Tender For Desilting And Construction Of Baby Pond With Retaining Wall , Bathing Ghat, At Vengattama Kulam At Sembedu Panchayat Under Agamt Scheme 2021-22, arakkonam-Tamil Nadu

Rural Development And Panchayats Department has published Tender For Desilting And Construction Of Baby Pond With Retaining Wall , Bathing Ghat, At Vengattama Kulam At Sembedu Panchayat Under Agamt Scheme 2021-22. Submission Date for this Tender is 07-12-2022. Desilting Tenders in arakkonam Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

35021265
Tender For Desilting And Construction Of Baby Pond With Retaining Wall , Bathing Ghat, At Vengattama Kulam At Sembedu Panchayat Under Agamt Scheme 2021-22
Open Tender
Indian
Tamil Nadu
arakkonam
07-12-2022

Tender Details

Desilting And Construction Of Baby Pond With Retaining Wall , Bathing Ghat, At Vengattama Kulam At Sembedu Panchayat Under Agamt Scheme 2021-22

Key Value

Document Fees
Refer document
EMD
INR 9570.0 /-
Tender Value
INR 9.57 Lakhs /-

BOQ Items

Name of Work : Desilting and construction Of baby pond with Retaining Wall , Bathing Ghat, at Vengattama Kulam at Sembedu Panchayat under AGAMT Scheme 2021-21
Sl. No. Item Description
1DeDesilting and construction Of baby pond with Retaining Wall , Bathing Ghat, at Vengattama Kulam at Sembedu Panchayat
2Clearingthescrubjungle,JullifloraJungleanddisposingofthesameasdirectedbytheEngineer incharge of works and as per technical specification [ specification 2.2]
3Earth work in all soils except hard rock requiring blasting and conveying and formation of bund with 0 to 100m deploying earth moving machineries and tippers including benching, formation of bunds breaking clods, sectioning, labour and Hire charges for closing breaches for extra watering and consolidation by power roller including hire charges etc complete
4Total Earthwork Quantity
5ChannelEarthwork Quantity
6Supplying and fixing of RCC Boundrary Stone of Size 0.15 x0.15x1.60m
7Construction of Retaining wall for Baby Pond
8Earthworkexcavationanddepositingonbank with initial lead and lift in hard gravelly soil, hard stiffclay, blackcottonsoil,hardredearth,shales, murram, and earth muds with 50% fair sized bouldersas per SS 20B for narrow foundation.
9Cement Concrete 1:4:8 mix using 40mm metal includingcostandconveyanceofallmaterialsto work site and all labour charges etc.
10Supplyinganderectingcenteringshutteringwith necessarysupportsincluding cost and conveyance and all labour charges etc.
11CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.
12Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc.,
13Construction of Bathing Ghat, Steps, Outer Platform
14Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay,black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized bouldersas per SS 20B for narrow foundation.
15Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc.
16Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
17CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.
18CC 1:3:6 mix using 20mm metal including cost and conveyance and all labour charges etc.
19CC 1:2:4 mix using 20mm metal including cost and conveyance and all labour charges etc.
20Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc.,
21Construction of Steps over Bund
22Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay,black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized bouldersas per SS 20B for narrow foundation.
23Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc.
24Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
25CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc.
26CC 1:2:4 mix using 20mm metal including cost and conveyance and all labour charges etc.
27Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc.,
28GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail