}

Tender For Execution Of Different Works Related To Aug. Of Baskotal Pwss Under Jal Jeevan Mission, Coochbehar-West Bengal

Public Health Engineering Department-PHED has published Tender For Execution Of Different Works Related To Aug. Of Baskotal Pwss Under Jal Jeevan Mission. Submission Date for this Tender is 24-12-2022. Cutting Crimping and Punching Tools Tenders in Coochbehar West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

35068377
Corrigendum : Tender For Execution Of Different Works Related To Aug. Of Baskotal Pwss Under Jal Jeevan Mission
Open Tender
Indian
West Bengal
Coochbehar
24-12-2022

Tender Details

Execution Of Different Works Related To Aug. Of Baskotal Pwss Under Jal Jeevan Mission - Tubewelldrilling By Reverse Rotary Method Of Drilling Using 9 7 / 8” Dia.Bit For Pilot Bore Follwed By Subsequently Reaming Using 12 1 / 4” Dia. , 15 Dia. And 17.5 Dia. Rock Roller Bits / Drag Bits In Consolidated, Semi Consolidated And Soft Formation Up To Required Depth Including Casing Boring And Casing Lowering As Required Including Cost Of Fuels And Lubricants Etc. As Required For Drilling. 2 Rate For Drilling By 17.5 Dia. Bita ) From 6 Mtr. To 60 Mtr. 3 60 Mtr. To 90 Mtr. 4 90 Mtr. To 120 Mtr. 5 120 Mtr. To 144 Mtr. 6 Electro-Logging Charge. 7 Supply And Delivery Of Washed Gravels Size Ranging From 1.80 Mm To 4.74 Mm. Conforming To Is 4097 : 1967. 8 Site Preparation, Temporary Latrine, Placement & Levelling Of Rig Machine, Mast Hoisting And Casing Drilling ( Upto 6 Mtr. ) Placement Of Casing With All Allied Works Necessary To Commence Drilling Woks And Wind Up Of All Machineries After Completion Of Drilling. 9 Transportation Cost Of Drilling Equipment And Accessories Rig Machine Etc. Including Cost Of Fuel, Lubricant & Loading Unloading The Materials From Store / Stack Yard / Suppliers Godown And Unloading / Stacking The Same At Site. ( Upto 60.0 Km Distance ) 10 Lowering The Tube Well Assembly ( Upvc Casing Pipe , Well Pipe, Strainer Along With Upvc Accessories ) Vertically In A Position With Proper Lowering Arrangement By Applying Necessary Jointing Compound Including Labour Cost For Subsequent Gravel Packing And Machine Operation Cost Etc 11 Cost Of Consumables For Drilling Rigs And Machineries. 12 Supply And Delivery Of Upvc Pipe ( Cd ) Conforming To Is 12818:2010. ( Cipet Certified ) A ) 250 Mm Dia. 13 B ) 200 Mm Dia. 14 Supply And Delivery Of Upvc Deep Well Screen ( Rds ) Pipes With Ribs Conforming To Is 12818:2010 . ( Cipet Certified ) A ) 200 Mm Dia. 15 Supply And Delivery Of Upvc Reducera ) 250Mm X 200 Mm Dia. 16 Supply And Delivery Of Upvc Capa ) 200 Mm Dia. 17 B ) 250 Mm Dia. 18 Supply And Delivery Of M.S. Housing Clamp 250 Mm Dia. 19 Supply And Delivery Of M.S .Centre Guide ( Special Type ) . 20 Development ( Min. 8 Hr. Continuous ) Of Tube Well By Using Suitable Air Compressor ( Min. Capacity: 600Cfm & Operating Pressure 14 Bar ) Followed By Yield Testing With Bht Pump ( Head :45 To 50Mtr., Discharge :1100 To 1000 Lpm And 25 Bhp Engine ) All Complete Including To & Fro Transportation Cost And Cost Of Fuels, Lubricants & Labour Etc. 21 Water Sample Collection And Chemical Test Including Arsenic Test. 22 Protective Sealing The Annular Space Between Tube Well Pipes & The Bore By Bentonite Clay Balls / Cement Slurry Above The Shrouded Gravels ( 3 M. Height ) . 23 Packing The Annular Space Between The Outsides Of The Housing Pipe & The Bore With Puddle Clay Balls Of Approved Size As Per Direction Of E.I.C. Including Cost Of All Materials, Labour Complete. 24 Supply And Delivery Of Bentonite Powder Conforming To Is 6186 :1986. 25 Labour For Making Arrangement For Showing Verticality Test Including The Cost For Hire Charges Of Tools And Plants, Scafolding, Labour Etc. All Complete 26 Tubewelldrilling By Reverse Rotary Method Of Drilling Using 9 7 / 8” Dia.Bit For Pilot Bore Follwed By Subsequently Reaming Using 12 1 / 4” Dia. , 15 Dia. And 17.5 Dia. Rock Roller Bits / Drag Bits In Consolidated, Semi Consolidated And Soft Formation Up To Required Depth Including Casing Boring And Casing Lowering As Required Including Cost Of Fuels And Lubricants Etc. As Required For Drilling. 27 Rate For Drilling By 17.5 Dia. Bita ) From 6 Mtr. To 60 Mtr. 28 60 Mtr. To 90 Mtr. 29 90 Mtr. To 120 Mtr. 30 120 Mtr. To 144 Mtr. 31 Electro-Logging Charge. 32 Supply And Delivery Of Washed Gravels Size Ranging From 1.80 Mm To 4.74 Mm. Conforming To Is 4097 : 1967. 33 Site Preparation, Temporary Latrine, Placement & Levelling Of Rig Machine, Mast Hoisting And Casing Drilling ( Upto 6 Mtr. ) Placement Of Casing With All Allied Works Necessary To Commence Drilling Woks And Wind Up Of All Machineries After Completion Of Drilling. 34 Transportation Cost Of Drilling Equipment And Accessories Rig Machine Etc. Including Cost Of Fuel, Lubricant & Loading Unloading The Materials From Store / Stack Yard / Suppliers Godown And Unloading / Stacking The Same At Site. ( Upto 60.0 Km Distance ) 35 Lowering The Tube Well Assembly ( Upvc Casing Pipe , Well Pipe, Strainer Along With Upvc Accessories ) Vertically In A Position With Proper Lowering Arrangement By Applying Necessary Jointing Compound Including Labour Cost For Subsequent Gravel Packing And Machine Operation Cost Etc 36 Cost Of Consumables For Drilling Rigs And Machineries. 37 Supply And Delivery Of Upvc Pipe ( Cd ) Conforming To Is 12818:2010. ( Cipet Certified ) A ) 250 Mm Dia. 38 B ) 200 Mm Dia. 39 Supply And Delivery Of Upvc Deep Well Screen ( Rds ) Pipes With Ribs Conforming To Is 12818:2010 . ( Cipet Certified ) A ) 200 Mm Dia. 40 Supply And Delivery Of Upvc Reducera ) 250Mm X 200 Mm Dia. 41 Supply And Delivery Of Upvc Capa ) 200 Mm Dia. 42 B ) 250 Mm Dia. 43 Supply And Delivery Of M.S. Housing Clamp 250 Mm Dia. 44 Supply And Delivery Of M.S .Centre Guide ( Special Type ) . 45 Development ( Min. 8 Hr. Continuous ) Of Tube Well By Using Suitable Air Compressor ( Min. Capacity: 600Cfm & Operating Pressure 14 Bar ) Followed By Yield Testing With Bht Pump ( Head :45 To 50Mtr., Discharge :1100 To 1000 Lpm And 25 Bhp Engine ) All Complete Including To & Fro Transportation Cost And Cost Of Fuels, Lubricants & Labour Etc. 46 Water Sample Collection And Chemical Test Including Arsenic Test. 47 Protective Sealing The Annular Space Between Tube Well Pipes & The Bore By Bentonite Clay Balls / Cement Slurry Above The Shrouded Gravels ( 3 M. Height ) . 48 Packing The Annular Space Between The Outsides Of The Housing Pipe & The Bore With Puddle Clay Balls Of Approved Size As Per Direction Of E.I.C. Including Cost Of All Materials, Labour Complete. 49 Supply And Delivery Of Bentonite Powder Conforming To Is 6186 :1986. 50 Labour For Making Arrangement For Showing Verticality Test Including The Cost For Hire Charges Of Tools And Plants, Scafolding, Labour Etc. All Complete 51 Mobilisation Charges Of All Tools & Plants Along With Accessories, Material, Labour, Supervision Etc. At Site Of Work Required In Connection With Boring And Testing Work, Including Setting Up Boring Rigs And Shifting To Different Bore-Hole Points Etc. And Also Including Withdrawal Of Same From The Site After Completion Of Work, Complete As Per Direction Of Engineer-In-Charge.B ) Detailed Investigation 52 Labour For Making Bore-Holes Of 150Mm To 250Mm Dia. By Any Standard Method To Any Depth Below Ground Level / Bed Level In All Kinds Of Soil Like Clay, Silt, Sand, Stiff Clay, Mixed Soils Etc. Except Rocks ( For The Purpose Of Collecting Disturbed & Un Disturbed Soil Samples, Conducting Standard Penetration Test At Suitable Intervals Etc. ) Including Preparation And Submission Of Bore-Log As Per Irc : 75 And 78 And Clause 2400 Of Specifications For Road & Bridge Works ( 5Th Revision ) , Published By Irc, And Also Including Hire Charges Of Tools And Plants Complete As Per The Direction Of Engineer-In-Charge.A ) When Casing Pipe Is Used To Prevent Collapse Of Bore Hole ( Casing Pipe To Be Finally Withdrawn ) ( I ) Depth 0M To 10M 53 Iii ) Collection Of Samples From The Bore Hole Made As Per B-A ( A ) Undisturbed 54 ( B ) Disturbed 55 Vi ) Standard Penetration Tests ( S.P.T. ) By Split Spoon Sampler In The Bore Hole As Per Is 2131. ( I ) 0.0M - 10.0M 56 A. Laboratory Investigation: I ) Liquid Limit As Per Is 2720 ( Part – V ) . 57 Ii ) Plastic Limit As Per Is 2720 ( Part – V ) 58 Iii ) Grain Size Analysis By Sieving As Per Is 2720 ( Part – Iv ) 59 Iv ) Grain Size Analysis By Hydrometer Method Asper Is 2720 ( Part – Iv ) . 60 V ) Determination Of Water Content As Per Is2720 ( Part – Ii ) 61 Vi ) Determination Of Specific Gravity As Per Is2720 ( Part – Iii ) . 62 Vii ) Direct Shear Test As Per Is 2720 ( Part – Xiii ) . 63 Viii ) Determination Of Unconfined Compression Strength As Per Is 2720 ( Part – X ) .A ) Undisturbed 64 Xiv ) Determination Of Consolidation Properties As Per Is 2720 ( Part – Xiv ) . 65 B ) Determination Of Shear Strength Parameters Of A Specimen Tested In Consolidated Undrained Tri-Axial Compression Test With Measurement Of Pore Water Pressure As Per Is 2720 ( Part – Xii ) . 66 C ) Determination Of Shear Strength Parameters Of A Soil From Consolidated Drained Test As Per Is 2720 ( Part – X ) 67 Tri-Axial Shear Test.A ) Determination Of Shear Strength Parameters Of A Specimen Tested In Unconsolidated Undrained Tri-Axial Compression Without Measurement Of Pore Water Pressure As Per Is 2720 ( Part-Xi ) . 68 Preparation And Submission Of Report In 6 ( Six ) Copies, Giving All Relevant Information Data Like Site Plan, Bore Log And Water Table, Test Results, Calculations, Discussions, Suggestions And Recommendations In Respect Of Suitable Foundation Etc. Including Determination Of Silt Factor Calculation Of Waterways And Complete Design Of Foundation Including Analysis Of Bearing Capacities And Settlements In Bound And Presentable Form Complete As Per Direction Of Engineer-In-Charge.B ) Detailed Investigation 69 Carriage Of All Disturbed & Undisturbed Samples From Site Of Work To The Divisional Office Or Elsewhere Including Loading And Unloading As Per Direction Of Engineer-In-Charge. Detailed Investigation. 70 Rising Cum Delivery Mainsupply Of Cidf & Specials As Per Is 1338-1992 71 Supply And Delivery Of Cidf Sluice Valve As Per I.S 14484-2000 ( Upadhaya / L&T / Kirlosker / Venus / Hazra ) I.S.I Make P.N -1.6.I ) 150 Mm Dia. 72 Ii ) 200 Mm Dia. 73 Iii ) 250 Mm Dia. 74 Supply Of C.I. Jeffy Coupling ( Flexible ) Joint Complete With Studtsnuts Bolts, Rubbon Sealing Reing As Per I.S.Specification.I ) 150 Mm Dia. 75 Ii ) 200 Mm Dia. 76 Iii ) 250 Mm Dia. 77 Carrying Ci / Di Pipes With Specials And Valves And Lowering Placing In Position And Laying Carefully Inside The Trenches In Proper Alignment And Gradient Etc. Including Earth Work In Excavation Of Adequate Width As Per Specification Having Min. Clear Cover From Top Of Pipe Is 1.10Mtr. Below Existing Ground Level In Any Kind Of Soil Including Mixed With Boulder, Road Sub-Grade And Its Flank, But Excluding Moorum And Laterite And Stone Etc.Without Damaging The Exisiting Telephone / Electric Cable Etc. ( In Case Of Damaged If Any Type Of Cable Line During Excecution , Necessary Damaged Charges As Applicable By The Respective Authority Will Be Borne By The Agency In His Own Cost ) Preparing The Bottom Surface For Continuous Bedding Of Pipe Line And Laying Pipes, Fitting, Fixing Specials And Valves With Bailing Out Water If Any Including Carriage Of Pipes, Specials And Valves From Local Deptt. Store Within 8Km And Back Filling The Trenches With Excavated Earth In Layers To Original Condition As Per Specification And Direction Of Eic. The Surplus Materials After Execution Of Work Are To Be Return To The Deptt. Store.N.B: I ) Any Deviation From Required Clear Cover Of 1.10Mtr., Due To Site Adverse Condition, Prior Permission Is To Be Obtained From The Eic In Exceptional Situation And Payment Will Be Made On Prorate Basis Over The Rate Of Entire Itemii ) No Payment Will Be Made Without Hydraulic Test Of The Pipe Line Either Part Or Fulliii ) The Pipes, Specials And Valves , Rubber Gasket Will Be Supplied Deptt. Free Of Cost.B ) 80 Mm Dia. 78 150 Mm Dia 79 200 Mm Dia 80 250 Mm Dia 81 Filling The Pipe Line With Water, Testing Hydraulically As Per I.S 3114-1965 ( Article-6 ) In Section Of A Length Not Exceeding 500Mtr. For Head Of Pressure As Per Specification Including Supplying Installing And Fixing All Equipments Such As Diesel Pump Set, Blank Flange, Pressure Gauge, Valve, Pressure Pump And All Other Tools And Plants Including Drilling Topping And Plugging Of Necessary Holes To Pipes, Blocking Ends Providing Temporary Thrust Block And Subsequent Blocking Of Holes And Other Jointing Materials And Dismantling And Removal Of The Same Including Disposal Of Water Etc. All Complete As Per Specification And Direction Of Eic. The Rate Is Inclusive Of Cost Of Requisite Water To Be Arranged By The Contractor ( Recovery Rate Of Water @ Rs.10.00 / M3, If Contractor Used Water From Deptt. Source ) .80 Mm Dia 82 150 Mm Dia 83 200 Mm Dia 84 250 Mm Dia 85 Cleaning Thoroughly The Inner Surface Of Pipe Line Including Specials And Valves By Flushing With Water And Subsequently Disinfection Of The Same Pipe Line By Flushing Again With Water Containing Bleaching Powder Resulting In Residual Chlorine Not Less Than 15Mg / Ltrs. After 24Hrs. Of Such Filling Including Laboratory Testing Of Water Samples Obtain From The Disinfested Pipe Line And Disposal Of Water From The Pipe Line After Completion Of The Work. The Rates Including Of Cost Of Requisite Water To Be Arranged By The Contractor ) ( The Rate Of Water @Rs. 10 / M3 May Be Recovered, If The Contractor Used Water From Deptt. Source ) .80 Mm Dia 86 150 Mm Dia 87 200 Mm Dia 88 250 Mm Dia 89 Labour For Horizontal Boring Under Pucca Road Etc…………....For Laying Of Pipe.I ) Up To 150 Mm Dia. ( Ci / Di / Ac / Gi ) / 180 Mm O.D Upvc & Hdpe 90 Making Rubber Gasket Joint To Ci / Di Pipes Maintaining Proper Alignment Level Etc. By Mechanical Arrangement With Or Without Using Mobile Cranes Where Necessary And With Help Of All Other Equipments Tools And Tackles Etc. As Required Providing Lubricants Of Approved Quality And Direction Of Eic. ( Rubber Gasket Will Be Supplied Deptt. Free Of Cost ) B ) 150 Mm Dia. 91 C ) 200 Mm Dia. 92 E ) 250 Mm Dia. 93 Making Flange Joint To Di / Ci Pipes, Specials And Valves Where Necessary With Supply Of Required Rubber Insertion And Nut Bolts, Washers Etc. Of Approved Quality And Type All Complete As Per Specification And Direction Of Eic ( Nut And Bolts Shall Be Of Tata / Gkw Rate ) .B ) 100 Mm Dia. 94 A ) 80 Mm Dia. 95 C ) 150 Mm Dia. 96 D ) 200 Mm Dia. 97 D ) 250 Mm Dia. 98 Construction Of Different Dia Sluice Valve / Air Valve / Washout Chamber In Different Sizes For Village Road Where Light Traffic Run And For Main Road Where Heavy Traffic Run As Deptt.Approved Drawing With 25Cm Thick Brick Work ( 1:6 ) Over Cement Concrete ( 4:2:1 ) Over A Single B / F Soling Over150mm.Thick Sand Filling In Foundation Including Earth Work In Excavation And Disposal Of Excess Earth From Work Site With Rcc ( 1:1.5:3 ) Cover Slab 100Mm / 150Mm Thick Slab On Top Of Chamber With 1% Reinforcement In Rcc Cover Slab With Necessary Opening For Operation Of Valve All Complete Including Cost Of Labour & Materials As Per Departmental Dwg. [ Reinforcement Type:- Other Manufactuerers Not Specified ] I ) 80 Mm To 150 Mm Dia Pipe 99 I ) 200 Mm Dia Pipe 100 I ) 250 Mm Dia Pipe 101 Cutting Di Pipe ( All Class & Type ) To Required Length With Cutting Device Etc. And Grinding The Cutting Portion With File As Per Direction And Satisfaction Of Eic.B ) 150Mm.Dia.To 200Mm.Dia Pipe 102 Carriage Of Different Type Of Departmental Pipes From Divisional / Sub-Divisional Store To The Work Site By Truck Including Loading, Unloading, Stacking Etc. Including Cost Of Fuel, Lubricant And Also Cost Of Driver, Helper Etc. And All Other Taxes And Charges As Applicable As Per Direction Of Eic.Upto 20 Km ( Above 50 Km Extra Cost 57 Rs / Km ) 103 Fhtcproviding Fhtc From The Existing Ci / Di / Upvc / Hdpe / Gi / Ac Distribution Pipeline By Installing 10 Mm Dia Nb Gun Metal Ferrule Conforming To Is 2692:1989 With Latest Amendments On Thesaid Pipeline And All Othersaccessories Like Saddle Piece Of Require Size To Fit The Existing Distribution Pipeline , Specials, Nut & Bolts Rubber Sheet , Washer Etc.And Laying15 Mm Nb Pvc ( Schedule 80 ) / 20 Mm Od Hdpe ( Pe 100 , Pn16 ) / 20 Mm Od Ppr-C ( Class -Sdr 7.4 / Pn16 ) Pipes Uptorequired Length With All Necessary Specials1.0 Metre Below The Ground Connecting Ferrule Including Cutting Trenches In All Sorts Of Soil And Filling Up Trenches As Per Directionsof The Engineer-In-Charge And Upto A Point Just Inside The Premises Of The House Hold Or As Directed By Eic. Supply And Installation Of A L5mm Dia. Alloy Ironbib Cock ( Tested To 2T Kg / Cm2 ) Above 1.0 Mtr. Frorn Ground, An Alloy Stop Cock Of 15 Mm Diawith Brass Spindle ( Tested Ta 21 Kg / Cm2 ) To Be Fitted In A Position As Directed By E.I.C. G.L Pipe Of Tata Make ( Mediurn Duty ) Of 2 Metre Length With All Necessary Specials To Continue From The End Of The Pvc / Hdpe / Ppr-C Pipe And Upto 1.0 M Above Ground Within The Premises Of Household.Note:1. Pvc Pipe Shall Of Schedule 80 ( Medium Duty ) Conforming To Astmd -1785And Threaded To Match With Gl Pipes As Per Is : 1239 ( Part - I ) .2. Ppr-C ( Poly Propylene Randam Copolymer ) Pipe Shall Be 3-Layer Confirming To Is :15801 Uv Stabilised & Anti-Microbiol Fusion Welded, Having Thermal Stabitity For Hot & Cold Water Supply Including All Pp-R Plain & Brass Threaded Porypropylene Random / Fittings . 3. Rate Is Exclusive Of Supply And Deliveryof10 Mm Nb Gun-Metal Ferrule.Supply & Laying Of 15Mm Nb Pvc ( Schedule 80 ) / 20Mm Od Hdpe ( Pe 100, Pn16 ) / 20 Mm Od Ppr-C ( Class -Sdr7.4 / Pn19 ) Pipes.B ) Above 10 M Upto 20 M Length 104 150 Ohr Earth Work In Excavation Of Foundation Trenches Or Drains Or Septic Tank Soak Well Etc. In All Sorts Of Soil ( Including Mixed Soilbut Excluding Latarite Or Sand Stone ) Including Removing Spreading Or Stack- Ing The Spoils Within A Lead Of 75M. As Directed. The Item Includes Necessary Trimming The Sides Of The Trenches, Leveling Dressing And Ramming The Bottom, Bailing Or Pumping Out Water Etc. As Required Complete. 105 Depth Of Excavation Not Exceeding 1.5 Mtr. But Not Requiring Shoring 106 Beyond 1.5 Mtr. Upto 3.0 Mtr.But Not Requiring Shoring 107 Filling In Foundation Or Plinth By Fine Sand In Layers Not Exceeding 150 Mm As Directed & Consolidating Same By Through Saturation With Water And Ramming Complete Including The Cost Of Supply Of Sand. ( Payment To Be Made On The Basis Of Measurement Of Finished Quantity Of Work. ) ( A ) By Fine Sand. 108 Earth Work In Filling In Foundation Trenches Or Plinth With Good Earth In Layers Not Exceeding 15Cm. Including Watering And Ramming Etc. Layer By Layer Complete. ( Payment To Be Made On Basis Of Measurement Of Finished Quantity Of Work ) 109 Single Brick Flat Soling Of Picked Jhama Bricks Including Ramming & Dressing Bed To Proper Level & Filling Joints With Powdered Earth Or Local Sand Including Cost Of Sand Etc Complete As Per Direction & Specification. 110 Oridinary Cement Concrete M-15 ( Mix 1:2:4 ) With Graded Stone Chips ( 20 Mm.Down ) Excluding Shuttering And Reinforcement, If Any, In Ground Floor As Per Relevent Is Code 456-2000. From …...Concidaring 73 Km.A ) Pakur / ( Up To Ground Level ) . 111 Controled Cement Concrete With Well Graded Stone Chips ( 20 Mm Nominal Size ) Excluding Shuttering & Reinforcement With Complete Design Of Concrete As Per [ Isi : 456 And Relevant Special Publication. Submission Of Job Mix Formula After Preliminary Mix Design After Testing Of Concrete Cube As Per Direction Of The Eic. Consumption Of Cement Will Not Be Less Than 300Kg Of Cement With Super Plasticiser Per Cum. Of Controlled Conc. But Actual Consumption Will Be Determined On The Basis Of Preliminary Test & Job Mix Formuta. In Ground Floor And Foundation. [ Using Concrete Mixture ] M 25 Gradepakur Varietyfor Works In Foundation, Basement And Upto Roof Of Ground Floor / Upto4 Mtr ( Column, Bracing ) 112 4 M To 8 M ( Add Extra Over The Rate Of Ground Floor For Basement And Each Additional Floor Above Ground Floor For ( 113 8 M To 12 M ( Add Extra Over The Rate Of Ground Floor For Basement And Each Additional Floor Above Ground Floor For ( 114 12 M To 16M ( Add Extra Over The Rate Of Ground Floor For Basement And Each Additional Floor Above Ground Floor For ( 115 16 M To 20 M ( Add Extra Over The Rate Of Ground Floor For Basement And Each Additional Floor Above Ground Floor For ( 116 20 M & Above ( Landing, Step, Roof Dome, Walk Way, Platform ) ( Add Extra Over The Rate Of Ground Floor For Basement And Each Additional Floor Above Ground Floor For ( 117 Controled Cement Concrete With Well Graded Stone Chips ( 20 Mm Nominal Size ) Excluding Shuttering & Reinforcement With Complete Design Of Concrete As Per [ Isi : 456 And Relevant Special Publication. Submission Of Job Mix Formula After Preliminary Mix Design After Testing Of Concrete Cube As Per Direction Of The Eic. Consumption Of Cement Will Not Be Less Than 320Kg Of Cement With Super Plasticiser Per Cum. Of Controlled Conc. But Actual Consumption Will Be Determined On The Basis Of Preliminary Test & Job Mix Formuta. In Ground Floor And Foundation. [ Using Concrete Mixture ] M 30 Grade.In Heel Beam, Conical Slab, Bottom Dome, Bottom Ring Beam, Walkway, Shell Wall Etc. Pakur Variety16 M To 20 M ( For Heel Beam ) ( Add Extra Over The Rate Of Ground Floor For Basement And Each Additional Floor Above Ground Floor For ( 118 B ) 20 Mtr. And Above ( Cell Wall, Floor, Top & Bottom Ring Beam & Bottom Doom, Walk Way And Lantern Etc ) . ( Add Extra Over The Rate Of Ground Floor For Basement And Each Additional Floor Above Ground Floor For ( 119 Hire And Labour Charges For Shuttering With Centreing And Necy. Staging Upto 4M. Using Approved Stout Props And Thick Hard Wood Planks Of Approved Thickness With Required Bracing For Conc. Slabs, Beams, Columns, Lintels Curved Or Straight Includg. Fitting, Fixing And Striking Out After Completion Of Works.From Foundation To 4M Above Glabove 25 Mm And Upto 30 Mm Wooden Shuttering As Per Direction Of Eic. 120 Hire & Labour Chages For Shuttering For Conc. Work In Overhead R.C. Reservoir On Separate R.C. Frame Including Fitting, Fixing & Stricking Off After Completion Of Work ( From 4M To Top Of Reservoir ) . 121 Extra For Staging Beyond 4 Mtr ( Mode Of Measurement Area Of Unsupported Horizontal Projection, Where Staging Beyond 4 Mtr. Is Practically Un-Avoidable ) Staging Height To Be Considered For 4 Mtr. Above G.L. To Mean Height Of Soffit And Plan Area In Between Out Side Of Ring Beam Minus Hollow Shaft If Any And Annular Ring Beam Of Staging Above Metial 4 Mtr. 122 Reinforcement In Reinforced Conc. Work In All Sorts Of Structures Includg. Dist.Bars, Stirrups, Binders Etc., Initial Straightening And Removal Of Loose Rust ( If Necy. ) Cutting To Requisite Length, Hooking And Bending To Correct Shapde, Placing In Proper Position And Binding With 16 Gauge Balck Annealed Wire At Every Intersection, Complete As Per Drawing And Direction. ( A ) For Works In Foundn. Basement And Upto Roof Of Ground Floor / Upto 4M. ( I ) Tor Steel / Mild Steel. Sail / Tata / Rinlfor Works In Foundation, Basement And Upto Roof Of Ground Floor / Upto 4 M. 123 Extra For Works Beyond The Roof Of Ground Floor / Initial 4 M. To 8 Mtr. ( Add Extra Over The Rate Of Ground Floor / Initial 4 M For Each Basement Floor And Each Additional Floor Below / Above Ground Floor 124 8 M To 12 M ( Add Extra Over The Rate Of Ground Floor / Initial 4 M For Each Basement Floor And Each Additional Floor Below / Above Ground Floor 125 12 M To 16M ( Add Extra Over The Rate Of Ground Floor / Initial 4 M For Each Basement Floor And Each Additional Floor Below / Above Ground Floor 126 16 M To 20 M ( Add Extra Over The Rate Of Ground Floor / Initial 4 M For Each Basement Floor And Each Additional Floor Below / Above Ground Floor 127 Beyond 20 M ( Add Extra Over The Rate Of Ground Floor / Initial 4 M For Each Basement Floor And Each Additional Floor Below / Above Ground Floor 128 Supplying & Labour For Mixing Of Super Plasticizer Of Approved Make Brand Sika / Cico Conforming To Is-2645-1975 & Is-9130-1979 To Be Need In Mortar Admixture @ 0.20% By Wt. Of Cement ( I.E 100Ml Per 50Kg Of Cement ) For Improving Workability, Reducing Shrinkage And Improvement Of Water Tightness Of The Concrete. 129 ( A ) Applying 2 Coats Of Bonding Agent With Synthetic Multi Functional Rubber Emulsion Having Adhesive And Water Proofing Properties By Mixing With Water In Proportion ( 1 Bonding Agent : 4 Water : 6 Cement ) As Per ManufacturerS Specification 130 ( B ) Applying 2 Coats Of Non-Toxic Acrylic Polymer Modified Paint Having Adhesive & Waterproofing Properties By Mixing In Proportion ( 1 Liquid: 4 Cementitious Material ) Or As Per ManufacturerS Specification For Water Proofing Layer In Water Tank Etc. 131 Supplying Mosquito Proof Net Made Of Polythene ( Netlon ) Size 75Cm. X 75Cm. For Ventilator Including Fitting, Fixing In The Best Sal Wood Frame Of 8Cm. X 5Cm. Cross Section With Necessary Wooden Batten Fixing The Assembly With Necessary Ms Clamp In Rcc Wall At The Lantern. 132 Wood Work In Door And Window Frame Fitted And Fixed In Position Complete Including A Protective Coat Of Painting At The Contact Surface Of The Frame Exluding Cost Of Concrete, Iron Butt Hinges And M.S Clamps. ( The Quantum Should Be Correted Upto Three Decimals ) .Wood Work In Door And Window Frame Fitted And Fixed In Position Complete Including A Protective Coat Of Painting At The Contact Surface Of The Frame Exluding Cost Of Concrete, Iron Butt Hinges And M.S Clamps. The Quantum Should Be Correted Upto Three Decimals. D ) Sal Local 133 Artificial Stone In Floor, Dado, Staircase Etc. With Cement Concrete ( 4:2:1 ) With Stone Chipes Laid In Panels As Directed Toping Made With Ordinary Or White Cement ( As Necy. ) & Marble Dust In Proportion ( 2:1 ) Including Smooth Finishing & Rounding Off Corners Including Rackng Out Joints Or Roughening Of Conc. Surface & Including Application Of Cement Shlurry Before Flooring Works, Using Cement @ 1.75 Kg / Sqm All Complete Including All Materials & Labour Above Heel Beam. 3 Mm Thick Toping High Polishing Grinding On This Item Is Not Permitted With Ordinary Cement. ( A ) 25 Mm Thick. ( Reservoir Inside Floor & Wall, Walk Way Floor, Cc Step, Platform Landing ) . 134 Supplying At Site Filling , Fixing , Erecting And Building In Position Where Necessary 600Mm.Wide M.S. Cat Ladder As Per Design Consisting Of 2Nos. Ismc 150, 8Mm.Thick With Necessary Base Plate Of 8Mm.Thick 100Mm.Wide M.S. Plate As Steep @ 300Mm.A / C Supported On Isa 50X50x6 , Isa 60X60x8mm.Thick Both Side As Per Requirement.900Mm.Ht. As Post On One Side / Both Side @ 1000 And Isa 45X45x6 As Horiz. Runner To Cover Side Railing Including Fabrication, Welding, Drilling Etc.As Per Drawing And Direction And Finished With Two Coats Of Synthetic Enamel Painting Over A Coat Of Primer Etc. All Complete As Per Direction Of Eic. For Cat Ladder, Railing Of Stair & Platform, Walkway Etc. E ) From 20Mtr. To 24Mtr. @ 1.5%Extra Of ( D ) 135 Supplying At Site Hoisting, Fitting, Fixing Erecting And Building In Position Where Necessary 450Mm.Wide Ladder As Per Design Consisting Of 2Nos. M.S.Plate Of 8Mm.Thick With Necessary Base Plate 60Mm Wide; And 16Mm.Dia M.S.Round Or Square Bar As Steeps Placed @ 300 C / C Including Fabrication, Welding Drilling Etc. As Per Drawing And Direction And Finished With Two Coats Of Synthetic Enamel Painting Over A Coat Of Red Lead Primer Etc. All Complete As Per Direction Of The Eic 136 Supplying, Fitting, Fixing 900 Mm High G.I. Pipe Railing For R.C.C Stair Cat Ladder Walk Way Fabrication, Erection, Welding Of 40 Mm G.I ( Non Tata Medium ) Pipe Place At Top Of Railing And 2 Nos 25 Mm Dia. G.I Pipe ( Non Tata Medium ) Placed Equally In Between Railing Top & Floor Vertical Post Of Railling Are 40 Mm Dia. G.I Pipe ( Non Tata Medium ) Placed At 900 Mm C / C . The Each End Of The Vertical Post Is Join By The 62 Mm ( 25 Mm X 6 Mm X 0.062 M Long ) Ms Flat And 150 Mm Length ( Propes Pipes ) Are Grouted In Concrete Base Of Stair, Walk Way Etc. All Complete With Supplying Of All Materials Including Hoisting Up To The Any Height Complete With 2 Coats Of Painting With Super Gloss ( Hi Gloss ) In Any Shade Except White And Black Over A Coat Of Primer Complete As Per Direction Of E.I.C. 137 Supplying Fitting And Fixing In Position Reinforced Cement Polymer Concrete Manhole Cover With Matching Frame As Per Is-12592 ( Md ) A ) Square. I ) 600 Mm X 600 Mm X 50 Kg ( Approx ) A ) 5Mt Load Bearing Capacity Round Manhole Cover Parovided With Two Nos. Lifter Hook With Machining Frame Of Size 550Mm X 65Mm ( Cover ) And 650Mm X 125Mm ( Frame ) Opening 470Mm And Wt. 90Kg. Approx. 138 Horn Gap Lighting Arrestor Complete Parts And Pin Insulators Supplying, Fitting Fixing All Complete As Per Direction Of E.I.C. 139 Plaster ( To Wall, Floor, Ceiling Etc. ) With Sand And Cement Mortar Including Rounding Off Or Chamfering Corners As Directed And Raking Out Joints Including Throating, Nosing And Drip Course, Scaffolding / Staging Where Necessary. ( Excluding Cost Of Chipping Over Concrete Surface ) With 1:4 Cement Mortar 15Mm Thick Plaster. From 16M To 20M Of Reservoir 140 With 1:4 Cement Mortar 15Mm Thick Plaster. From 20M And Above Of Reservoir 141 With 1:3 Cement Mortar 10Mm Thick Plaster Above 20 M & Above 142 Applying Exterior Grade Acrylic Primer Of Approved Quality And Brand On Plastered Or Concrete Surface Old Or New Surface To Receive Decorative Textured ( Matt Finish ) Or Smooth Finish Acrylic Exterior Emulsion Paint Including Scraping And Preparing The Surface Throughly, Complete As Per ManufacturerS Specification And As Per Direction Of The Eic.A ) One Coat Gl To 4 M 143 4M To 8 M 144 8 M To 12 M 145 12 M To 16M 146 16 M To 20 M 147 Above 20 M 148 Protective And Decorative Acrylic Exterior Emulsion Paint Of Approved Quality As Per Manufacturers Specification And As Per Direction Of Eic To Be Applied Over Acrylic Primer As Required. The Rate Includes Cost Of Material , Labour, Scaffolding, And All Other Incidental Charges But Excluding The Cost Of Primer. Two Coat. Super Protective 100% Acrylic Emalsion.Gl To 4 M 149 4M To 8 M 150 8 M To 12 M 151 12 M To 16M 152 16 M To 20 M 153 Above 20 M 154 Construction Of Different Dia Sluice Valve / Air Valve / Washout Chamber In Different Sizes For Village Road Where Light Traffic Run And For Main Road Where Heavy Traffic Run As Deptt.Approved Drawing With 25Cm Thick Brick Work ( 1:6 ) Over Cement Concrete ( 4:2:1 ) Over A Single B / F Soling Over150mm.Thick Sand Filling In Foundation Including Earth Work In Excavation And Disposal Of Excess Earth From Work Site With Rcc ( 1:1.5:3 ) Cover Slab 100Mm / 150Mm Thick Slab On Top Of Chamber With 1% Reinforcement In Rcc Cover Slab With Necessary Opening For Operation Of Valve All Complete Including Cost Of Labour & Materials As Per Departmental Dwg. [ Reinforcement Type:- Other Manufactuerers Not Specified ] 150 Mm Dia 155 100 Mm Dia. 156 Supply & Delivery Atfollowing Nominal Sizes And Classes Cidf Sluice Valve In Terms With Is 14846-2000, Inside Screw Non Rising, Stern, Flanges Faced And Drilled As Per Is 1538-1993, Spindle / Stern With Ssaisi410 As Per Is 6603-1972, Body, Bonnet, Wedge, Stuffing Box Gland Thrust Plate, Cap Inconformity With Is 210-1978, With An Amendments Order Is Specification As Stated. ( Upadhaya / Kirlosker / Kejriwal / Ivp / L & T / Vag / M & P ) Make Class-Pn 1.0 With Cap.150 Mm Dia 157 100 Mm Dia. 158 Hoisting, Erection , Placing Connecting With Pipes And Specials Cidf Pipes, Specials ) Securing With Building Specials Providing Stays, Clamps As Required Including Cost Of Staging Platform For The Work Etc.All Complete In All Respects As Per Drawing And Direction Of Eic.100 Mm Dia. 159 150 Mm Dia. 160 Laying Of Cidf / D.I Pipes With Specials, Valves Etc. In Trenches Including Excavation In All Sorts Of Soil, Moorum, Soft Rock And Refilling The Trenches After Laying & Jointing Of Pipes Etc. All Complete As Per Specification And Direction Of Eic.100 Mm Dia. 161 150 Mm Dia 162 Fitting, Fixing Duck Foot Bend Including Construction Of Cement Concrete ( 4:2:1 ) Base With Stone Chips Of Approved Grade & Quality & Including Excavation Of Earth Etc. Complete In All Respect100mm.Dia 163 150Mm.Dia 164 Hoisting, Fitting, Fixing Of Bell Mouth With Puddle Collar In Rcc Work Complete In All Respect As Per Drawing, Specification And Direction Of Eic. 100 Mm Dia. 165 150Mm.Dia 166 Making Flange Joint To Cidf Pipe, Specials, Valves Etc.With Supply Of Necessary Nuts And Bolts, Rubber Insertion Of 6Kg / M2 ( 3Mm Gauge ) And Materials Required Including Dewatering If Any Tools And Plants, Labour Cost Etc. As Per Specification And Direction Of Eic ( Nut And Bolts Shall Be Of Tata / Gkw Make ) For100 Mm Dia. 167 150Mm.Dia 168 Making Arrangement For Water Tightness Test Conforming To The Provision Laid In Is:3370 ( Pt-I ) 1956 By Filling With Water Upto Top Water Level ( Twl ) As Shown In The Drawing And As Per Direction Of Eic. ( If Water Is Supplied By The Department Rate Shall Be Reduced As Per Prevailing Departmental Rate ) 169 Disinfection & Washing The Tank And Pipe Connections Including Cleaning The Inside Of The Tank Etc Complete. 170 Neat Cement Punning About 1.5 Mm Thick In Wall, Dado, Window, Sills, Floor, Drain Etc.Note-Cement 0.152 Cu.M. Per 100 Sq.M. 171 Number Plaque Of Building ( Plaque Size Up To 225 Mm X 225 Mm ) Made Of Sand Cement Plaster ( 1 : 2 ) On Face Of Wall Or Plinth With 50 Mm Size Letters P.W.D And The Number Of The Structure Formed Thereon ( In Sunk Type ) Including Painting The Letters And The Number Complete As Per Direction. 172 Supplying And Laying Standard Four Course Bituminous Water Proofing Treatment As Per Specification Laid Down In I.S. 1346 - 1991 To Be Finished With Pea Size Gravel Including Necessary Preparatory Works Such As Shaping Mouth Of Outlets, Cutting As And Where Necessary And Refilling With Sand And Cement Mortar ( 4:1 ) Or Cement Concrete ( 1:2:4 ) With Graded Stone Chips Before Undertaking The Treatment Including Cutting Grooves In Parapet And Inserting Edge Of Felt And Mending Good Damage Complete In All Respect As Per Direction Of Engineer - In - Charge Including Cost Of All Materials And Labours And Incidental Charges But Excluding The Cost Of Cement Mortar Or Concrete Required For Levelling And Grading. ( In Sloped Roof Course Sand Of Approved Varieties Is To Be Used In Place Of Pea Size Gravels As Fourth And Final Course. ) I ) 1St And 3Rd Course With Bonding Materials Of Hot Applied Industrial Blown Type Bitumen Of Grade 85 / 25 Or 90 / 15 Conforming To I.S.702 - 1988 @ 12Kg / 10Sqm On Each Layer.Ii ) 2Nd Course With Hessian Base Self Finished Bitumen Type3r.-I Conforming To I.S. 1322-1993 ( Weighing 23Kg / 10Sqm Gross With Bitumen Content 12.10Kg / 10Sqm ) Tested Under The Provision Of I.S. 13826 - 1993 Part Vii.Iii ) 4Th Course With Washed And Clean Pea Sized Gravel Or Grit @ 0.006 Cum / Sqmb. Over Sloped Roof. 173 Supply The Following Materials For Connection Of Inlet, Outlet, Overflow And Delivery Line Of Orh Asper Departmental Drawing. A ) C.I.D.F. Pipe As Per I.S.7181 - 1986 With Letest Revision. 174 Bituminous Filer Of Approved Type In Excavation Joint Between The Shell Wall & Roof Including Finishing The Top Surface As Per ;Drawing, Specification And Direction Of Eic 175 Supplying Hoisting, Fitting Fixing Approved Type Water Level Indicator With Copper Float, Guide Pulley, Wire Boards Etc. As Per Standard Specification And Direction And Satisfaction Of Eic 176 Commissioning The R.C.C. Over Head Reservoir By Operating Of All Category Of Sluice Valves , Testing Of Hoisted Pipe Joints Including Repairing The Leakage ( S ) If Detected , Including Making Inter Connections, Flange Jointing / Lead Jointing With The Newly Laid Rising Main And Distribution Main All Complete As Per Direction Of The Eic. 177 Suppling, Fitting And Fixing M.S Clamps Door And Window Frame Made Of Flatbent Bar, End Bifurcated With Necessary Screws Etc. By Cement Concrete ( ( 1:2:4 ) As Perdirection Of Concrete Will Be Paid Separatelt. ( C ) 40Mm X 6 Mm, 125 Mm Length 178 ( A ) M.S Or W.I. Ornamental Grill Approved Design Joints Continuously Welded With M.S W.I Flats And Bars Of Windows Railing Etc. Fitted And Fixed With Bbnecessary Screws And Luge In Ground Floor. ( Add Extra @1% For Each Addl. Upto 4Th Floor And @1.25% For Each Addl. Floor Above 4Th Floor ) Grill Weighing Above 10 Kg. / Sq.M And Upto 16 Kg. / Sq. M. 179 Grill Weighing Above 16 Kg. / Sq.Mtr And Above 180 Welding In M.S Structurral Work Gas Or Electric Continuous Weld 181 Priming One Coat On Timber Or Plaster Surface With Synthetic Oil Bound Primer Of Approved Quality Includingsmoothening Surfaces By Sand Papering Etc. 182 Priming One Coat On Steelor Metalsurface With Synthetic Oil Bound Primer Of Approved Quality Includingsmoothening Surfaces By Sand Papering Etc. ( This Item Is Applicable To New Work Or Old Work When The Original Surface Has Been Exposed By Removal Of Old Paint ) 183 Painting With Best Quality Synthetic Enamel Paint Of Approved Make And Brand Including Smoothening Surface By Sand Papering Etc. Inclding Using Of Approved Putty Etc, . On The Surface, If Necessary :On Timber Or Plastered Surfacewith Super Gloss ( Hi-Gloss ) Two Coat ( With Any Shade Except White ) 184 On Steel Or Other Metal Surface: With Super Gloss ( Hi-Gloss ) Two Coat ( Any Shade Except White ) 185 A ) Earthing With 50Mm.Dia G.I. Pipe3.64Mm.Thick X 3Mtr. ( 10”-0” ) Long And L;1 X 4Swg G.I. ( Hot Dip ) Wire 4Mtr. Long 13Mm. Dia X 80Mm.Long G.I.Bolts, Double Nuts , Washer Including S&F 15Mm.Dia G.I.Pipe Protection ( 1Mtr. Long ) To Be Filled With Bitumen Partly Below Ground Level To An Av. Depth Of 3.65M Below G.L. And Restoring The Surface Duly Rammed As Per Iee Rulei ) For Soft Soil. B ) By Tata Medium G.I.Pipe. 186 Supplying Hdpe ( Materials Grade Pe-100 ) Pipes Conforming To Is 49841995 With Latest Revision & Amendments If Any With Necessary Specials ( Excluding Cost Of Cidf Valves ) Including Labour Charges For Earth Work In Excavation In Any Kind Of Soil Including Mixed Soil With Boulder, Road Sub-Grade And Aits Flank But Excluding Moorum Laterite Or Sand Stone / Hard Rock Cutting With Chisel Required Including Cutting Road Flank / Brick Pavement Etc. Without Damaging The Exisiting Telephone / Electrical Cable Line Etc. ( In Case Of Damage Of Any Type Of Cable Line By The Agency At The Time Of Execution Necessary Damage Charge As Applicable By The Respective Authority Will Have To Be Brone By The Agency At His Own Cost ) Upto The Depth ( Av. ) So As To Maintain 1.10M.Earth Cushion From Top Of The Pipe Upto G.L. Including Loading Unloading Carrying Lowering Laying Fitting Fixing Carefully Pipes, Valves And Specials With The All Types Of Jointing Materials In Trenches Maintaining Proper Levels And Alignment Jointing The Pipes And Specials By Butt Welding / Adopting Suitable Method ( But Weld Jointing With Help Of Hydraulic Tack And Trimming Machines, Hitter Etc. For Reaching At Necessary Melting Point Of Hdpe Pipe So That Joint Can Be Monolithic ) So As To Facilitate The Maintenance Of Pipe Line Locally As Per Conventional Method In Future. ( A ) Pressure Rating : Pn 6 ( I ) Laying Of Pipe Line Including Cost Of Pipe Only Excluding Cost Of Specials / Fittings Valves.B ) 90Mm ( Od ) 187 B ) 110 Mm ( Od ) 188 C ) 125Mm ( Od ) 189 D ) 140 Mm ( Od ) 190 Filling The Pipe Line With Water, Testing Hydraulically As Per I.S 3114-1965 ( Article-6 ) In Section Of A Length Not Exceeding 500Mtr. For Head Of Pressure As Per Specification Including Supplying Installing And Fixing All Equipments Such As Diesel Pump Set, Blank Flange, Pressure Gauge, Valve, Pressure Pump And All Other Tools And Plants Including Drilling Topping And Plugging Of Necessary Holes To Pipes, Blocking Ends Providing Temporary Thrust Block And Subsequent Blocking Of Holes And Other Jointing Materials And Dismantling And Removal Of The Same Including Disposal Of Water Etc. All Complete As Per Specification And Direction Of Eic. The Rate Is Inclusive Of Cost Of Requisite Water To Be Arranged By The Contractor ( Recovery Rate Of Water @ Rs.10.00 / M3, If Contractor Used Water From Deptt. Source ) .B ) For Upvc / Hdpe Pipea ) 90 Mm ( Od ) 191 B ) 110 Mm ( Od ) 192 C ) 125Mm ( Od ) 193 D ) 140 Mm ( Od ) 194 C ) 200 Mm Dia 195 E ) 300 Mm Dia 196 Cleaning Thoroughly The Inner Surface Of Pipe Line Including Specials And Valves By Flushing With Water And Subsequently Disinfection Of The Same Pipe Line By Flushing Again With Water Containing Bleaching Powder Resulting In Residual Chlorine Not Less Than 15Mg / Ltrs. After 24Hrs. Of Such Filling Including Laboratory Testing Of Water Samples Obtain From The Disinfested Pipe Line And Disposal Of Water From The Pipe Line After Completion Of The Work. The Rates Including Of Cost Of Requisite Water To Be Arranged By The Contractor ) ( The Rate Of Water @Rs. 10 / M3 May Be Recovered, If The Contractor Used Water From Deptt. Source ) .B ) For Upvc / Hdpe Pipea ) 90 Mm ( Od ) 197 B ) 110 Mm ( Od ) 198 C ) 125Mm ( Od ) 199 D ) 140 Mm ( Od ) 200 A ) For Ci / Di Pipeb ) 150 Mm Dia 201 C ) 200 Mm Dia 202 E ) 300 Mm Dia 203 Carrying Ci / Di Pipes With Specials And Valves And Lowering Placing In Position And Laying Carefully Inside The Trenches In Proper Alignment And Gradient Etc. Including Earth Work In Excavation Of Adequate Width As Per Specification Having Min. Clear Cover From Top Of Pipe Is 1.10Mtr. Below Existing Ground Level In Any Kind Of Soil Including Mixed With Boulder, Road Sub-Grade And Its Flank, But Excluding Moorum And Laterite And Stone Etc.Without Damaging The Exisiting Telephone / Electric Cable Etc. ( In Case Of Damaged If Any Type Of Cable Line During Excecution , Necessary Damaged Charges As Applicable By The Respective Authority Will Be Borne By The Agency In His Own Cost ) Preparing The Bottom Surface For Continuous Bedding Of Pipe Line And Laying Pipes, Fitting, Fixing Specials And Valves With Bailing Out Water If Any Including Carriage Of Pipes, Specials And Valves From Local Deptt. Store Within 8Km And Back Filling The Trenches With Excavated Earth In Layers To Original Condition As Per Specification And Direction Of Eic. The Surplus Materials After Execution Of Work Are To Be Return To The Deptt. Store.N.B: I ) Any Deviation From Required Clear Cover Of 1.10Mtr., Due To Site Adverse Condition, Prior Permission Is To Be Obtained From The Eic In Exceptional Situation And Payment Will Be Made On Prorate Basis Over The Rate Of Entire Itemii ) No Payment Will Be Made Without Hydraulic Test Of The Pipe Line Either Part Or Fulliii ) The Pipes, Specials And Valves , Rubber Gasket Will Be Supplied Deptt. Free Of Cost.B ) 150 Mm Dia. 204 C ) 200 Mm Dia. 205 E ) 300 Mm Dia. 206 Making Rubber Gasket Joint To Ci / Di Pipes Maintaining Proper Alignment Level Etc. By Mechanical Arrangement With Or Without Using Mobile Cranes Where Necessary And With Help Of All Other Equipments Tools And Tackles Etc. As Required Providing Lubricants Of Approved Quality And Direction Of Eic. ( Rubber Gasket Will Be Supplied Deptt. Free Of Cost ) B ) 150 Mm Dia. 207 C ) 200 Mm Dia. 208 E ) 250 Mm Dia. 209 Construction Of Different Dia Sluice Valve / Air Valve / Washout Chamber In Different Sizes For Village Road Where Light Traffic Run And For Main Road Where Heavy Traffic Run As Deptt.Approved Drawing With 25Cm Thick Brick Work ( 1:6 ) Over Cement Concrete ( 4:2:1 ) Over A Single B / F Soling Over150mm.Thick Sand Filling In Foundation Including Earth Work In Excavation And Disposal Of Excess Earth From Work Site With Rcc ( 1:1.5:3 ) Cover Slab 100Mm / 150Mm Thick Slab On Top Of Chamber With 1% Reinforcement In Rcc Cover Slab With Necessary Opening For Operation Of Valve All Complete Including Cost Of Labour & Materials As Per Departmental Dwg. [ Reinforcement Type:- Other Manufactuerers Not Specified ] I ) 80 Mm To 150 Mm Dia Pipe 210 I ) 200 Mm Dia Pipe 211 Bituminous Pucca Road ( Approx. 450Mm Depth ) Cutting By Using Gaiti, Chisel, Hammer Etc. And Picking Uip The Withdrawing Excavated Materials And Remove The Same Within Distance Of 30Mtr. At Least All Complete For Fixing / Crossing All Dia Of Pipe Line As Per Direction Of Eic. 212 Making Barricading Of Excavation Trenches Of Road Width Upto 15Mtr. To Avoid Any Accident By Providing 75Mm Dia Bamboo Post Placed Vertically & Horizontally With The Help Of 6”Size Iron Rail As Per Direction And Satisfaction Of Eic. ( Applicable Where Critical Situation Arise And Take Up The Work As Per Direction Of Eic ) 213 Labour For Horizontal Boring Under Pucca Road Etc…………....For Laying Of Pipe.I ) Up To 150 Mm Dia. ( Ci / Di / Ac / Gi ) / 180 Mm O.D Upvc & Hdpe 214 Making Village Roadcrossing ( Average 3 M Width ) By Horizontal Augor Boring For Accmodation Of Laying Of Average 3 ( Three ) Nos 15 Mm Dia Gi Pipe For Fhtc Or As Per Direction Of Eic. 215 Ordinary Cement Concrete ( Mix 1:2:4 ) With Graded Stone Chips ( 20 Mm Nominal Size ) Excluding Shuttering And Reinforcement, If Any, In Ground Floor As Per Relevant Is Codes. ( B ) River Bazree 216 Bamboo Pile Walling Made Of 65 Mm To 75 Mm Dia. Bamboo ( In Single Line ) Driven About Half Length Into The Ground At Very Close Spacing Side By Side Including Necessary Bamboo Stays Ties Runners Etc And Lining The Exposed Portion With Sheets Made Form Cutdrums Fitted And Fixed Complete As Per Direction. 217 Supply And Delivery Of Cidf Sluice Valve ( Special Type ) Pw-1.00 Of Different Dia Make With Ci Double Flanged Non Rusting Spindle Sluice Valves Conforming To Is 14846 -2000 With Latest Emended Having Body Dome / Bonnet And Cover Of C.I.Gr-F.G 210Mtr. Spindle Of Is-6603 G.R- 12 / Gr-13 Non-Magnetic, Nuts Seat Rings Are Of Gunonetal As Per Is:318 Ltb-2 Flanges And Drilled To Is:1538 Part Iv & Vi Valves Are Suitable For Max. Working Pressure Of 10Kg / Cm2 ( Seat Test ) And Body Tested To 15Kg / Cm2. N.B: The Above Item Should Be Procured From The Reputed Manufactures As Per Deptt. Approved Vender List150 Mm Dia

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 21-Dec-2022 dCorrigendum2 Other 24-12-2022

Key Value

Document Fees
Refer document
EMD
INR 314843.0 /-
Tender Value
INR 1.57 Crore /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail