| 1 | PART - 1 Spair part purchesingALL TYPE OF 4 WHEELER VEHICLE, DETING, WELDING, SPRAY AND COLOURING |
| 2 | Tata somovicta, vehicle complete denting, welding & Spray painting with material. |
| 3 | Somu grandee,vehicle complete denting, welding & Spray painting with material. |
| 4 | Scorpio,vehicle complete denting, welding & Spray painting with material. |
| 5 | Bolero Axiva, vehicle complete denting, welding & Spray painting with material. |
| 6 | Tavera, vehicle complete denting, welding & Spray painting with material. |
| 7 | Tata indigo,vehicle complete denting, welding & Spray painting with material. |
| 8 | Innova, vehicle complete denting, welding & Spray painting with material. |
| 9 | Tata Safari, vehicle complete denting, welding & Spray painting with material. |
| 10 | Marotijipsee, vehicle complete denting, welding & Spray painting with material. |
| 11 | Maroti Omni van,vehicle complete denting, welding & Spray painting with material. |
| 12 | Red, Yellow patte& Police monogram radium complete with material. |
| 13 | Vehicle no plate radium with new material. |
| 14 | One side doordenting, welding & Spray painting with material. |
| 15 | One side fenderdenting, welding & Spray painting with material. |
| 16 | Front one bumper denting, welding & Spray painting with material. |
| 17 | Backside one bumper denting, welding & Spray painting with material. |
| 18 | Onefutres throwing & Welding |
| 19 | Front bonnetvehicle complete denting, welding & Spray painting with material. |
| 20 | One wheel disc spray coloring with material. |
| 21 | Backside doordenting, welding & Spray painting with material. |
| 22 | Front show guarddenting, welding & Spray painting with material. |
| 23 | Front show radiator greed denting, welding & Spray painting with material. |
| 24 | Body flooring new plate welding with material(inches). |
| 25 | One side door setting & repairing. |
| 26 | Back door setting & repairing. |
| 27 | Door regulator machine opening & fitting. |
| 28 | Seat foundation & seat pipe welding. |
| 29 | Complete door beading opening & fitting. |
| 30 | Front glassopening & fitting. |
| 31 | Complete body foundation opening & fitting. |
| 32 | New outer handle opening & fitting(inches). |
| 33 | Garnespattiopening & fitting |
| 34 | One side door glass opening & fitting(inches). |
| 35 | One backside glass opening & fitting. |
| 36 | Construction of chamber for 100mm sluice plates |
| 37 | Construction of chamber for 100mm sluices valve |
| 38 | Supplying, Conveying and fixing spls. Including ea |
| 39 | Supplying, Conveying and fixing spls. Including eart |
| 40 | Construction of chamber for 100mm sluice plates |
| 41 | Construction of chamber for 100mm sluices valve |
| 42 | Laying and Jointing PVC Pipe. Heading |
| 43 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 44 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 45 | Construction of chamber for 100mm sluices valve |
| 46 | Construction of chamber for 100mm sluices valve |
| 47 | Laying and Jointing PVC Pipe. Heading |
| 48 | Brick work in C.M 1:5 mix including all labour charges etc complete |
| 49 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete |
| 50 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete |
| 51 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in |
| 52 | b)CI bend 22.5° (250mm dia) |
| 53 | Construction of chamber for 100mm sluice plates |
| 54 | Construction of chamber for 100mm sluices valve |
| 55 | Supplying, Conveying and fixing spls. Including ea |
| 56 | Supplying, Conveying and fixing spls. Including eart |
| 57 | Construction of chamber for 100mm sluice plates |
| 58 | Construction of chamber for 100mm sluices valve |
| 59 | Laying and Jointing PVC Pipe. Heading |
| 60 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 61 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 62 | Construction of chamber for 100mm sluices valve |
| 63 | Construction of chamber for 100mm sluices valve |
| 64 | Laying and Jointing PVC Pipe. Heading |
| 65 | Brick work in C.M 1:5 mix including all labour charges etc complete |
| 66 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete |
| 67 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete |
| 68 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in |
| 69 | b)CI bend 22.5° (250mm dia) |
| 70 | Construction of chamber for 100mm sluice plates |
| 71 | Construction of chamber for 100mm sluices valve |
| 72 | Supplying, Conveying and fixing spls. Including ea |
| 73 | Supplying, Conveying and fixing spls. Including eart |
| 74 | Construction of chamber for 100mm sluice plates |
| 75 | Construction of chamber for 100mm sluices valve |
| 76 | Laying and Jointing PVC Pipe. Heading |
| 77 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 78 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 79 | Construction of chamber for 100mm sluices valve |
| 80 | Construction of chamber for 100mm sluices valve |
| 81 | Construction of chamber for 100mm sluices valve |
| 82 | Laying and Jointing PVC Pipe. Heading |
| 83 | Brick work in C.M 1:5 mix including all labour charges etc complete |
| 84 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete |
| 85 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete |
| 86 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in |
| 87 | b)CI bend 22.5° (250mm dia) |
| 88 | Construction of chamber for 100mm sluice plates |
| 89 | Construction of chamber for 100mm sluices valve |
| 90 | Supplying, Conveying and fixing spls. Including ea |
| 91 | Supplying, Conveying and fixing spls. Including eart |
| 92 | Construction of chamber for 100mm sluice plates |
| 93 | Construction of chamber for 100mm sluices valve |
| 94 | Laying and Jointing PVC Pipe. Heading |
| 95 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 96 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 97 | Construction of chamber for 100mm sluices valve |
| 98 | Construction of chamber for 100mm sluices valve |
| 99 | Construction of chamber for 100mm sluices valve |
| 100 | Laying and Jointing PVC Pipe. Heading |
| 101 | Brick work in C.M 1:5 mix including all labour charges etc complete |
| 102 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete |
| 103 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete |
| 104 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in |
| 105 | b)CI bend 22.5° (250mm dia) |
| 106 | Construction of chamber for 100mm sluice plates |
| 107 | Construction of chamber for 100mm sluices valve |
| 108 | Supplying, Conveying and fixing spls. Including ea |
| 109 | Supplying, Conveying and fixing spls. Including eart |
| 110 | Construction of chamber for 100mm sluice plates |
| 111 | Construction of chamber for 100mm sluices valve |
| 112 | Laying and Jointing PVC Pipe. Heading |
| 113 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 114 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 115 | Construction of chamber for 100mm sluices valve |
| 116 | Construction of chamber for 100mm sluices valve |
| 117 | Laying and Jointing PVC Pipe. Heading |
| 118 | Brick work in C.M 1:5 mix including all labour charges etc complete |
| 119 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete |
| 120 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete |
| 121 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in |
| 122 | b)CI bend 22.5° (250mm dia) |
| 123 | Construction of chamber for 100mm sluice plates |
| 124 | Construction of chamber for 100mm sluices valve |
| 125 | Supplying, Conveying and fixing spls. Including ea |
| 126 | Supplying, Conveying and fixing spls. Including eart |
| 127 | Construction of chamber for 100mm sluice plates |
| 128 | Construction of chamber for 100mm sluices valve |
| 129 | Laying and Jointing PVC Pipe. Heading |
| 130 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 131 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 132 | Construction of chamber for 100mm sluices valve |
| 133 | Laying and Jointing PVC Pipe. Heading |
| 134 | Brick work in C.M 1:5 mix including all labour charges etc complete |
| 135 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete |
| 136 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete |
| 137 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in |
| 138 | b)CI bend 22.5° (250mm dia) |
| 139 | Construction of chamber for 100mm sluice plates |
| 140 | Construction of chamber for 100mm sluices valve |
| 141 | Supplying, Conveying and fixing spls. Including ea |
| 142 | Supplying, Conveying and fixing spls. Including eart |
| 143 | Construction of chamber for 100mm sluice plates |
| 144 | Construction of chamber for 100mm sluices valve |
| 145 | Laying and Jointing PVC Pipe. Heading |
| 146 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 147 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 148 | Construction of chamber for 100mm sluices valve |
| 149 | Construction of chamber for 100mm sluices valve |
| 150 | Laying and Jointing PVC Pipe. Heading |
| 151 | Brick work in C.M 1:5 mix including all labour charges etc complete |
| 152 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete |
| 153 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete |
| 154 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in |
| 155 | b)CI bend 22.5° (250mm dia) |
| 156 | Construction of chamber for 100mm sluice plates |
| 157 | Construction of chamber for 100mm sluices valve |
| 158 | Supplying, Conveying and fixing spls. Including ea |
| 159 | Supplying, Conveying and fixing spls. Including eart |
| 160 | Construction of chamber for 100mm sluice plates |
| 161 | Construction of chamber for 100mm sluices valve |
| 162 | Laying and Jointing PVC Pipe. Heading |
| 163 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 164 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 165 | Construction of chamber for 100mm sluices valve |
| 166 | Construction of chamber for 100mm sluices valve |
| 167 | Laying and Jointing PVC Pipe. Heading |
| 168 | Brick work in C.M 1:5 mix including all labour charges etc complete |
| 169 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete |
| 170 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete |
| 171 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in |
| 172 | b)CI bend 22.5° (250mm dia) |
| 173 | Construction of chamber for 100mm sluice plates |
| 174 | Construction of chamber for 100mm sluices valve |
| 175 | Supplying, Conveying and fixing spls. Including ea |
| 176 | Supplying, Conveying and fixing spls. Including eart |
| 177 | Construction of chamber for 100mm sluice plates |
| 178 | Construction of chamber for 100mm sluices valve |
| 179 | Laying and Jointing PVC Pipe. Heading |
| 180 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 181 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 182 | Construction of chamber for 100mm sluices valve |
| 183 | Construction of chamber for 100mm sluices valve |
| 184 | Construction of chamber for 100mm sluices valve |
| 185 | Laying and Jointing PVC Pipe. Heading |
| 186 | Brick work in C.M 1:5 mix including all labour charges etc complete |
| 187 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete |
| 188 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete |
| 189 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in |
| 190 | b)CI bend 22.5° (250mm dia) |
| 191 | Construction of chamber for 100mm sluice plates |
| 192 | Construction of chamber for 100mm sluices valve |
| 193 | Supplying, Conveying and fixing spls. Including ea |
| 194 | Supplying, Conveying and fixing spls. Including eart |
| 195 | Construction of chamber for 100mm sluice plates |
| 196 | Construction of chamber for 100mm sluices valve |
| 197 | Laying and Jointing PVC Pipe. Heading |
| 198 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 199 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 200 | Construction of chamber for 100mm sluices valve |
| 201 | Construction of chamber for 100mm sluices valve |
| 202 | Construction of chamber for 100mm sluices valve |
| 203 | Laying and Jointing PVC Pipe. Heading |
| 204 | Brick work in C.M 1:5 mix including all labour charges etc complete |
| 205 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete |
| 206 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete |
| 207 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in |
| 208 | b)CI bend 22.5° (250mm dia) |
| 209 | Construction of chamber for 100mm sluice plates |
| 210 | Construction of chamber for 100mm sluices valve |
| 211 | Supplying, Conveying and fixing spls. Including ea |
| 212 | Supplying, Conveying and fixing spls. Including eart |
| 213 | Construction of chamber for 100mm sluice plates |
| 214 | Construction of chamber for 100mm sluices valve |
| 215 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 216 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 217 | Construction of chamber for 100mm sluices valve |
| 218 | Construction of chamber for 100mm sluices valve |
| 219 | Brick work in C.M 1:5 mix including all labour charges etc complete |
| 220 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete |
| 221 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete |
| 222 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in |
| 223 | b)CI bend 22.5° (250mm dia) |
| 224 | Construction of chamber for 100mm sluice plates |
| 225 | Construction of chamber for 100mm sluices valve |
| 226 | Supplying, Conveying and fixing spls. Including ea |
| 227 | Supplying, Conveying and fixing spls. Including eart |
| 228 | Construction of chamber for 100mm sluice plates |
| 229 | Construction of chamber for 100mm sluices valve |
| 230 | Laying and Jointing PVC Pipe. Heading |
| 231 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 232 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 233 | Construction of chamber for 100mm sluices valve |
| 234 | Laying and Jointing PVC Pipe. Heading |
| 235 | Brick work in C.M 1:5 mix including all labour charges etc complete |
| 236 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete |
| 237 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete |
| 238 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in |
| 239 | b)CI bend 22.5° (250mm dia) |
| 240 | Construction of chamber for 100mm sluice plates |
| 241 | Construction of chamber for 100mm sluices valve |
| 242 | Supplying, Conveying and fixing spls. Including ea |
| 243 | Supplying, Conveying and fixing spls. Including eart |
| 244 | Construction of chamber for 100mm sluice plates |
| 245 | Construction of chamber for 100mm sluices valve |
| 246 | Laying and Jointing PVC Pipe. Heading |
| 247 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 248 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 249 | Construction of chamber for 100mm sluices valve |
| 250 | Construction of chamber for 100mm sluices valve |
| 251 | Laying and Jointing PVC Pipe. Heading |
| 252 | Brick work in C.M 1:5 mix including all labour charges etc complete |
| 253 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete |
| 254 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete |
| 255 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in |
| 256 | b)CI bend 22.5° (250mm dia) |
| 257 | Construction of chamber for 100mm sluice plates |
| 258 | Construction of chamber for 100mm sluices valve |
| 259 | Supplying, Conveying and fixing spls. Including ea |
| 260 | Supplying, Conveying and fixing spls. Including eart |
| 261 | Construction of chamber for 100mm sluice plates |
| 262 | Construction of chamber for 100mm sluices valve |
| 263 | Laying and Jointing PVC Pipe. Heading |
| 264 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 265 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 266 | Construction of chamber for 100mm sluices valve |
| 267 | Construction of chamber for 100mm sluices valve |
| 268 | Laying and Jointing PVC Pipe. Heading |
| 269 | Brick work in C.M 1:5 mix including all labour charges etc complete |
| 270 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete |
| 271 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete |
| 272 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in |
| 273 | b)CI bend 22.5° (250mm dia) |
| 274 | Construction of chamber for 100mm sluice plates |
| 275 | Construction of chamber for 100mm sluices valve |
| 276 | Supplying, Conveying and fixing spls. Including ea |
| 277 | Supplying, Conveying and fixing spls. Including eart |
| 278 | Construction of chamber for 100mm sluice plates |
| 279 | Construction of chamber for 100mm sluices valve |
| 280 | Laying and Jointing PVC Pipe. Heading |
| 281 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 282 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 283 | Construction of chamber for 100mm sluices valve |
| 284 | Construction of chamber for 100mm sluices valve |
| 285 | Construction of chamber for 100mm sluices valve |
| 286 | Laying and Jointing PVC Pipe. Heading |
| 287 | Brick work in C.M 1:5 mix including all labour charges etc complete |
| 288 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete |
| 289 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete |
| 290 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in |
| 291 | b)CI bend 22.5° (250mm dia) |
| 292 | Construction of chamber for 100mm sluice plates |
| 293 | Construction of chamber for 100mm sluices valve |
| 294 | Supplying, Conveying and fixing spls. Including ea |
| 295 | Supplying, Conveying and fixing spls. Including eart |
| 296 | Construction of chamber for 100mm sluice plates |
| 297 | Construction of chamber for 100mm sluices valve |
| 298 | Laying and Jointing PVC Pipe. Heading |
| 299 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 300 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 301 | Construction of chamber for 100mm sluices valve |
| 302 | Construction of chamber for 100mm sluices valve |
| 303 | Construction of chamber for 100mm sluices valve |
| 304 | Laying and Jointing PVC Pipe. Heading |
| 305 | Brick work in C.M 1:5 mix including all labour charges etc complete |
| 306 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete |
| 307 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete |
| 308 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in |
| 309 | b)CI bend 22.5° (250mm dia) |
| 310 | Construction of chamber for 100mm sluice plates |
| 311 | Construction of chamber for 100mm sluices valve |
| 312 | Supplying, Conveying and fixing spls. Including ea |
| 313 | Supplying, Conveying and fixing spls. Including eart |
| 314 | Construction of chamber for 100mm sluice plates |
| 315 | Construction of chamber for 100mm sluices valve |
| 316 | Laying and Jointing PVC Pipe. Heading |
| 317 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 318 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 319 | Construction of chamber for 100mm sluices valve |
| 320 | Construction of chamber for 100mm sluices valve |
| 321 | Laying and Jointing PVC Pipe. Heading |
| 322 | Brick work in C.M 1:5 mix including all labour charges etc complete |
| 323 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete |
| 324 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete |
| 325 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in |
| 326 | b)CI bend 22.5° (250mm dia) |
| 327 | Construction of chamber for 100mm sluice plates |
| 328 | Construction of chamber for 100mm sluices valve |
| 329 | Supplying, Conveying and fixing spls. Including ea |
| 330 | Supplying, Conveying and fixing spls. Including eart |
| 331 | Construction of chamber for 100mm sluice plates |
| 332 | Construction of chamber for 100mm sluices valve |
| 333 | Laying and Jointing PVC Pipe. Heading |
| 334 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 335 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 336 | Construction of chamber for 100mm sluices valve |
| 337 | Laying and Jointing PVC Pipe. Heading |
| 338 | Brick work in C.M 1:5 mix including all labour charges etc complete |
| 339 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete |
| 340 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete |
| 341 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in |
| 342 | b)CI bend 22.5° (250mm dia) |
| 343 | Construction of chamber for 100mm sluice plates |
| 344 | Construction of chamber for 100mm sluices valve |
| 345 | Supplying, Conveying and fixing spls. Including ea |
| 346 | Supplying, Conveying and fixing spls. Including eart |
| 347 | Construction of chamber for 100mm sluice plates |
| 348 | Construction of chamber for 100mm sluices valve |
| 349 | Laying and Jointing PVC Pipe. Heading |
| 350 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 351 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 352 | Construction of chamber for 100mm sluices valve |
| 353 | Construction of chamber for 100mm sluices valve |
| 354 | Laying and Jointing PVC Pipe. Heading |
| 355 | Brick work in C.M 1:5 mix including all labour charges etc complete |
| 356 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete |
| 357 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete |
| 358 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in |
| 359 | b)CI bend 22.5° (250mm dia) |
| 360 | Construction of chamber for 100mm sluice plates |
| 361 | Construction of chamber for 100mm sluices valve |
| 362 | Supplying, Conveying and fixing spls. Including ea |
| 363 | Supplying, Conveying and fixing spls. Including eart |
| 364 | Construction of chamber for 100mm sluice plates |
| 365 | Construction of chamber for 100mm sluices valve |
| 366 | Laying and Jointing PVC Pipe. Heading |
| 367 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 368 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 369 | Construction of chamber for 100mm sluices valve |
| 370 | Construction of chamber for 100mm sluices valve |
| 371 | Laying and Jointing PVC Pipe. Heading |
| 372 | Brick work in C.M 1:5 mix including all labour charges etc complete |
| 373 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete |
| 374 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete |
| 375 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in |
| 376 | b)CI bend 22.5° (250mm dia) |
| 377 | Construction of chamber for 100mm sluice plates |
| 378 | Construction of chamber for 100mm sluices valve |
| 379 | Supplying, Conveying and fixing spls. Including ea |
| 380 | Supplying, Conveying and fixing spls. Including eart |
| 381 | Construction of chamber for 100mm sluice plates |
| 382 | Construction of chamber for 100mm sluices valve |
| 383 | Laying and Jointing PVC Pipe. Heading |
| 384 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 385 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 386 | Construction of chamber for 100mm sluices valve |
| 387 | Construction of chamber for 100mm sluices valve |
| 388 | Construction of chamber for 100mm sluices valve |
| 389 | Laying and Jointing PVC Pipe. Heading |
| 390 | Brick work in C.M 1:5 mix including all labour charges etc complete |
| 391 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete |
| 392 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete |
| 393 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in |
| 394 | b)CI bend 22.5° (250mm dia) |
| 395 | Construction of chamber for 100mm sluice plates |
| 396 | Construction of chamber for 100mm sluices valve |
| 397 | Supplying, Conveying and fixing spls. Including ea |
| 398 | Supplying, Conveying and fixing spls. Including eart |
| 399 | Construction of chamber for 100mm sluice plates |
| 400 | Construction of chamber for 100mm sluices valve |
| 401 | Laying and Jointing PVC Pipe. Heading |
| 402 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using |
| 403 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost |
| 404 | Construction of chamber for 100mm sluices valve |
| 405 | Construction of chamber for 100mm sluices valve |
| 406 | Construction of chamber for 100mm sluices valve |