Drinking Water Supply and Sanitation Government Departments Closing in 0 days TDR #35014156

Tender For Execution Of Clubbed Up 04 Nos Rpws Schemes To Village Sasankhas Banapinjara Sunagadia Bantala Under Tihidi And Bonth Block

Issued by Government Departments · tihidi, Odisha
Tender Value
4.30 Crore
Estimated cost
Bid Submission
17 Dec 2022
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
tihidi → Odisha
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Execution Of Clubbed Up 04 Nos Rpws Schemes To Village Sasankhas Banapinjara Sunagadia Bantala Under Tihidi And Bonth Block

BOQ

Name of Work: EXECUTION OF CLUBBED 04 NOS INDIVISUAL RURAL PIPED WATER SUPPLY SCHEMES TO VILLAGE SASANKHAS UNDER TIHIDI BLOCK BANAPINJARA, SUNAGADIA & BANTALA UNDER BONTH BLOCK INTHE DISTRICT OF BHADRAK
Sl. No. Item Description
1Supplying all materials, labour, T&P, design, drawing ,soil testing etc. complete in all respect for construction of RCC RoofPump House building , construction of Compound wall for Pump House , construction of approach road along with site development including laying, testing and commissioning of Rising main & Distribution system with pipe line such as UPVC,HDPE,ASTM, G.I pipe lines etcalong with required fittings & specials and construction of valve chamber, stand post in pump house, individual house hold connection ,Stand alone, Installation of Chlorination system using bleaching powder solution, installation of submersible pump with motor in deep Tube well etc.(including supply of standby pump motor), internal wiring of Pump house & installation ofvoltage Stabilizer ,external Electrification etc. as per supplied Drawings in Section-7 and detail scope of work & technical specification, quantity of work mentioned in Section-8 and the BOQ in (Annexure-A to I) of Village SASANKHAS. All materials required shall be supplied by the Contractor and the work shall be executed as per terms and condition of DTCN &all construction should be guided by supplied drawings and as per direction of Engineer in Charge
2Design, drawing, construction errection, testing and commissioning of 1.00 lakh ltr. capacity 15 mtr staging RCC Elevated storage reservoir(Circular type with spherical dome) with RCC stair caseas per detailed scope of work & technical specificationmentioned in Section - 5 and in Annexure - H including testing of soil and vetting of the Design & Drawing by the approved State Technical Agency (STA) complete as per direction of Engineer in Charge
3The contractor shall maintain the PWS project for Five (5) calendar years from the completion and official handing over date in a such a manner that all the house hold of the PWS Scheme covered area will get (adequate) required quantity of supply water taking supply hour as 8hours / day without facing any problem. The contractor shall repair and replace any types of defect arising within 24 hr of receipt of complaint either from public or from the Department . The contractor shall maintain all structure of the PWS schemes as per terms and conditions of DTCN &technical specificationmentioned in Section-5
4Supplying all materials, labour, T&P, design, drawing ,soil testing etc. complete in all respect for construction of RCC RoofPump House building , construction of Compound wall for Pump House , construction of approach road along with site development including laying, testing and commissioning of Rising main & Distribution system with pipe line such as UPVC,HDPE,ASTM, G.I pipe lines etcalong with required fittings & specials and construction of valve chamber, stand post in pump house, individual house hold connection ,Stand alone, Installation of Chlorination system using bleaching powder solution, installation of submersible pump with motor in deep Tube well etc.(including supply of standby pump motor), internal wiring of Pump house & installation ofvoltage Stabilizer ,external Electrification etc. as per supplied Drawings in Section-7 and detail scope of work & technical specification, quantity of work mentioned in Section-8 and the BOQ in (Annexure-A to I) of Village BANAPINJARA. All materials required shall be supplied by the Contractor and the work shall be executed as per terms and condition of DTCN &all construction should be guided by supplied drawings and as per direction of Engineer in Charge
5Design, drawing, construction errection, testing and commissioning of 1.00 lakh ltr. capacity 15 mtr staging RCC Elevated storage reservoir(Circular type with spherical dome) with RCC stair caseas per detailed scope of work & technical specificationmentioned in Section - 5 and in Annexure - H including testing of soil and vetting of the Design & Drawing by the approved State Technical Agency (STA) complete as per direction of Engineer in Charge
6The contractor shall maintain the PWS project for Five (5) calendar years from the completion and official handing over date in a such a manner that all the house hold of the PWS Scheme covered area will get (adequate) required quantity of supply water taking supply hour as 8hours / day without facing any problem. The contractor shall repair and replace any types of defect arising within 24 hr of receipt of complaint either from public or from the Department . The contractor shall maintain all structure of the PWS schemes as per terms and conditions of DTCN &technical specificationmentioned in Section-5
7Supplying all materials, labour, T&P, design, drawing ,soil testing etc. complete in all respect for construction of RCC RoofPump House building , construction of Compound wall for Pump House , construction of approach road along with site development including laying, testing and commissioning of Rising main & Distribution system with pipe line such as UPVC,HDPE,ASTM, G.I pipe lines etcalong with required fittings & specials and construction of valve chamber, stand post in pump house, individual house hold connection ,Stand alone, Installation of Chlorination system using bleaching powder solution, installation of submersible pump with motor in deep Tube well etc.(including supply of standby pump motor), internal wiring of Pump house & installation ofvoltage Stabilizer ,external Electrification etc. as per supplied Drawings in Section-7 and detail scope of work & technical specification, quantity of work mentioned in Section-8 and the BOQ in (Annexure-A to I) of Village SUNAGADIA. All materials required shall be supplied by the Contractor and the work shall be executed as per terms and condition of DTCN &all construction should be guided by supplied drawings and as per direction of Engineer in Charge
8Design, drawing, construction errection, testing and commissioning of 0.50 lakh ltr. capacity 15 mtr staging RCC Elevated storage reservoir(Circular type with spherical dome) with RCC stair caseas per detailed scope of work & technical specificationmentioned in Section - 5 and in Annexure - H including testing of soil and vetting of the Design & Drawing by the approved State Technical Agency (STA) complete as per direction of Engineer in Charge
9The contractor shall maintain the PWS project for Five (5) calendar years from the completion and official handing over date in a such a manner that all the house hold of the PWS Scheme covered area will get (adequate) required quantity of supply water taking supply hour as 8hours / day without facing any problem. The contractor shall repair and replace any types of defect arising within 24 hr of receipt of complaint either from public or from the Department . The contractor shall maintain all structure of the PWS schemes as per terms and conditions of DTCN &technical specificationmentioned in Section-5
10Supplying all materials, labour, T&P, design, drawing ,soil testing etc. complete in all respect for construction of RCC RoofPump House building , construction of Compound wall for Pump House , construction of approach road along with site development including laying, testing and commissioning of Rising main & Distribution system with pipe line such as UPVC,HDPE,ASTM, G.I pipe lines etcalong with required fittings & specials and construction of valve chamber, stand post in pump house, individual house hold connection ,Stand alone, Installation of Chlorination system using bleaching powder solution, installation of submersible pump with motor in deep Tube well etc.(including supply of standby pump motor), internal wiring of Pump house & installation ofvoltage Stabilizer ,external Electrification etc. as per supplied Drawings in Section-7 and detail scope of work & technical specification, quantity of work mentioned in Section-8 and the BOQ in (Annexure-A to I) of Village BANTALA. All materials required shall be supplied by the Contractor and the work shall be executed as per terms and condition of DTCN &all construction should be guided by supplied drawings and as per direction of Engineer in Charge
11Design, drawing, construction errection, testing and commissioning of1.50 lakh ltr. capacity 15 mtr staging RCC Elevated storage reservoir(Circular type with spherical dome) with RCC stair caseas per detailed scope of work & technical specificationmentioned in Section - 5 and in Annexure - H including testing of soil and vetting of the Design & Drawing by the approved State Technical Agency (STA) complete as per direction of Engineer in Charge
12The contractor shall maintain the PWS project for Five (5) calendar years from the completion and official handing over date in a such a manner that all the house hold of the PWS Scheme covered area will get (adequate) required quantity of supply water taking supply hour as 8hours / day without facing any problem. The contractor shall repair and replace any types of defect arising within 24 hr of receipt of complaint either from public or from the Department . The contractor shall maintain all structure of the PWS schemes as per terms and conditions of DTCN &technical specificationmentioned in Section-5

AI Tender Summary

OUR REF NO 35014156
AUTHORITY Government Departments
TENDER VALUE 4.30 Crore
LAST DATE 17-12-2022
Authority
Authority Name Rural Water Supply And Sanitation Circle
Work Description Execution Of Clubbed Up 04 Nos Rpws Schemes To Village Sasankhas Banapinjara Sunagadia Bantala Under Tihidi And Bonth Block
Basic Detail
Tender No EE RWSandS BDK 24 Dt-18.11.2022
Bidding Type Tender
Location
City tihidi
State Odisha
Key Dates
Publish Date 28 Nov 2022
Submission Date 17 Dec 2022
Open Date 19 Dec 2022
Finance
Tender Value 4.30 Crore
Tender Fee 10000
EMD Ref. Documents
Exemption Not Available
Document List
eae11440-6167-43b0-a5dd-d0e5e3f845a0.html
BOQ_418538.xls
DTCNSasankhas.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 28, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 17, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Dec 19, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

eae11440-6167-43b0-a5dd-d0e5e3f845a0.html

xls

BOQ_418538.xls

pdf

DTCNSasankhas.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders