glass window from inside of following area, (1889.25m2). 1) Ceiling ofT G Hall from A to B row, column 1 to 22. 2) Wall Beam & column, glass window from inside along row A from column no. 2 to 20 from 17 Mtr. to the ceiling & Column No.1 to 2 & 20 to 22 from 8.5 Mtr. to the ceiling.3) Wall Beam & column, glass window from inside alongrow C, from column no.2 to 21from 24Mtr. up to the ceiling . 4) Wall Beam & column,glass window from inside, along column no. 1, row A to B from0 Mtr. Up to the ceiling & column no. 22 from0 Mtr. to the ceiling. or other works as directed.NOTE :-E.O.T Crane shall be provided if available for cleaning / Removal of jallas / Dust from ceiling & side walls ofT-G area. |
| 34 | Cleaning & sweeping offloor area of operator cabin(boiler & TG side)unit # 6 & # 7 of 2x500M W, DTPS, Anpara.(48 Sq.mtr.) |
| 35 | Disposal of garbage collected from above areasto garbage dumping yard, with the help of tractor trolly. |
| 36 | Cleaning & sweeping of floorarea of CW Pump House, Fuel oil Pump House, Fire Pump House, D.G. House, Air Conditioning Room, Air compressor room, ACW Pump house (02 No.) andCoal and Oil lab of DTPS, Anpara.(4126.00 m2). |
| 37 | Cleaning of long pipe trenches etc., by removing the cover and placing the cover to their position after cleaning works completion ofCW Pump House, Fuel oil Pump House, Fire Pump House, D.G. House, Air Conditioning Room, Air compressor room, ACW Pump house (02 No.) andCoal and Oil lab of DTPS,Anpara. (915.28m2) |
| 38 | Cleaning of glass window and door glasses of CW Pump House, Fuel oil Pump House, Fire Pump House,D.G. House, Air Conditioning Room, Air compressor room, ACW Pump house (02 No.) andCoal and Oil lab of DTPS, Anpara. (571.40m2) |
| 39 | Cleaning and removal ofCobweb/dustfrom the side walls includingceilings & all structures ( Wall Beam & column) ofCW Pump House, Fuel oil Pump House, Fire Pump House, D.G. House, Air Conditioning Room, Air compressor room ,ACW Pump house (02 No.) andCoal and Oil lab of DTPS, Anpara. |
| 40 | Cleaning of toilets, bathroom & wash basin etc (CW pump house,ESPs, FOPH& coal & oil lab.with harpic/phenyl three times in a day andremoval of Jallas / Dust from side walls, (643.5m2). |
| 41 | Cleaning of choked CI/ sewer line of toilets or manholes of toilets or septic tanks of toilets. |
| 42 | Floor Cleaning & sweeping of CCR, battery room, FOPH DCS control room & C&I lab and store room of unit # 6 & 7, 2x500 MW, DTPS, Anpara. (The work shall be carried out by engaging 02 nos. of unskilled laborers daily. Work of two unskilled labours /day shall be reckoned as 1 job.). Frequency: daily. |
| 43 | General up keeping & Assistance in operationof lifts ( 13 Nos.) of DTPS, Anpara .Note - Carried out above work by minimum 02 manday/ shift ( semi Skilled). Work shall be carried out in three shiftdaily ( round the Clock).02 manday /shift work shall be reckoned as one job . Hence total 03 job daily and3X365 = 1095 job /year ,Detail of lifts areas per tender. |