}

Tender For Servicing Maintenance Of Summer Appliances At Different Sectors Under Age I Coast Guard Noida, noida-Uttar Pradesh

Military Engineer Services-MES has published Tender For Servicing Maintenance Of Summer Appliances At Different Sectors Under Age I Coast Guard Noida. Submission Date for this Tender is 28-12-2022. Air Conditioner Tenders in noida Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

35080145
Corrigendum : Tender For Servicing Maintenance Of Summer Appliances At Different Sectors Under Age I Coast Guard Noida
Open Tender
Indian
Uttar Pradesh
noida
28-12-2022

Tender Details

Tender For Servicing Maintenance Of Summer Appliances At Different Sectors Under Age I Coast Guard Noida

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 21-Dec-2022 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 28-12-2022

Key Value

Document Fees
INR 500 /-
EMD
INR 12000.0 /-
Tender Value
INR 6 Lakhs /-

BOQ Items

Name of Work: SERVICING & MAINTENANCE OF SUMMER APPLIANCES AT DIFFERENT SECTORS UNDER AGE(I)COAST GUARD NOIDA
Sl. No. Item Description
1Disconnecting of electric connectionof the split AC cap 2.00 TR from its stabilizer or its electric board and remove the front cover of indoor AC unit and clear it with pressure water and wire mesh/ brush/nylon brush without spoiling in side area of room, then refixing the front cover of indoor unit split type AC including cleaning of air filter.Remove the outer cover of out door unit and covered the condenser moto with ploythene/plastic cover so that water shall not be entered in the motor while cleaning the unit with pressure water and applyingcleaner solution and clean with wire mesh bursh/nylon brush to the condensing coil of out door unit including greasing of fan motor, checking of complete wiring of ACs and tightening all electrical connection with thimble and reconnecting the electrical connection with DBs, Stabilizer as per site condition, Note- Spares required for replacement will be measured and paid separately (To be carried out in every six months interval)
2Supply and fix in replacementnew Running/ starting capacitors suitable for split ACcap 2.00 TR . Make :- Keltron/ Siemens/ Tibcon/ Sarda.
3Supply and fix in replacementnew Thermostatic switch suitable for split ACcap 2.00 TR . Make:- utrtol/Siemens /Carrier/ Tibcon/ Sarda.
4Supply and fix in replacementnewFan Motor for out door unit suitable for split ACcap 2.00 TR Make:- Ranutrtol/ Siemens/Carrier/Tibcon/Sarda
5Supply and fix in replacementnew Electronic Display Boardsuitable for split AC cap 2.00 TR Make :As per OEM
6Supply and fix in replacementnew Swing Motor suitable for split ACcap 2.00TR Make :As per OEM
7Supply and fix in replacementnew evaporator coil copper for split AC cap2.0 TR Make :As per OEM
8Supply and fix in replacementnew condencer coil copper for split AC cap2.0 TR Make :As per OEM
9Supply and fix in replacementnew copper pipe of size 1/4" for split AC cap2.0 TR
10Supply and fix in replacementnewcopper pipe of size 3/8" for split AC cap 2.0 TR
11Supply and fix in replacementnew insulation for pipe of size 1/4" or 3/8" for ACcap 2.0 TR
12Material and labour for Leak test with CO2/Nitrogen gas and arrest leakage with brazing on indoor/oudoorof copper pipe .AC 2.0 TR
13Material and labourfor charging only refrigerant gas after pressure test to a compressor for split type AC 2.0 TR Capacity Meprom / Floron
14Supply and fix in replacementnewnylon air filter cleanable indigenous of suitable size for thesplit type AC 2.0 TR Capacity complete all as directed.
15Supply and fix in replacementnew fan blades suitable for condencer motor for the split type air conditioners2TR capacity all as directed. MAKE :As per OEM
16Supply and fix in replacementnew balance centrifugal blower with motor for the split air conditioners of the2 TR capacity complete all as directed.Make :As per OEM
17Supply and fix in replacementnew cord lessremote suitable for split AC of capacity 2.0 TR /1.5 TR as directed by Engineer-in-charge Make :As per OEM
18Supply and fix in replacementnewprinted circuit board (PCB)of 2 TR capacity and reconnecting the same with electrical connections for split type AC and complete all as directed.Make :As per OEM
19Supply and fix in replacementnewprinted circuit board (PCB)for inverter AC 1.5 TR capacity and reconnecting the same with electrical connections for split type AC and complete all as directed.Make :As per OEM
20Supply and fix in replacementnewprinted circuit board (PCB)for inverter AC2TR capacity and reconnecting the same with electrical connections for split type AC and complete all as directed.Make :As per OEM
21Disconnecting the electrical connections and remove the split type A/C including copper pipe of capacity 1.5TR/2TRfrom the existing position and shifting the same to the near location, re-connecting the A/C after making the suitablehole with necessary connections including closing the hole at removed place with brick masonry matching with existing colour all as directed.
22Taking down unsv indoor unit and supply and fix new indoor unit2 Ton Cap with copper coil ie. (evaporator) including cutting brazing leak testing, gas charging reconnecting and testing complete all as specified and directed. Make :LG/Voltas/Blue Star/Carrier
23Disconnectingof electric connectionof the split type AC 1.5 TR from its stabilizer or its electric board and taking out from its position remove the front cover and outer cover, cleaning with pressure water and wire mesh/ brush/nylon brush andpressure waterwithout spoiling in side area of room including cleaning of air filter, refixing the outer cover and front cover, greasing all moving parts.Checking and reconnecting electrical connection of DBs, Stabilizer,including checking of wiring of ACs as per site condition and tightening all electrical connection with thimble. Note - Spares required for replacement will be measured and paid separately(To be carried out in every six months interval)
24Supply and fix in replacementnewRunning / Starting capacitors suitable forsplit type AC 1.5 ton. Make :- Keltron/ Siemens/ Tibcon/ Sarda.
25Supply and fix in replacementnew Swing Motor suitable forsplit type AC 1.5 ton Make :As per OEM
26Supply and fix in replacementnewcopper evaporator coilfor 1.5 ton split type AC.Make :As per OEM
27Supply and fix in replacementnew copper condencer coil for 1.5 ton split type AC.Make :As per OEM
28Supply and fix in replacementnew Electronic Display Boardsuitable forsplit type AC 1.5 ton.Make :As per OEM
29Supply and fix in replacementnew duel speed blower fan motor1/5 H.P. by disconnecting all the electrical connections and reconnecting same with electrical connections and testing for the split type air conditioners complete all as directed.Make :As per OEM
30Supply and fix in replacementnew air filter cleanable indigenous of suitable size for the splittype air conditioners of 1.5 ton capacity complete all as directed.
31Material and labour for Leak test with CO2/Nitrogen gas and arrest leakage with brazing of copper pipe split AC 1.50 TR
32Material for charging only refrigerant gas after pressure test to a compressor for split type 1.5TR CapacityMake - Meprom / Floron
33Material and labour for carrying out repairs/maintenance/servicing of water cooler storage type of 40/80,60/120 Litres capacity, flushing of storage tank and chemical cleaning, repair/replaement of unserviceable/.worn out spares and accessores cleaning of drain pipes, float valves, s/s tray, push tap, body frames and base plates fan motor all as specified and directed by Engineer-in-Charge. Note-Spares required for replacement will be measured and paid separately Make: Voltas
34Supply and fix in replacementnew compressor suitable for 40/80,60/120ltrs water cooler.LG/ Blue Ster/ Sumsung
35Supply and fix in replacementnew copper condenser coil suitable for 40/80,60/120ltrs water cooler.Make :As per OEM
36Supply and fix in replacementnew running/starting capacitor suitable for 40/80,60/120ltrs water cooler Make-Keltron/ Siemens/ Tibcon/ Sarda.
37Supply and fix in replacementnewCP push type Water tap 15 mm size suitable forwater cooler storage type of 80/40,60/120Litres
38Supply and fix in replacementnew relay suitable for 40/80,60/120ltrs water cooler.Make :As per OEM
39Supply and fix in replacementnew door lock with key suitable for 40/80,60/120ltrs water coolerMake :As per OEM
40Material and labour for Leak test with CO2/Nitrogen gas and arrest leakage with brazing for 40/80,60/120 ltrs water cooler
41Material for charging only refrigerant gas after pressure test for 40/80 ltrs water cooler with existing type gas R-22,134a
42Material and labour for carrying out repair /maintenance/ servicing ofRefigarator of 165 Ltrs,180 ltrs 250 Ltrsand 310 Ltrs cap periodic cleaning,checking of electrical circuitand accessories to make the Refigarator in good working condition all as specified and directed by Engineer-in-Charge. Make:LG /Godrej Note- Gas charging ifrequiredwill be measured and paid separately
43Material and labour for Leak test with CO2/Nitrogen gas and arrest leakage with brazing for Refigarator of 180-320 ltr cap
44Material for charging only refrigerant gas after pressure test Refigarator of 180-320 ltr cap with existing type gas R-22,134a
45Material and labour for carrying out repair /maintenance/ servicing of Deep freezer 320ltr cap Freezer periodic cleaning, cleaning of water tub and checking of electrical circuit repair/ replacement of unserviceable/worn out spares and accessories to make the Deep Freezer in good working condition all as specified and directed by Engineer-in-Charge. Note- Spares required for replacement will be measured and paid separately Make: Voltas
46Supply and fix in replacementnew copper condenser coilfor Deep freezer 320ltr cap.Make :As per OEM
47Supply and fix in replacementnew condenser fan motor for Deep freezer 320ltr cap.Make :As per OEM
48Supply and fix in replacementnew thermostate for Deep freezer 320ltr cap.Make :As per OEM
49Material and labour for Leak test with CO2/Nitrogen gas and arrest leakage with brazing forDeep freezer 320ltr cap
50Material for labour for charging only refrigerant gas after pressure test ofDeep freezer 320ltrcap with existing type gas R-22,134a
51Repair to voltage stablizer 2 to 5 KVA capacity for automatic low and high voltage correction boost/buck transformer by rewinding the transformer coil, replacement of selector switch, PC board, time relay, indicator lamp and three core cable cord with plut top and voltmeter
52Supply and Fix in replacement of metal clad industrial plug of 20 Amp, 50 Hz, 2 pole and earth 250 volt. Make-Havells,L&T,Benlo
53Supply and Fix in replacement of industrial 3 core PVC round seathedflexible copper cable of size 1.5 sq mmincludind connected from plug connector of equipment complete all as specified. Make-Havells,Plaza,Finolex
54Supply and Fix in replacement of industrial 3 core PVC round seathedflexible copper cable of size 2.5 sq mmincludind connected from plug connector of equipment complete all as specified. Make-Havells,Plaza,Finolex
55Supply and fix in replacement PVC flexible hose of 20 mm dia with all accessorfes fixed on wall/ceiling/roof etc with suitable GI saddles and screws for connecting with split type Air Conditioner as drain pipe complete all as specified and directed.
56Supply and fix in replacement Rigid PVC pipe of 20 mm dia with all accessorfes fixed on wall/ceiling/roof etc with suitable GI saddles and screws for connecting with split type Air Conditioner as drain pipe complete all as specified and directed.Make-AKG,Plaza,Prince
57Taking out dismentling, cleaning and servicing ofevaporative desert cooler of capacity of 3000 / 4000 Cu. m. / Hr. and refixing the same on original position complete all as directed.
58Supply and fix in replacementnew fan motor working on 230 Volts 50 Hz 1/7 H.P. and reconnecting the same with electrical connections for the evaporative desert cooler of capacity of 3000 / 4000 Cu. m. / Hr. complete all as directed. MAKE: COOL HOME/KHAITAN /CG
59Supply and fix in replacement new water pump working on 230 Volts 50 Hz 1/66 H.P. and reconnecting the same with electrical/water connections for the evaporative desert cooler of capacity 3000/4000 cu.m/hr. complete all as directed . MAKE: KHAITAN/CG/COOL HOME
60Supply and fix in replacementnew Evaporative Cellulose Cooling Padfor the evaporative desert cooler of capacity 3000/4000 cum/ Hr.
61Supply and fix in replacementnew selector switch and reconnecting the same with electrical connections for the evaporative desert cooler of capacity 3000/4000 Cu.m/Hr. complete all as directed
62Supply and fix in replacementnew grill to match with the replaced grill for the evaporative desert cooler of capacity 3000 / 4000 Cu.m/Hr. complete all as directed
63Material and Labor for servicing anddescaling of 200 LPD solar water heating system with descaling compound with the help of pressurized pumped rinsing with glycol chemical etc complete as required and all as directed by Engr in Charge.
64Dismantling of existing unserviceable gasket washer nut bolt, washer clamps between all solar water heaterpanels / pipelineand SITC new Gasket washer I/C connections etc all as directed by Engr in Charge.
65Material and Labor for replacement of oldunserviceable Hose pipe including wire temp bearing capacity 120 degree centegrade complete all as directed.
66Material and labour for fittings ( Male female CPVC brass ends joints / elbows & connections) for wornout & broken water CPVC pipes from solar plant to delivery line complete all as specified and directed.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail