Tender For Preparation Of Detailed Project Report (Dpr) For Construction, Design And Supervision Of Augmentation, Reorganization And Rehabilitation Of Urban Water Supply Scheme Kota (For Both Kota North And Kota South Nagar Nigam Separately) Amrut 2.
Tender Overview
Project Description
Preparation Of Detailed Project Report ( Dpr ) For Construction, Design And Supervision Of Augmentation, Reorganization And Rehabilitation Of Urban Water Supply Scheme Kota ( For Both Kota North And Kota South Nagar Nigam Separately ) Amrut 2.0 Dpr
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 22-Dec-2022 | Corrigendum | Technical Bid | 04-Jan-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | Survey and Preparation of DPR - PART-\"A\" |
| 2 | Preparation of detailed Project Report (DPR) for Augumentation, Reorganisation and Rehabilitation of Urban Water Supply Scheme Kota(for both Kota North & Kota South Nagar Nigam separately) under the scope of AMRUT 2.0 with all related components of Water Production, Filtration, Storage, Pumping, Distribution Network, reduction in NRW (Non Revenue Water), Water Metering etc. including Survey, Soil Tests and Investigationswith Technical Sanction proposals, preparation of Tender Documents, Office Setup in Kota City,with all Equipments, Furnitures, Softwares, Workshops etc. as per requirement. The work include preparation of Detailed Estimates for all Works, Pipe lines, Plans & L-Sections, Structural Designs & Working Drawings, Electrical and instrumentation drawings and Proof Checking and design consultants for the Project. |
| 3 | Key Personnel / Experts- PART-\" B\" |
| 4 | Team Leader cum Water Supply Expert |
| 5 | Assistant Construction Manager cum Water Supply Expert |
| 6 | Process Expert |
| 7 | Sr. Structural Engineer |
| 8 | Sr. Mechanical Engineer |
| 9 | Sr. Electrical / Instrumentation Engineer |
| 10 | Remuneration (Support Staff) |
| 11 | Support Engineer |
| 12 | Office Manager |
| 13 | Computer Operator / Syst. Admin. |
| 14 | Office Assistant / Utility Person |
| 15 | Local Travels and Office |
| 16 | Vehicles (four wheeler) for movement of staff in project area 2 Nos. |
| 17 | Office Premises |
| 18 | Opearation & Maintanance of Office complete in all respect |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender