Survey And Profile Work Of Location Route Length For Diversion Of 400 Kv Rewa Road Line & 220 Kv Sarangapur-Phulpur Line Due To Nh Ring Road Under Electy. Trans. Division-I, Prayagraj.
Tender Overview
Project Description
Survey And Profile Work Of Location Route Length For Diversion Of 400 Kv Rewa Road Line & 220 Kv Sarangapur-Phulpur Line Due To Nh Ring Road Under Electy. Trans. Division-I, Prayagraj.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 03-Dec-2022 | DA138 | Date | 17-Dec-2022 |
| 2 | 19-Dec-2022 | D138 | Date | 04-Jan-2023 |
| 3 | 04-Jan-2023 | dd138 | Date | 19-Jan-2023 |
| 4 | 19-Jan-2023 | DA13822 | Date | 27-Jan-2023 |
| 5 | 27-Jan-2023 | DT138 | Date | 09-Feb-2023 |
| 6 | 10-Feb-2023 | DX138 | Date | 16-Feb-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | The detailed survey using GPS, Total stations, digital theodolites etc. alongwith the approved route alignment. Complete profiling along the route using modern surveying equipment viz. total stations, GPS, digital theodolite, long range scanners etc. Reference levels at every 20 meters along the route are to be recorded. R/Ls at other undulations along the route as well as in the route plan and other enrooted details viz. crossing, building & structure, trees & other infrastructure etc shall also be recorded. Route alignment of proposed diverted route, existing route alongwith NH (Ring Road) route alignment using lastest satellite imageries superimposed on survey of India topographical map. Preparation and submission of KML/KMZ file. Areas along the route, which in the view of the contractor, are not suitable for tower spotting, shall also be marked. After carrying out the detailed survey, the contractor shall estimate complete BOQ of the transmission lines and submit the same to the UPPTCL. Line crossing at following location. |
| 2 | 400KV Obra B-Rewa-Road Line Tower location No. 462-463 |
| 3 | 220 KV Sarangapur-Phulpur Line Tower location No. 2-3Tower location No. 21-22Tower location No. 85-86 Tower location No. 100-101 |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-6 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender