| 1 | EARTH WORK INEXCAVATION IN FOUNDATION Trenches in hard soil (vide classification of soil item -B) all complete as per approved design, building specification and direction of E/I(5.1.1+5.1.2) |
| 2 | Providing coarse clean SAND FILLING in foundation trenches or plinth including ramming & watering in layers not exceeding 150 mm thick with all leads and lift including cost of materials, labour, royalty & taxes all complete as per building specification and direction of E/I.(5.1.10) |
| 3 | Providingdesignation75BoneBRICK FLATSOILING joint filled withlocalsandincluding cost of watering taxesroyalty all complete as per building specification and direction of E/I(5.6.3) |
| 4 | ProvidingP.C.C.M-150 withnominalmix (1:2:4)in foundation&plinthwith approved Qualityof stone metal grade-III(50 mmto 25 mmsize) cleancoarseand of FM2.5to3includingscreening shutteringmixingcementconcretein cementmixer, curing,royaltyandtaxesall ---------do------(5.3.1.2) |
| 5 | ProvidingR.C.C.M-200with nominal mix (1:3/2:3)infoundation & plinth with approvedQualityofstonemetal grade-III(50 mm to25 mmsize) cleancoarse and of FM2.5to3includingscreening shuttering mixing cement concrete incementmixer, ------do-----(5.3.9.1) |
| 6 | ProvidingR.C.C.M-200with nominal mix (1:3/2:3)inColumn withapprovedQualityofstonemetal grade-III(50 mm to25 mmsize) cleancoarse and of FM2.5to3includingscreening shuttering mixing cement concrete incementmixer, ------do-----(5.3.10) |
| 7 | Providing T.M.T. reinforcement of following dia rods as per approved design and drawing including carriage of M.S. Rods of (straight or in coils) to work site cutting, bending and binding with annealed wire with cost of wire removal of rust placing the rods in position all complete as per building specification and direction of E/ I 30%Steel of 8mm=(5.5.4) |
| 8 | 70 % Steel of 10mm =(5.5.5/B) |
| 9 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.(DSR/10.2) |
| 10 | Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws completeRidges plain (500 - 600mm)DSR/12.51.1 |
| 11 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-incharge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineerin- charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shapewherever required.DSR/12.50 |
| 12 | Providing primer one coat of red lead paint of approved make over new steel surface including preparing the surface after cleaning, removing rust , dirt, , scales , smokes and grease and cleaning the surface thoroughly including cost of scaffolding and taxes all complete as per building specification and direction of E/l. ( Mode of measurement Area shall be multiplied by the co-efficient as indicated in building specification)(5.8.41) |
| 13 | Providing two coats of synthetic enamel paint of approved shade and make over steel surface including cleaning the surface thoroughly, scaffolding and taxes all complete as per building specification and direciton of E/l.(5.8.45) |
| 14 | Carriage of cost.:-(I) sand |
| 15 | (II) Stone chips |
| 16 | (III) Bricks |
| 17 | (IV) Cement |
| 18 | (v) Steel |
| 19 | GST @ 18% |
| 20 | Labour cess @ !% |