Material Requirement For Construction Of Nrlm Sanjeevini Shed In Padubidri Gp Limit, Kaup Tp. , Cleat Angles, Coarse Sand ( Zone Iii ) , Polyenthylene Water Storage Tank Of Specified Capacity L, Mason Class I ( With Tools ) , Binding Wire, M.S Rods, Formwork, Centering & Scaffolding For Beams & Lintels Of Building - 20%, Broken Stone Aggregate 20 Mm Size, Broken Stone Aggregate 12 Mm To 10 Mm Size, Add Over Head Charges 10%, Unit Cost As Per The Specification, Alluminium Handles - 15 Mm, Mathi / Nandi Wood Scantling, Alluminium Tower Bolt - 20 Cm, White Cement Based Putty @ 2Sqm / Kg At Rs. 1050 Per Kgs, Adhesive For Joints, Solid Concrete Block ( 40*15*20 Cms ) - 5.00 N / Sqmm, High Bond Tile Adhesive For Vitrified Tiles, Fitter Class I, Add Providing And Removing Scaffolding At 3% On Labour, Casurina Poles 100 - 150 Mm, Formwork, Centering & Scaffolding For Plastering & Painting Of New Walls - 25%, Fabricator, Vitrified Tiles 600X600 Mm, Nylon Rollers, Mixer ( Concrete Small Used In Culvert ) , Add Sundries Charges At 1 % On Material, Enamel Metal Paint, Add Brush, Putty, Sand Paper, Roller At 5% On Cost Of Paint, Chrominum Plated Screws, Rubber Beading For Shutters Beading, 5.50 Mm Thick Plain Glass, Mixer ( Concrete ) - 1 Cum Capacity, Hom Of Vibrator 0.71 Days, Soild Partical Board Flush Doors 30 Mm Thick, Add Watering Charges At 1 % On Material, Portland Cement, Pvc Beading, Ms Flat, Add Cutting And Other Wastage 5%, Add 15% Wastage For Glass, Transportation / Loading And Unloading Of Material / Lifting Of Material / Wastage / Unforeseen Charges / Miscellaneous Which Are Necessary During Execution., Formwork, Centering & Scaffolding For Chejjas, Canopy & Other Architectural Projections Of Minor Sections - 45%, Formwork, Centering & Scaffolding For Columns & Piers - 10%, Aluminium Window Frame Section 1.20 Mm Thick, Formwork, Centering & Scaffolding For Roof ( Straight & Arched ) - 20%, Add Handling , Loading And Unloading At 2% On Material, Handling Loading And Unloading 3% On Material, Tmt Bars Fe 500, Labour Charges For Lifting And Placing In Position And Making Connection At 7% On Material, Add Hom Of Welding And Grinding Machine @ 4% On Material, Enamel Paint, Ready Mix Primer Paint ( Ready Mix Red Lead Paint ) , Add Hom Of Welding And Grinding Machine @ 2% On Material, Broken Stone Aggregate 40 Mm Size, Plastic Emulsion Paint, Formwork, Centering & Scaffolding For Plastering & Painting Of Ceiling - 25%, Add Sundries Charges At 2 % On Material, Welder Grade I, Plasticizer / Super Plasticizer, Add Handling , Loading And Unloading At 1% On Material, Painter Class I